{{Short description|North-south state highway in Ohio, US}} {{other uses}} {{Use American English|date=April 2025}} {{Use mdy dates|date=February 2022}} {{Infobox road |state=OH |type=SR |route=25 |map={{maplink-road}} |map_custom=yes |length_mi=34.98 |length_ref=<ref name=DESTAPE>{{cite web |author = Division of Planning Office of Technical Services |url = http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Pages/DESTAPE.aspx |title = DESTAPE |publisher = Ohio Department of Transportation |date = June 24, 2015 |access-date = November 10, 2015 |archive-url = https://web.archive.org/web/20151102013001/http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Pages/DESTAPE.aspx |archive-date = November 2, 2015 }} *[http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/DESTAPECnty/DESWOO.pdf Wood County] *[http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/DESTAPECnty/DESLUC.pdf Lucas County] </ref> |formed=1973 |deleted= |direction_a=South |terminus_a={{jct|state=OH|I|75}} near Cygnet |junction={{plainlist| *{{jct|state=OH|US|6}} near Bowling Green *{{jct|state=OH|I|75|I|475|US|23}} in Perrysburg *{{jct|state=OH|US|20}} in Maumee *{{jct|state=OH|US|24}} in Toledo *{{jct|state=OH|I|75}} in Toledo }} |direction_b=North |terminus_b={{jct|state=OH|I|280}} in Toledo |counties=Wood, Lucas |previous_type=US 1961 |previous_route=25 |previous_dab=1923-1927 |next_type=SR |next_route=26 }}

'''State Route 25''' ('''SR&nbsp;25''') is an Ohio state route that runs between Cygnet and Toledo in the US state of Ohio. The highway has a total length of {{convert|34.98|mi|km|2}}. Some of the highway is listed on the National Highway System and various sections are rural four-lane highways and urbanized four-lane divided highways. SR&nbsp;25 passes through farmland, commercial and residential properties.

Between Cygnet and Perrysburg, it is the relic of an old U.S. Route 25 (US&nbsp;25) that passes through Bowling Green as largely a divided surface highway. From Perrysburg it crosses the Fort Meigs Memorial (Maumee–Perrysburg) Bridge running concurrently with US&nbsp;20 and then follows the Anthony Wayne Trail from Maumee into downtown Toledo. The Maumee portion runs concurrently with US&nbsp;24, while US 24 in greater Toledo takes, as far south as Perrysburg, the path of what used to be US&nbsp;25, more distant from the newer Interstate 75 (I-75), having had its route switched with that of old US&nbsp;25. North of this former terminus, SR&nbsp;25 runs through downtown Toledo on Erie Street (northbound) and Michigan Street (southbound) before becoming the Greenbelt Parkway, which is cut off at I-280, terminating the route.

==Route description== [[File:Portage, Ohio viewed from South Dixie Highway-026870.JPG|thumb|290px|Ohio State Route 25 in Portage]]

SR&nbsp;25 heads westerly from its southern terminus at an interchange with I–75 in rural Wood County. The highway heads westward, before turning north at an intersection with Cygnet Road (Township Highway 3). The highway heads northeast passing through farmland as a two-lane highway closely paralleling I–75. The route turns due north and becomes a four-lane divided highway, still closely paralleling I–75, before I–75 heads northeasterly. The road has an intersection with SR&nbsp;281 and then begins to enter residential properties. The highway enters Bowling Green at an interchange with US&nbsp;6 and passes through commercial properties.<ref name="google maps"/><ref name="ODOT 2011"/>

At a traffic signal with Gypsy Lane Road, the highway becomes a four-lane highway with a center left-turn lane until a traffic signal at Napoleon Road when the roadway loses the left turn lane. North of Napoleon Road the highway passes through residential properties, until the road enters downtown Bowling Green as Main Street. The highway passes through the downtown business district of Bowling Green and an intersection with SR&nbsp;64 (Wooster Street). The road leaves downtown Bowling Green and returns to passing through residential properties. At Poe Road, SR&nbsp;25 passes through commercial properties before leaving Bowling Green and becoming Dixie Highway. North of Bowling Green, the route passes through rural farmland as a rural four-lane undivided highway. The highway has a traffic signal at SR&nbsp;582 (Middleton Pike) and becomes a four-lane divided highway heading northeast passing through farmland with some houses.<ref name="google maps">{{google maps |url = https://maps.google.com/maps?saddr=Unknown+road&daddr=41.3530959,-83.6501734+to:41.4665365,-83.649015+to:41.5597628,-83.6522387+to:41.6731913,-83.5174114+to:Greenbelt+Pkwy&hl=en&ll=41.601324,-83.672905&spn=0.151214,0.308647&sll=41.476689,-83.723373&sspn=0.303011,0.617294&geocode=FSJHdQIddZUD-w%3BFYf_dgIdg5kD-ymp-gH72ws8iDFzq6Um5z0VlA%3BFai6eAIdCZ4D-ylF26E99nQ8iDGp6SU1j7GJsQ%3BFdImegIdcpED-ykBAADAFnc8iDEKxNu1ENodjw%3BFefhewIdHaAF-ylVnC2oRIE7iDFfmLCVfES3ow%3BFdPqewIdOasF-w&mra=dpe&mrsp=1&sz=11&via=1,2,3,4&t=h&z=12 |access-date = January 12, 2013 |title = Overview of Ohio State Route 25 }}</ref><ref name="ODOT 2011">{{Ohio road map |year = 2011 |access-date = January 12, 2013 |sections = F2–F4 }}</ref>

