PSLV-C3
OperatorISRO
WebsiteISRO website
Mission duration1,658 seconds
Suborbital apogee586.7 kilometres (365 mi)
SpacecraftPolar Satellite Launch Vehicle
Expendable launch vehiclePolar Satellite Launch Vehicle
ManufacturerISRO
Launch mass294,000 kilograms (648,000 lb)
Payload mass1,294 kilograms (2,853 lb)
Dimensions44.4 metres (146 ft)
(overall height)
Launch dateOctober 22, 2001 (IST)
Launch rocketPolar Satellite Launch Vehicle
Launch siteSriharikota Launching Range
Launch contractorISRO
DeactivatedOctober 22, 2001
Orbit referenceSun-synchronous
Orbit regimeLow Earth orbit
Payload items TES
BIRD
PROBA
Cargo mass1,294 kilograms (2,853 lb)
ProgrammePolar Satellite Launch Vehicle missions
Previous missionPSLV-C2
Next missionPSLV-C4

PSLV-C3 was the third operational launch and overall sixth mission of the PSLV program. This launch was also the forty-sixth launch by Indian Space Research Organisation since its first mission on 1 January 1962. The vehicle carried three satellites which were deployed in the Sun-synchronous Low Earth orbit.[1][2] The vehicle carried Technology Experiment Satellite (Indian experimental Earth observation satellite), BIRD (German Earth observation satellite) and PROBA (experimental satellite from Belgium). This was India's and ISRO's second commercial spaceflight. PSLV-C3 was launched at 10:23 a.m. IST on 22 October 2001 from Satish Dhawan Space Centre (then called "Sriharikota Range").[3][4][5][6][7][8]

Mission highlights

The mission involved placing Technology Experiment Satellite (TES) and Bispectral and Infrared Remote Detection (BIRD) in a 568 km circular orbit. It would then place the PRoject for On Board Autonomy (PROBA) satellite in an 568 km x 638 km elliptical orbit. This demonstrated ISRO capability to launch multiple satellites in multiple orbits. It also earned ISRO $1 million for each satellite.[1][2][9]

Mission parameters

  • Mass:
    • Total liftoff weight: 294,000 kilograms (648,000 lb)
    • Payload weight: 1,294 kilograms (2,853 lb)
  • Overall height: 44.4 metres (145.7 ft)
  • Propellant:
  • Engine:
    • First stage: S139
    • Second stage: Vikas
    • Third stage:
    • Fourth stage: 2 x PS-4
  • Thrust:
    • First stage: 4,430 + 677 x 6 kN
    • Second stage: 724 kN
    • Third stage: 324 kN
    • Fourth stage: 7.4 x 2 kN
  • Altitude: 586.7 kilometres (365 mi)
  • Maximum velocity:7,593 metres per second (24,911 ft/s) (recorded at time of fourth stage ignition)
  • Duration: 1,658 seconds

[1][2][10]

Payload

PSLV-C3 carried and deployed total three satellites. Technology Experiment Satellite (TES) was the main payload and BIRD and PROBA were two auxiliary payloads that were mounted on PSLV-C3. In the flight sequence, TES was injected first, followed by BIRD and then PROBA.[1][2]

CountryNameNosMassTypeObjective
IndiaTES11,108 kgSatelliteExperimental Earth observation satellite
BelgiumBIRD194 kgMicrosatelliteRemote sensing technology demonstration
GermanyPROBA192 kgMicrosatelliteEarth observation technology demonstration

Launch and planned flight profile

PSLV-C3 was launched at 10:23 a.m. IST on 22 October 2001 from Satish Dhawan Space Centre (then called "Sriharikota Launching Range"). The mission was planned with pre-flight prediction of covering overall distance of 586.668 kilometres (365 mi). The total flight time was 1658 seconds as PROBA was to be launched into an elliptical orbit after TES and BIRD were launched into a circular orbit.[9] The orbit raise was done using the yaw RCS thrusters in off-modulated mode.[11]

Following was the planned flight profile.[1][2][3][5][6][7][8]

