{{short description|Highway in Tennessee}} {{Use American English|date=April 2025}} {{Use mdy dates|date=February 2024}} {{Infobox road |state=TN |type=Sec |route=317 |alternate_name= |maint=[[Tennessee Department of Transportation|TDOT]] |map= |length_mi=21.3 |length_round= |length_ref= |established=July 1, 1983<ref name="TRB">{{cite magazine |date = September 2014 |title = The Road To 100 Years |url = https://www.tn.gov/content/dam/tn/tdot/documents/100years/TRBA-TDOT-TURNS100.pdf |magazine = Tennessee Road Builder |volume = 17 |issue = 5 |page = 22 |access-date = April 6, 2019 }}</ref> |direction_a=West |terminus_a={{Jct|state=TN|Sec|17}} in [[Chattanooga, Tennessee|Chattanooga]] |junction= *{{Jct|state=TN|SR|153}} in Chattanooga *{{Jct|state=TN|US|11|US|64}} in [[Tyner, Tennessee|Tyner]] *{{Jct|state=TN|I|75|US|74}} near [[Collegedale, Tennessee|Colledgedale]] |direction_b=East |terminus_b={{Jct|state=TN|TN|60}} near [[Red Clay State Park]] |counties=[[Hamilton County, Tennessee|Hamilton]], [[Bradley County, Tennessee|Bradley]] |previous_type=Sec |previous_route=316 |next_type=Sec |next_route=318 }}

'''State Route 317''' ('''SR&nbsp;317''') a state highway extending from [[Chattanooga, Tennessee]], through [[Ooltewah, Tennessee|Ooltewah]], [[Collegedale, Tennessee|Collegedale]], [[Apison, Tennessee|Apison]], and ending in [[Bradley County, Tennessee|Bradley County]]. SR&nbsp;317 is also known as Bonny Oaks Drive, Volkswagen Drive, Apison Pike, Wesleyan Road, and Weatherley Switch Road SE; it was formerly known as [[Lee Highway|Old Lee Highway]]. It dead ends into [[Tennessee State Route 60|SR&nbsp;60]] in Bradley County. In Chattanooga, this road crosses [[Tennessee State Route 58|SR&nbsp;58]].<ref name=Google>{{google maps |url = https://www.google.com/maps/place/TN-317,+Tennessee/@35.054226,-85.0543302,13z/data=!4m2!3m1!1s0x88607c61f1b98fc9:0xd417d62283405472?gl=us |title = TN-317 }}</ref>

==History== The section between SR&nbsp;17 and US&nbsp;11/64 was originally numbered as SR&nbsp;2A around 1934. This route was renumbered to SR&nbsp;317 during the [[1983 Tennessee state highway renumbering]].<ref name="TRB"/>

In between Chattanooga and Collegedale SR&nbsp;317 formerly went along Old Lee Highway to Apison Pike. It has been since rerouted with the completion of the Volkswagen Drive exit on I-75. It now joins I-75 at exit&nbsp;7 and [[concurrency (road)|runs concurrently]] with I-75 to exit&nbsp;9, where SR&nbsp;317 turns along Volkswagen Drive to Apison Pike.