SR&nbsp;25 enters Perrysburg passing through commercial properties and has an interchange with Interstate 475 (I–475) and US&nbsp;23. At Findlay Street, the highway curves northeasterly and becomes a four-lane undivided highway (West Boundary Street), passing through commercial and residential properties. The road crosses over a set of railroad tracks, before an intersection with SR&nbsp;65 (West River Road). SR&nbsp;65 heads northwest concurrently with SR&nbsp;25, and the concurrency has an intersection with US&nbsp;20 (West Front Street). At the intersection with US&nbsp;20, SR&nbsp;65 turns east onto US&nbsp;20 and SR&nbsp;25 turns northwest onto US&nbsp;20 (Maumee–Western Reserve Road). The concurrency heads northwestward as a four-lane undivided highway passing through woodland and crossing over the Maumee River. SR&nbsp;25/SR&nbsp;65 enters Maumee as Conant Street and has an intersection with US&nbsp;24 (Anthony Wayne Trail). At this intersection, SR&nbsp;25 turns northeasterly, concurrent with US&nbsp;24.<ref name="google maps"/><ref name="ODOT 2011"/>

US&nbsp;24/SR&nbsp;25 heads northeasterly as a four-lane divided highway passing through mostly residential properties. The highway has a bridge over the Ohio Turnpike. On that bridge is an intersection with Detroit Avenue. US&nbsp;24 leaves SR&nbsp;25 and heads north-northeast on Detroit. North of the turnpike, the highway enters Toledo and passes through woodland, with some houses and Toledo Country Club, before returning to residential properties. At Harvard Boulevard and Woodsdale Avenue, the route passes through the Toledo Zoo and under a set of railroad tracks. Northeast of the tracks, the road enters a wooded area with some commercial properties. SR&nbsp;25 has an incomplete interchange with Collingwood Boulevard—the interchange is a northbound exit and southbound entrance on SR&nbsp;25. This interchange allows northbound SR&nbsp;25 to have access to southbound I–75 and northbound I–75 access to southbound SR&nbsp;25. The highway has an interchange with I–75—this interchange is also incomplete allowing only southbound to southbound or northbound to northbound movements.<ref name="google maps"/><ref name="ODOT 2011"/>

SR&nbsp;25 enters downtown Toledo and the highway follows one-way streets: northbound on Erie Street and southbound on Michigan Street. The two streets are two blocks apart and the Lucas County Court House is between them. At the northeastern corner of the Court House, northbound SR&nbsp;25 turns northwest on Cherry Street and joins SR&nbsp;120. After a couple blocks, Cherry Street meets southbound SR&nbsp;25 at Spielbusch Avenue. After a turn to the northeast, the route becomes a four-lane divided highway known as Greenbelt Parkway. Northeast of SR&nbsp;120 the highway passes through woodland and industrial properties. The northern terminus of SR&nbsp;25 is at an interchange with I–280, as the roadway continues northeast. The parkway ends northeast of the interchange at Galena Street in a wooded area near the Toledo Correctional Institute.<ref name="google maps"/><ref name="ODOT 2011"/>

