Revelstoke Dam
Dam crossesColumbia River
LocationRevelstoke, Canada
Dam height175 m (574 ft)
Opening1984
Res nameLake Revelstoke
Res capacity total1.5183 km3
Res surface11,534 ha (28,501 acres) or 115 km2 (44 sq mi)
Plant operatorBC Hydro
Plant turbines5
Plant capacity2,480 MW
Plant capacity factor36%
Plant annual gen7,817 GWh[1]
Plant commission1984[2]
Coordinates51°02′58″N 118°11′38″W

Revelstoke Dam, also known as Revelstoke Canyon Dam, is a hydroelectric dam (combined earthfill dam and gravity dam) spanning the Columbia River, 5 km (3.1 mi) north of Revelstoke, British Columbia, Canada. The powerhouse was completed in 1984 and has an installed capacity of 2480 MW.[2] Four generating units were installed initially, with one additional unit (#5) having come online in 2011. The reservoir behind the dam is named Lake Revelstoke.[3] The dam is operated by BC Hydro.

History

Construction of Revelstoke Dam started in 1978, and was completed in 1983.[4]

Areas inundated by the dam include the Dalles des Morts or "Death Rapids", which was the stretch of canyon just above the dam's location, and various small localities along the pre-inundation route of the Big Bend Highway, which was the original route of the Trans-Canada Highway until the building of its Rogers Pass section. Just below the dam was the location of La Porte, one of the boomtowns of the Big Bend Gold Rush and the head of river navigation via the Arrow Lakes and the Columbia River from Marcus, Washington.

Revelstoke Dam Visitor Centre

The Revelstoke Dam Visitor Centre is located 5 km (3.1 mi) north of Revelstoke and is open seasonally. The centre features interactive exhibits, activities about the dam and hydroelectricity and a First Nations gallery opened in 2009, with exhibits about the art, history and culture of the Secwepemc (Shuswap), Okanagan and Ktunaxa peoples. Sinixt is not included in the exhibit, but the Revelstoke Dam is considered to fall within their territory.[5] There is also a theatre, gift shop, and outdoor walkway across the top of the Powerhouse.

Expansion

BC Hydro completed an expansion to add a fifth unit. The unit went online in 2011 and added 500 MW capacity, bringing the total generating capacity of the dam to around 2480 MW.[6][7] In 2009, the plant generated 6,361 GWh of electricity.[8] By 2018, after the expansion, then plant generated 7,817 GWh of electricity. The dam was built to accommodate a sixth unit, also sized around 500 MW; a contingency plan to build the sixth unit is possible but not scheduled as of December 2018.[1]

See also

References

  1. ^ BC Hydro (December 2018). "Revelstoke Generating Station Unit 6 Project". Archived January 29, 2019 at the Wayback Machine.
  2. ^ BC Hydro (June 2010), "Quick Facts for the Year Ended March 31, 2010", archived from the original on March 5, 2012, retrieved 2010-08-24
  3. ^ "Lake Revelstoke". 40325.
  4. ^ "Revelstoke Dam". Virtual Museum. Archived from the original on April 29, 2020.
  5. ^ "Sinixt Territory - Sinixt Nation". www.sinixtnation.org
  6. ^ "Revelstoke Dam Visitor Centre". www.bchydro.com
  7. ^ "Page or File Not Found". www.bchydro.com. Archived from the original on 2009-03-31.
  8. ^ Communications, Forum One. "CARMA - Carbon Monitoring for Action". carma.org. Archived March 4, 2016 at the Wayback Machine.