The [[Tennessee Department of Transportation]] (TDOT) is working to widen and improve the {{convert|6.2|mi|km|adj=on}} Apison Pike section of SR&nbsp;317, located between I-75 and SR&nbsp;320 (East Brainerd Road) in four separate phases.<ref name=tdot>{{cite web |url = https://www.tn.gov/tdot/projects/region-2/apison-pike.html |title = State Route 317 (Apison Pike) |author = <!--Not stated--> |publisher = Tennessee Department of Transportation |access-date = August 20, 2020 }}</ref> Phase&nbsp;1 consisted of constructing a new five-lane (including two-way left turn lane) road between I-75 and Old Lee Highway, part of the relocated section of SR&nbsp;317. Phase&nbsp;2, which took place between January 2015 and September 13, 2017, widened the segment between Old Lee Highway and SR&nbsp;321 (Ooltewah-Ringgold Road) from two to five lanes at a cost of $24.2&nbsp;million.<ref>{{cite press release |author = <!--Staff writer(s); no by-line.--> |title = TDOT Holds Ribbon Cutting on SR-317 (Apison Pike) Project in Collegedale |url = https://preprod.tn.gov/tdot/news/2017/9/13/tdot-holds-ribbon-cutting-on-sr-317-apison-pike-project-in-collegedale.html |publisher = Tennessee Department of Transportation |date = September 13, 2017 |access-date = August 20, 2020 }}</ref> Phase&nbsp;3, which began on March 13, 2020, was the most complex and expensive phase. It was initially bid at a cost of $93.1&nbsp;million, but ballooned to $98&nbsp;million. It involved widening the route from two to five lanes between SR&nbsp;321 and Layton Lane, including an entirely new alignment in some places.<ref>{{cite news |author = <!--Staff writer(s); no by-line.--> |title = Tennessee Breaks Ground on $93M Highway Project |url = https://aashtojournal.org/2020/03/20/tennessee-breaks-ground-on-93m-highway-project/ |work = AASHTO Journal |date = March 20, 2020 |access-date = August 20, 2020 }}</ref> The new alignment opened on June 25, 2025,<ref>{{cite news |title=Apison Pike bridge opens, expanding Chattanooga's connection to nearby suburbs |url=https://newschannel9.com/news/local/apison-pike-bridge-opens-expanding-chattanoogas-connection-to-nearby-suburbs |access-date=May 31, 2026 |work=WTVC |date=June 25, 2025 |location=Chattanooga}}</ref> and a dedication ceremony for substantial completion of the project was held on July 15, 2025. Final work was completed over the next few months.<ref>{{cite news |last1=Benton |first1=Ben |title=State road projects in Collegedale and Cleveland officially opened; Orange barrels remain where last details wrapping up |url=https://www.timesfreepress.com/news/2025/jul/15/state-road-projects-in-apison-cleveland/ |url-access=limited |access-date=November 30, 2025 |work=Chattanooga Times Free Press |date=July 15, 2025}}</ref> Phase&nbsp;4, the final phase, will widen SR&nbsp;317 between Layton Lane and SR&nbsp;320.<ref name=tdot/>

==Junction list== {{mileposts}} {{jcttop|length_ref=}} {{TNint |county=Hamilton |cspan=6 |location=Chattanooga |lspan=2 |mile=0.0 |road={{jct|state=TN|Sec|17|to2=TO|TN|58|TN|153|name1=Bonny Oaks Drive|city1=Chattanooga|city2=Harrison}} |notes=Western terminus }} {{TNint |mile= |road={{jct|state=TN|TN|153|city1=Soddy Daisy|city2=Lakesite|city3=Chattanooga}} |notes=SR 153 exit&nbsp;4 }} {{TNint |location=Tyner |lspan=2 |mile= |type=concur |road={{jct|state=TN|US|11|dir1=south|US|64|dir2=west|name2=[[Lee Highway]]/[[Tennessee State Route 2|SR 2]] west|city1=Chattanooga}} |notes=Western end of US&nbsp;11/US&nbsp;64/SR&nbsp;2 concurrency }} {{TNint |mile= |type=concur |road={{jct|state=TN|I|75|US|74|dir1=south|dir2=west|city1=Chattanooga|location2=[[Atlanta, Georgia|Atlanta]]}} |notes=Western end of I-75/US&nbsp;74 concurrency; I-75/US&nbsp;74 exit&nbsp;7 }} {{TNint |location=Ooltewah |mile= |type=concur |road={{jct|state=TN|I|75|dir1=north|US|11|dir2=north|US|64|dir3=east|US|74|dir4=east|name4=[[Tennessee State Route 2|SR 2]] east|city1=Cleveland|city2=Knoxville}} |notes=Eastern end of I-75/US&nbsp;11/US&nbsp;64/US&nbsp;74/SR&nbsp;2 concurrency; I-75/US&nbsp;11/US&nbsp;64/SR&nbsp;2 exit&nbsp;9 }} {{TNint |location=Collegedale |mile= |road={{jct|state=TN|Sec|321|name1=Ooltewah Ringgold Road|location1=[[Ringgold, Georgia|Ringgold]]|city2=Ooltewah}} |notes= }} {{TNint |county=Bradley |cspan=2 |location=none |mile= |road=Red Clay Park Road Southwest – [[Red Clay State Park]] |notes= }} {{TNint |location=none |mile=21.3 |road={{jct|state=TN|TN|60|name1=Dalton Pike|city1=Cleveland|location2=[[Dalton, Georgia|Dalton]]}} |notes=Eastern terminus }} {{jctbtm|keys=concur}}

==References== {{reflist}}

[[Category:State highways in Tennessee|317]]