{{Short description|State highway in Cameron County, Texas, United States}} {{Use American English|date=April 2025}} {{Use mdy dates|date=January 2025}}
{{Infobox road |header_type=UC |state=TX |type=SH |route=104 |map= |map_custom= |map_notes= |length_mi=11.1 |length_ref=<ref name="MO 116614">{{cite web |author = Texas Transportation Commission |date = December 12, 2023 |title = Minute Order 116614 |url = https://ftp.txdot.gov/pub/txdot/commission/2023/1212/9.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> |established=2023<ref name="MO 116614"/> |direction_a=West |terminus_a={{jct|state=TX|FM|106}} |direction_b=East |terminus_b={{jct|state=TX|PR|100}} in South Padre Island |counties=Cameron |previous_type=SH |previous_route=103 |next_type=SH |next_route=105 }}
'''State Highway 104''' ('''SH 104''') is a proposed state highway which will run between Farm to Market Road 106 (FM 106) and Park Road 100 (PR 100) in South Padre Island in Cameron County, Texas, United States.
==History==
===Former routes=== A previous route numbered SH 104 was designated on May 25, 1925, as a connector route from Ranger to Morton Valley.<ref>{{cite web |author = Texas Transportation Commission |date = May 26, 1926 |title = Minutes of Seventy-Fifth Meeting of the State Highway Commission |url=https://publicdocs.txdot.gov/minord/MinuteOrderDocLib/003676907.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> On March 28, 1927, this was renumbered to SH 103, as old SH 103 was conditional.{{citation needed|date=December 2023}}
Instead, SH 101, a connector route from Georgetown east to SH 95 at Circleville, was renumbered to SH 104 to avoid duplication with another SH 101. On May 28, 1932, the route was extended west to reach Liberty Hill,<ref>{{cite web |author = Texas Transportation Commission |date = May 26, 1932 |title = Minutes of the One Hundred and Fifty Fourth Meeting of the State Highway Commission |url=https://publicdocs.txdot.gov/minord/MinuteOrderDocLib/003673814.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> and it was completed by 1936. The highway was transferred to SH 29 on August 22, 1951, when it was extended after being supplanted by US Highway 183 on May 23, 1951.<ref>{{TxDOT|SH|104|access-date=December 15, 2023|link = no}}</ref>
===Current route=== SH 104 was designated on December 12, 2023, on its proposed route.<ref name="MO 116614"/>
==See also== *{{portal-inline|U.S. Roads}} *{{portal-inline|Texas}}
==References== {{reflist}}
==External links== *{{commons category-inline|Texas State Highway 104}}
{{authority control}}
104 Category:Transportation in Cameron County, Texas Category:Proposed state highways in the United States