The portion of SR&nbsp;25 running from the I-475/US&nbsp;23 diamond interchange in Perrysburg to the I-75 interchange near downtown Toledo is included within the National Highway System.<ref name="NHS map of Ohio">{{cite map |author = Federal Highway Administration |title = National Highway System: Ohio |date = December 2003 |scale = Scale not given |location = Washington, DC |publisher = Federal Highway Administration |url = https://www.fhwa.dot.gov/planning/national_highway_system/nhs_maps/ohio/oh_ohio.pdf |format = PDF |access-date = October 11, 2010 }}</ref><ref name="NHS-Toledo">{{cite map |author = Federal Highway Administration |title = National Highway System: Toledo, Ohio |date = December 2003 |scale = Scale not given |location = Washington, DC |publisher = Federal Highway Administration |url = https://www.fhwa.dot.gov/planning/national_highway_system/nhs_maps/ohio/toledo_oh.pdf |format = PDF |access-date = October 11, 2010 }}</ref> A 2009 traffic report from the Ohio Department of Transportation (ODOT) showed that the lowest traffic levels were the 5,287&nbsp;vehicles used the highway daily on the section near its southern terminus, between I–75 and SR&nbsp;281 in Wood County, while peak traffic volumes were 61,648&nbsp;vehicles along a section of SR&nbsp;25 between SR&nbsp;120 and I–280.<ref name="ODOT_AADT wood">{{cite map |author = Ohio Department of Transportation |url = http://www.dot.state.oh.us/Divisions/Planning/TechServ/prod_services/documents/countlocmaps/LocMapWoo.pdf |title = Traffic Survey Report: Wood County |year = 2009 |location = Columbus |publisher = Ohio Department of Transportation |access-date = January 19, 2012 }}{{dead link |date=February 2022}}</ref><ref name="ODOT_AADT lucas">{{cite map |author = Ohio Department of Transportation |url = http://www.dot.state.oh.us/Divisions/Planning/TechServ/prod_services/documents/countlocmaps/LocMapLUC.pdf |title = Traffic Survey Report: Lucas County |year = 2009 |publisher = Ohio Department of Transportation |access-date = January 19, 2012 }}{{dead link|date=February 2022}}</ref>

==History== {{see also|U.S. Route 25 in Ohio}} Most of the route was at one time the Dixie Highway.

In 1923, the route that later became SR&nbsp;25 was signed as SR&nbsp;6.<ref name="ODOT1922_map">{{Ohio road map |year= 1922 |access-date = January 18, 2013 }}</ref><ref name="ODOT1923_map">{{Ohio road map |year = 1923 |access-date = January 18, 2013 }}</ref> The SR&nbsp;6 designation was changed to US&nbsp;25 on November 11, 1926.<ref name=USH>{{cite map |author1 = Bureau of Public Roads |author2 = American Association of State Highway Officials |date = November 11, 1926 |title = United States System of Highways Adopted for Uniform Marking by the American Association of State Highway Officials |url = https://commons.wikimedia.org/wiki/File:United_States_System_of_Highways_Adopted_for_Uniform_Marking_by_the_American_Association_of_State_Highway_Officials.jpg |scale = 1:7,000,000 |location = Washington, DC |publisher = United States Geological Survey |oclc = 32889555 |access-date = November 7, 2013 |via = Wikimedia Commons |name-list-style = amp }}</ref> Between 1946 and 1948, the roadway was widened to a four-lane divided highway, between Bowling Green and Maumee;<ref name="ODOT1945_map">{{Ohio road map |year = 1945 |access-date = January 18, 2013 }}</ref><ref name="ODOT1948_map">{{Ohio road map |year = 1948 |access-date = January 18, 2013 }}</ref> the section south of Bowling Green was widened to a four-lane divided highway between 1951 and 1953.<ref name="ODOT1951_map">{{Ohio road map |year = 1951 |access-date = January 18, 2013 }}</ref><ref name="ODOT1953_map">{{Ohio road map |year = 1953 |access-date = January 18, 2013 }}</ref> US&nbsp;25 was decommissioned in 1973, and SR&nbsp;25 was signed along its northern section.<ref name="ODOT1973_map">{{Ohio road map |year = 1973 |access-date = January 18, 2013 }}</ref><ref name="ODOT1974_map">{{Ohio road map |year = 1974 |access-date = January 18, 2013 }}</ref> In 1986, SR&nbsp;25 and US&nbsp;24 switched routes north of the intersection at Detroit Avenue.<ref>{{AASHTO minutes |year = 1986A |page = 2 |access-date = March 1, 2020 |link = y }}</ref> Between 1997 and 1999, the road from the second interchange with I–75 and I–280 was widened into a four-lane divided highway.<ref name="ODOT1997_map">{{Ohio road map |year = 1997 |access-date=January 18, 2013}}</ref><ref name="ODOT1999_map">{{Ohio road map |year = 1999 |access-date = January 18, 2013 }}</ref>

