{{Use dmy dates|date=April 2022}} {{short description|German U-Bahn train type operated in Munich}} {{update|date=February 2022}} {{Expand German|date=December 2022|topic=transp}}{{Infobox train | name = MVG Class C | image = File:C2 611 Neuperlach Süd U5.jpg | imagealt = | caption = MVG Class C train at Neuperlach Süd station in April 2009 | service = 2002–present | manufacturer = Adtranz/Bombardier (C1 only), Siemens | designer = Alexander Neumeister | factory = | family = C2: Inspiro<ref name="inspiro" /> | replaced = MVG Class A (A2.1 & A2.2) | yearconstruction = 2000– | refurbishment = | yearscrapped = | numberbuilt = C1: 108 vehicles (18 sets)<br />C2: 276 vehicles (46 sets<ref name="C2aufU1"/>) | numberservice = C1: 102 vehicles (17 sets)<br />C2: 276 vehicles (46 sets<ref name="C2aufU1"/>) | numberconstruction = C2: 234 vehicles (39 sets) | numberpreserved = | numberscrapped = C1: 6 vehicles (1 set) | formation = 6 cars per trainset | fleetnumbers = 601–618, 701– | capacity = C1: 912 (252 seated)<br />C2: 940 (220 seated) | operator = MVG | depots = | carbody = Welded aluminium | trainlength = {{Convert|115|m|ftin|abbr=on}} | carlength = {{Convert|19.78|m|ftin|abbr=on}} (end cars)<br />{{Convert|18.82|m|ftin|abbr=on}} (intermediate cars) | width = {{Convert|2.9|m|ftin|abbr=on}} | height = {{Convert|3.55|m|ftin|abbr=on}} | floorheight = | entrylevelorstep = | doors = 3 pairs per side | maxspeed = {{Convert|80|km/h|mph|abbr=on}} | weight = 164 t (C1), 180 t (C2) | acceleration = | deceleration = | traction = Siemens IGBTVVVF<ref name="inspiro">{{cite web|url=https://assets.new.siemens.com/siemens/assets/api/uuid:600d2131-91e7-4826-acf9-8d437a5b53c9/325-200562-db-ubahn-muenchen-en-200630-online.pdf|format=PDF|title=Metro Munich - 85 six-car metro trains|publisher=Siemens Mobility GmbH |date=2020|archive-url=https://web.archive.org/web/20211124134808/https://assets.new.siemens.com/siemens/assets/api/uuid:600d2131-91e7-4826-acf9-8d437a5b53c9/325-200562-db-ubahn-muenchen-en-200630-online.pdf |archive-date=24 November 2021 |url-status=live}}</ref> (C2: SIBAC G750 D570/600 M5-1) | traction motors = C1: 24 × {{convert|100|kW|abbr=on|0}}<br />C2: 24 × {{convert|140|kW|abbr=on|0}} | poweroutput = C1: {{convert|2.4|MW|abbr=on|0}}<br />C2: {{convert|3.36|MW|abbr=on|0}} | transmission = | aux = | powersupply = | hvac = | electricsystem = {{750 V DC|conductor=y}} | collectionmethod = Contact shoe | uicclass = Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′<ref name="inspiro" /> | bogies = | brakes = Electric brake, pneumatic brake, spring accumulator brake | safety = LZB | coupling = Scharfenberg (non-electrical) | multipleworking = | gauge = {{track gauge|sg|allk=on}} }}

The '''MVG Class C''' is an electric multiple unit (EMU) train type operated by the Münchner Verkehrsgesellschaft on the Munich U-Bahn system since 2002.<ref name="Pabst2006">{{cite book |last=Pabst |first=Martin |title=S-Bahn- und U-Bahn-Fahrzeuge in Deutschland |trans-title=S-Bahn and U-Bahn vehicles in Germany |edition=2nd |pages=19, 72-73 |language=de |date=2006 |publisher=GeraMond |isbn=3-7654-7366-9}}</ref> It is the first type of rolling stock on the Munich U-Bahn that consists of more than two cars and features gangways between the individual cars.<ref name="Pabst2006"/>

