SITVA
Line number
  • Níquia-La Estrella
  • San Antonio-San Javier
  • Oriente-Villa Sierra
  • San Javier-La Aurora
  • Acevedo-Santo Domingo
  • Santo Domingo-Arví
  • Miraflores-Trece de Noviembre
  • Acevedo-El Progreso
  • U. de M.-Parque Aranjuez/Ferrocarril Ave.
  • U. de M.-Parque Aranjuez/Oriental Ave.
  • South Corridor (under construction)
  • San Antonio-Oriente
  • Caribe-La Palma
Area servedAburrá Valley
System length85.12 km (52.9 mi)[1]
Vehicles
  • 80 trains (3 cars per train)
  • 499 gondolas
  • 31 articulated buses (30 natural gas + 1 electric)
  • 111 feeding buses (47 natural gas + 64 electric)
  • 12 Translohr[1]
WebsiteSITVA
Annual ridership446.3 million (2025)[2]
Ridership1.2 million (weekday 2023)[3]
Stations
  • 42 stations
  • 28 tram and BRT stops
  • 24 bus stops[1]
Lines12[4]
LocaleMedellín Metropolitan Area, Antioquia, Colombia
OwnerDepartment of Antioquia, Medellín City
Caption 2Train near Berrío Park station

The Aburrá Valley Integrated Transport System (SITVA, Spanish: Sistema Integrado de Transporte del Valle de Aburrá) is the public transportation system of Medellín and its metropolitan area. It allows people from the Metropolitan Area of Medellín to move across the ten Aburrá Valley municipalities using different transport modes. It uses integrated fares and a single payment card (Cívica card).

Components

SITVA includes the Medellín Metro, currently comprising two lines: Line A, which is 25.8 kilometres (16.0 mi) long and serves 21 stations, and Line B, which is 5.5 kilometres (3.4 mi) long and serves 6 stations (plus San Antonio station, the transfer station with Line A). There is also a tram line: Line T (Ayacucho Tram).[1][4]

Additionally, the aerial cable car system, Metrocable, which supplements the metro system, comprises six lines: Line J with 3 stations (plus one transfer station with Metro Line B),[4][1] Line K with 3 stations (plus one transfer station with Metro Line A and one with Line L),[1][4] Line L with one station (plus one transfer station with Line K), Line H with two stations (plus one transfer station with Line T), Line M with two stations (plus one transfer station with Line T) and Line P with 3 stations (plus one transfer station with Metro Line A).[4] SITVA also integrates a bus rapid transit (BRT) system (Metroplús), a minibus network called Sistema Integrado de Transporte (SIT) in Spanish and a bicycle-sharing system (EnCicla).

As of 2026, there are 26 metro stations, 14 Metrocable stations, 2 tramway stations (+ 6 tram stops), 22 BRT stops (+ 24 bus stops) in the SITVA network,[3] all listed in the following table; for a total of 42 stations, 28 tram and BRT stops, and 24 bus stops. Transfer stations are in bold, and the transfer station between metro lines A and B is shown in bold-italic:

NameStationsDate of openingFleetCommercial speedCapacity (per vehicle)Capacity (passengers/h-direction)Travel time one journeyTop frequency (rush hour)
Metro services


Line A

North to South
25.8 km (16.0 mi)[1]
21 stations[4]

30 November 199580 three-car trains; for a total of 240 cars40 km/h (25 mph); max. speed 80 km/h (50 mph)300 users per car41,48042 minutes3 minutes
Line B
Center to West
5.5 km (3.4 mi)[1]
7 stations[4]
29 February 199616,23110.5 minutes3:50 minutes
Metrocable services
Line K
North to Northeast
2.07 km (1.29 mi)[1]
4 stations[4]
7 August 200493 gondolas18 km/h (11 mph)8 users sitting, 2 standing; for a total of 10 users per gondola3,0009 minutes0:12 minutes
Line J
West to North
2.7 km (1.7 mi)[1]
4 stations[4]
3 March 2008119 gondolas12 minutes
Line L
Northeast to far Northeast
4.8 km (3.0 mi)[1]
2 stations[4]
9 February 201055 gondolas1,20015 minutes0:14 minutes
Line H
East to far Northeast
1.4 km (0.87 mi)[1]
3 stations[4]
  • Oriente
  • Las Torres
  • Villa Sierra
17 December 201644 gondolas1,8005 minutes0:13 minutes
Line M
East to Northeast
1.05 km (0.65 mi)[1]
3 stations[4]
  • Miraflores
  • El Pinal
  • Trece de Noviembre
28 February 201949 gondolas2,5004 minutes0:09 minutes

Line P

West to Northwest

2.7 km (1.7 mi)[1]

3 stations[4]

  • Acevedo
  • SENA
  • Doce de Octubre
  • El Progreso
10 June 2021138 gondolas19 km/h (12 mph)10 users sitting, 2 standing; for a total of 12 users per gondola4,00010 minutes0:11 minutes
BRT services
Line 1
West to Northeast
12.5 km (7.8 mi)[1]
20 stations[4]
  • U. de M.
  • Los Alpes
  • La Palma
  • Parque Belén
  • Rosales
  • Fátima
  • Nutibara
  • Industriales
  • Plaza Mayor
  • Cisneros
  • Minorista
  • Chagualo
  • U. de A.
  • Hospital
  • Palos Verdes
  • Gardel
  • Manrique
  • Las Esmeraldas
  • Berlín
  • Parque Aranjuez
22 December 201130 gas working buses, 1 fully electric bus; for a total of 31 articulated buses16 km/h (9.9 mph); max. speed 60 km/h (37 mph)154 users per bus3,27045 minutes2:45 minutes