In 2004, a {{convert|5|mi|km|adj=on}} stretch of SR&nbsp;25 in Wood County won a Perpetual Pavement Award from the Asphalt Pavement Association. The section was originally constructed in between 1937 and 1940 as one of the first "deep-strength" asphalt pavements built in Ohio.<ref>{{cite web |url = http://asphaltroads.org/images/PP_Folder_Insert_2004_OH.pdf |title = 2004 Perpetual Pavement Award Winner - Ohio |access-date = September 10, 2013 |author = Asphalt Pavement Association |date = March 25, 2005 |format = PDF }}{{Dead link|date=March 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>

==Major intersections== {{OHinttop|length_ref=<ref name=DESTAPE/>}} {{OHint |county=Wood |cspan=8 |ctdab=Wood |township=Henry |mile=0.00 |mile2=0.70 |road={{jct|state=OH|I|75|road|Cygnet Road|city1=Toledo|city2=Dayton|city3=Cygnet}} |notes=Southern terminus at exit 171 on I-75 }} {{OHint |township1=Liberty |township2=Portage |ctdab=Wood |mile=3.77 |road={{jct|state=OH|OH|281|city1=Defiance|city2=Wayne}} }} {{OHint |location=Bowling Green |lspan=2 |mile=8.27 |mile2=8.38 |road={{jct|state=OH|US|6|city1=Fremont|city2=Napoleon}} |notes=Exit 65 on US&nbsp;6 }} {{OHint |mile=10.12 |road={{jct|state=OH|OH|64|name1=Wooster Street}} }} {{OHint |ctdab=Wood |township=Middleton |mile=15.89 |road={{jct|state=OH|OH|582|name1=Middleton Pike|city1=Haskins|city2=Luckey}} }} {{OHint |location=Perrysburg |lspan=3 |mile=20.97 |mile2=21.15 |road={{jct|state=OH|I|475|US|23|to3=yes|I|75|city1=Toledo|city2=Dayton|location3=Ann Arbor}} |notes=Exit 1C on I-475/US&nbsp;23; diverging diamond interchange }} {{OHint |mile=22.52 |type=concur |road={{jct|state=OH|OH|65|dir1=South|name1=Indiana Avenue}} |notes=Southern end of SR&nbsp;65 concurrency }} {{OHint |mile=22.78 |type=concur |road={{jct|state=OH|US|20|dir1=East|OH|65|dir2=North|name1=Front Street}} |notes=Northern end of SR&nbsp;65 concurrency; southern end of US&nbsp;20 concurrency}} {{OHint |county=Lucas |cspan=9 |location=Maumee |lspan=2 |mile=23.84 |type=concur |road={{jct|state=OH|US|20|dir1=West|US|24|dir2=West|name2=Anthony Wayne Trail / Conant Street}} |notes=Northern end of US&nbsp;20 concurrency; southwestern end of US&nbsp;24 concurrency }} {{OHint |mile=26.21 |type=concur |road={{jct|state=OH|US|24|dir1=East|name1=Detroit Avenue}} |notes=Northeastern end of US&nbsp;24 concurrency }} {{OHint |location=Toledo |lspan=7 |mile=30.80 |road={{jct|state=OH|OH|2|name1=Western Avenue}} }} {{OHint |type=incomplete |mile=31.43 |road=link=|alt=|20px Collingwood Avenue to I-75 south |notes=Interchange; northbound exit and southbound entrance only }} {{OHint |type=incomplete |mile=31.67 |mile2=31.94 |road={{jct|state=OH|I|75|location1=Detroit|city2=Dayton}} |notes=Exit 201 on I-75; northbound-to-northbound and southbound-to-southbound movements from both routes only }} {{OHint |mile=32.28 |road=Washington Street |notes=Unsigned SR&nbsp;51D }} {{OHint |mile=32.39 |road={{jct|state=OH|OH|51|name1=Monroe Street}} }} {{OHint |type=concur |mile=33.04 |mile2=33.25 |road={{jct|state=OH|OH|120|name1=Cherry Street}} |notes=Northbound SR&nbsp;25 follows SR&nbsp;120 for {{convert|0.21|mi|km}} }} {{OHint |mile=34.54 |mile2=34.98 |road={{jct|state=OH|I|280|Tour|LECT|location1=Cleveland|location2=Detroit|road|Greenbelt Parkway}} |notes=Northern terminus at exit 11 on I-280 }} {{Jctbtm|keys=concur}}

==See also== *{{Portal-inline|U.S. Roads}}

==References== {{Reflist|30em}}

==External links== {{Attached KML|display=title,inline}}

025 Ohio State Route 025 Category:U.S. Route 25 Category:Transportation in Wood County, Ohio Category:Transportation in Lucas County, Ohio