StageTime
(seconds)
Altitude
(kilometer)
Velocity
(meter/sec)
EventRemarks
First stageT+00.02452First stage ignitionLift-off
T+1.24Ignition of 4 ground-lit strap-on motors
T+25.042.515551Ignition of 2 air-lit strap-on motors
T+68.0423.4721,155Separation of 4 ground-lit strap-on motors
T+90.0440.0611,644Separation of 2 air-lit strap-on motors
T+112.7367.6012,028First stage separation
Second stageT+112.9367.8282,027Second stage ignition
T+156.73115.6042,284Heat shield separation
T+278.81236.2724,099Second stage separation
Third stageT+280.01237.4334,097Third stage ignition
T+498.33455.4876,086Third stage separation
Fourth stageT+520.60460.8186,065Fourth stage ignition
T+914.92571.2477,575Fourth stage thrust cut-off
T+971.92572.080TES separation
T+1,011.92572.709BIRD separation
T+1,091.92574.064PROBA orbit raise start
T+1,552.50585.0187,593PROBA orbit raise stop
T+1,602.50586.6887,592PROBA orbit separationMission over

Fourth Stage Break-up event

The fourth stage of the PSLV had undergone a break-up event on 19 December 2001, likely caused by an explosion.[12] After the explosion of PSLV-C3, ISRO carried out passivation of the upper stages of the PSLV, from the PSLV-C4 mission onwards.[13] As per ISRO, this event generated 386 debris objects, of which 76 were in orbit in 2021,[14][15] falling to 41 by 2025.[16]

See also

References

  1. ^ "PSLV-C3". Indian Space Research Organisation. Archived from the original on 5 March 2016. Retrieved 10 Jul 2016.
  2. ^ "PSLV-C3 brochure". Indian Space Research Organisation. Archived from the original on 20 March 2022. Retrieved 10 Jul 2016.
  3. ^ "PSLV-C3 Successfully Launched : Puts Three Satellites In Orbit". defense-aerospace.com. Retrieved 10 Jul 2016.
  4. ^ "ISRO's timeline. 1960s to today. #46". Indian Space Research Organisation. Archived from the original on 20 November 2016. Retrieved 10 Jul 2016.
  5. ^ "SPACEWARN Activities". NASA. Retrieved 10 Jul 2016.
  6. ^ "Space Launch Report: PSLV". spacelaunchreport.com. Archived from the original on January 4, 2013. Retrieved 10 Jul 2016.
  7. ^ "PSLV-C3 Successfully Launched : Puts 3 Satellites In Orbit". Press Information Bureau. Retrieved 10 Jul 2016.
  8. ^ "PSLV-C3 launches three satellites". The Hindu Business Line. Retrieved 10 Jul 2016.
  9. ^ SUBRAMANIAN, T. S. "An ISRO landmark". Frontline. Retrieved 2022-03-25.
  10. ^ "PSLV details". Indian Space Research Organisation. Archived from the original on 22 December 2016. Retrieved 10 Jul 2016.
  11. ^ "PSLV-C4". www.isro.gov.in. Archived from the original on 2022-05-23. Retrieved 2022-03-26.
  12. ^ Bandyopadhyay, Parthasarathi; Sharma, Radhey; Adimurthy, V. (October 2002). Analysis of the possible cause of break up of PSLV-C3/PS4 stage. 34th COSPAR Scientific Assembly. Houston, Texas: The Second World Space Congress. p. 1374. Bibcode:2002cosp...34E1374B
  13. ^ Kosambe, Santosh (2019). "Overview of the Space Debris Mitigation Activities in ISRO". Journal of Aircraft and Space Technology. 3: 199–200. – via ResearchGate.
  14. ^ Chethan Kumar (Mar 25, 2022). "In 2021, 135 launches put 1.8k objects in space, 102 launches put 522 objects in 2020; Isro flags off debris concern | India News - Times of India". The Times of India. Retrieved 2022-03-26.
  15. ^ "Space Situational Assessment 2021 - ISRO". www.isro.gov.in. Archived from the original on 2022-07-15. Retrieved 2022-03-26.
  16. ^ "Indian Space Situational Assessment Report (ISSAR) for 2024 Released". www.isro.gov.in. Archived 2025-05-29 at the Wayback Machine. Retrieved 2025-05-31.