Line 3

Southwest/Southeast

South CorridorUnder development
Feeding bus services
Line 2
West to Northeast
13.5 km (8.4 mi)[1]
15 stations + 8 stops[4]
  • U. de M. (station)
  • Los Alpes (station)
  • La Palma (station)
  • Parque Belén (station)
  • Rosales (station)
  • Fátima (station)
  • Nutibara (station)
  • Industriales (station)
  • Barrio Colombia
  • San Diego
  • Barrio Colón
  • San José
  • La Playa
  • Catedral Metropolitana
  • Palos Verdes (station)
  • Gardel (station)
  • Manrique (station)
  • Las Esmeraldas (station)
  • Berlín (station)
  • Parque Aranjuez (station)
22 April 201347 gas feeding buses13 km/h (8.1 mph); max. speed 60 km/h (37 mph)90 users per bus1,41752 minutes4:17 minutes
Line O
North to South
9 km (5.6 mi)[1]
27 stops[4]
2 December 201964 electric buses13 km/h (8.1 mph); max. speed 60 km/h (37 mph)80 users per bus80045 minutes6:00 minutes
Tram services
Line T
Center to East
4.2 km (2.6 mi)[1]
3 stations + 6 stops[4]
  • San Antonio (station)
  • San José
  • Pabellón del Agua
  • Bicentenario
  • Buenos Aires
  • Miraflores (station)
  • Loyola
  • Alejandro Echavarría
  • Oriente (station)
31 March 201612 tramway vehicles16 km/h (9.9 mph); max. speed 70 km/h (43 mph)300 users per tram3,80719 minutes4:44 minutes
Total
65 stations (48 stops)Oldest: 30 November 1995 Newest: 6 June 2021

240 cars 498 gondolas

31 articulated buses

111 feeding buses

12 tramway

Fastest: max. speed 80 km/h (50 mph) Slowest: 13 km/h (8.1 mph)Most capacity: 300 users per car/tram Least capacity: 10 users per gondola82,502Fastest journey: 4 minutes Slowest journey: 52 minutesLeast wait time: 0:09 minutes Most wait time: 6:00 minutes

Expansions

Metrocable

On 7 August 2004,[5] the city inaugurated a new line known as "Metro Cable" (Line K). The line starts in the Acevedo Station and goes to the up hill district of Santo Domingo Savio.[6] This important addition integrated new additions to the city that since the 1960s that previously were not considered part of the "real city".

On 3 March 2008,[5] a second "Metro Cable" line (Line J) was inaugurated. The line starts in the San Javier Station and goes through Juan XXIII and Vallejuelos to the La Aurora district.[6] This new line benefits approximately 150,000 new users.

A new Metrocable line (line L) was inaugurated in 2009[5] with a transfer station at Santo Domingo Savio Station. This line continues further uphill to El Tambo[6] in Arví park near Guarne. The reason for constructing this line is because the city wants to promote tourism in the rural area near Lake Guarne. It takes 14 minutes to ascend to El Tambo and there are no intermediate stations.

On June 10, 2022 there was a new "Metro Cable" line (Line P). The line starts from the Acevedo station and goes all the way to the El Progreso station, in the northwest. It takes approximately 10 minutes to go through all the stations, and it benefits 200,000 people.

Line A extension

Line A was expanded from Itagüí to La Estrella, in the south of the metropolitan area. A new intermediate station, Sabaneta, built near 67th South Street, was opened on 5 August 2012[7] and the final station, La Estrella, was built near 77th South Street and opened on 17 September 2012.[8]

Train line

In February 2020 it was announced that Medellín will reactivate the train line between Bello and Caldas.[9]

References

  1. ^ "Metro facts". Medellín Metro. 16 Jun 2021.
  2. ^ "Anexos Encuesta de Transporte Urbano de Pasajeros (ETUP) IV trimestre de 2025". sheet 13
  3. ^ "Memoria de Sostenibilidad 2023". pp. 25-26.
  4. ^ "Metro map". Medellín Metro. Retrieved 16 May 2020.
  5. ^ "Historia" [History] (in Spanish). Metro de Medellín. 4 January 2016. Archived from the original on 25 April 2016. Retrieved 15 January 2016.
  6. ^ "Metrocable - Metrocable Lines". Metro de Medellín. 15 November 2013. Archived from the original on 2015-06-10. Retrieved 16 November 2013.
  7. ^ "ESTE DOMINGO 5 DE AGOSTO INICIA LA OPERACIÓN COMERCIAL HASTA LA NUEVA ESTACIÓN SABANETA" (in Spanish). Retrieved 5 January 2013.
  8. ^ "ESTE LUNES 17 DE SEPTIEMBRE EL METRO INAUGURARÁ LA EXTENSIÓN AL SUR" (in Spanish). Retrieved 5 January 2013.
  9. ^ El Colombiano. "Antioquia definió el primer tramo para reactivar su ferrocarril". Retrieved 22 February 2020.