{{Short description|State highway in Cameron County, Texas, United States}} {{Use American English|date=April 2025}} {{Use mdy dates|date=January 2025}}

{{Infobox road |header_type=UC |state=TX |type=SH |route=104 |map= |map_custom= |map_notes= |length_mi=11.1 |length_ref=<ref name="MO 116614">{{cite web |author = Texas Transportation Commission |date = December 12, 2023 |title = Minute Order 116614 |url = https://ftp.txdot.gov/pub/txdot/commission/2023/1212/9.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> |established=2023<ref name="MO 116614"/> |direction_a=West |terminus_a={{jct|state=TX|FM|106}} |direction_b=East |terminus_b={{jct|state=TX|PR|100}} in South Padre Island |counties=Cameron |previous_type=SH |previous_route=103 |next_type=SH |next_route=105 }}

'''State Highway 104''' ('''SH&nbsp;104''') is a proposed state highway which will run between Farm to Market Road&nbsp;106 (FM&nbsp;106) and Park Road&nbsp;100 (PR&nbsp;100) in South Padre Island in Cameron County, Texas, United States.

==History==

===Former routes=== A previous route numbered SH&nbsp;104 was designated on May 25, 1925, as a connector route from Ranger to Morton Valley.<ref>{{cite web |author = Texas Transportation Commission |date = May 26, 1926 |title = Minutes of Seventy-Fifth Meeting of the State Highway Commission |url=https://publicdocs.txdot.gov/minord/MinuteOrderDocLib/003676907.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> On March 28, 1927, this was renumbered to SH&nbsp;103, as old SH&nbsp;103 was conditional.{{citation needed|date=December 2023}}

Instead, SH&nbsp;101, a connector route from Georgetown east to SH&nbsp;95 at Circleville, was renumbered to SH&nbsp;104 to avoid duplication with another SH&nbsp;101. On May 28, 1932, the route was extended west to reach Liberty Hill,<ref>{{cite web |author = Texas Transportation Commission |date = May 26, 1932 |title = Minutes of the One Hundred and Fifty Fourth Meeting of the State Highway Commission |url=https://publicdocs.txdot.gov/minord/MinuteOrderDocLib/003673814.pdf |publisher = Texas Department of Transportation |access-date = December 15, 2023 }}</ref> and it was completed by 1936. The highway was transferred to SH&nbsp;29 on August 22, 1951, when it was extended after being supplanted by US Highway&nbsp;183 on May 23, 1951.<ref>{{TxDOT|SH|104|access-date=December 15, 2023|link = no}}</ref>

===Current route=== SH&nbsp;104 was designated on December 12, 2023, on its proposed route.<ref name="MO 116614"/>

==See also== *{{portal-inline|U.S. Roads}} *{{portal-inline|Texas}}

==References== {{reflist}}

==External links== *{{commons category-inline|Texas State Highway 104}}

{{authority control}}

104 Category:Transportation in Cameron County, Texas Category:Proposed state highways in the United States