==Design== The first concept intended a three car train.<ref name="Pabst2006"/> Those plans were later revised to a six car formation, with the exterior and interior designed by Alexander Neumeister.<ref name="PischekJunghardt2012">{{cite book |last1=Pischek |first1=Wolfgang |last2=Junghardt |first2=Holger |title=Die Münchner U-Bahn - Geschichte · Streckennetz · Fahrzeuge |trans-title=The Munich U-Bahn - History · Network · Rolling stock |edition=3rd |pages=60-63, 124 |language=de |date=2012 |publisher=GeraMond |isbn=978-3-86245-148-7}}</ref> The newer C2 trains are based on the C1, and are also designed by Neumeister. For its design, the C2 trains were awarded a German Design Award,<ref name="merkur201402">{{cite web |url=https://www.merkur.de/lokales/muenchen/stadt-muenchen/neue-muenchner-super-u-bahn-3378305.html |title=Das ist Münchens neue Super-U-Bahn |trans-title=This is Munich's new super subway |language=de |author=<!--Not stated--> |date=21 February 2014 |website=merkur.de |publisher=Münchner Merkur |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180420140906/https://www.merkur.de/lokales/muenchen/stadt-muenchen/neue-muenchner-super-u-bahn-3378305.html |archive-date=20 April 2018 |url-status=live}}</ref> Red Dot Design Award for product design 2013, and Universal Design Consumer Favorite award 2013.<ref name="ep201307">{{cite web |url=https://www.eurailpress.de/news/wirtschaft-unternehmen/single-view/news/auszeichnung-c2-zug-erhaelt-red-dot-award.html |title=Auszeichnung: C2-Zug erhält Red-Dot-Award |trans-title=Award: C2 train receives Red-Dot-Award |language=de |author=<!--Not stated--> |date=3 July 2013 |website=eurailpress.de |publisher=DVV Media Group GmbH / Eurailpress |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20190910123638/https://www.eurailpress.de/nachrichten/unternehmen-maerkte/detail/news/auszeichnung-c2-zug-erhaelt-red-dot-award.html |archive-date=10 September 2019 |url-status=live}}</ref>

==Formation== Every Class C train consists of six cars, which are connected by gangways allowing passengers to walk through the whole train. While the shortest technically possible formation consists of two end cars and one intermediate car, every train in service has been running in a six car formation.<ref name="PischekJunghardt2012"/> Their length of {{Convert|114|m|ftin|abbr=on}}{{refn|According to Pischek & Junghardt, the trains have a length of {{Convert|115,000|mm|ftin|abbr=on}}.<ref name="PischekJunghardt2012"/>|group=N}} makes them the longest metro subway trains in Germany.<ref name="Pabst2006"/>

The Class C was delivered in four batches: *C1.9: fleet numbers 601–610, delivered from 2001<ref name="PischekJunghardt2012"/> *C1.10: fleet numbers 611–618, delivered from 2005<ref name="PischekJunghardt2012"/> *C2.11: fleet numbers 701–721, delivered from 2013 *C2.12: fleet numbers 722–745, delivered from 2019<ref name="tramreport06052020">{{cite web |last=Buchleitner |first=Frederik |url=https://www.tramreport.de/2020/05/06/u-bahn-zweite-c2-serie-darf-in-den-fahrgastbetrieb/ |title=U-Bahn: Zweite C2-Serie darf in den Fahrgastbetrieb |trans-title=U-Bahn: Second C2 series allowed to enter passenger service |language=de |date=6 May 2020 |work=Tramreport |access-date=6 May 2020 |archive-url=https://archive.today/20200506165252/https://www.tramreport.de/2020/05/06/u-bahn-zweite-c2-serie-darf-in-den-fahrgastbetrieb/ |archive-date=6 May 2020 |url-status=live}}{{Self-published source|date=May 2020|expert=y}}</ref> *C2.13: 22 further trains (third delivery series), with the first delivered on 27 April 2022<ref name=":0">{{Cite web |title=New metros for Munich: SWM and MVG to get additional latest-gene ... |url=https://press.siemens.com/global/en/pressrelease/new-metros-munich-swm-and-mvg-get-additional-latest-generation-trains |access-date=2026-04-27 |website=press.siemens.com |language=en}}</ref> *C2.14: 18 further trains ordered on 27 April 2022 following a Europe-wide tender, to be manufactured at the Siemens Mobility plant in Vienna and delivered in 2024–2025, bringing the planned total C2 fleet to 85 six-car trainsets<ref name=":0" />

===C1 series===

{| class="wikitable" |- ! Car ! Mc1 !! M1 !! M2 !! M3 !! M4 !! Mc2 |- ! Numbering (sets 601–609) | rowspan="2" | 66xx || rowspan="2" | 86xx || 865x || 875x || rowspan="2" | 87xx || rowspan="2" | 76xx |- ! Numbering (sets 610–618) | 866x || 876x |- ! Capacity (seated) | 38 || 44 || 44 || 44 || 44 || 38 |} * Car Mc1 is at the northern end, while car Mc2 is at the southern end.

<!--formation table for C2 series will be added when sources are available, as of May 2020 still haven't found any.-->

==Interior== Seating accommodation consists of longitudinal seating in the end cars and transverse seating bays in the intermediate cars with longitudinal seats near the gangways to the adjacent cars.<ref name="PischekJunghardt2012"/> Only the transverse seats are upholstered; the longitudinal seats are made out of wood. LED panels display the station names, accompanied by automated announcements. The C1 trains have a total capacity of 912 passengers, with 252 seated and 660 standing.<ref name="PischekJunghardt2012"/> The C2.11 trains feature LED interior lighting, LCD passenger information screens, CCTV security cameras and upholstery on all seats.<ref name="merkur201606">{{cite web |url=https://www.merkur.de/lokales/muenchen/stadt-muenchen/neue-c2-u-bahnen-muenchen-ersten-einsatz-6497124.html |title=Münchens neue Super-U-Bahn rollt jetzt auf einer Linie |trans-title=Munich's new super subway now runs on one line |language=de |author=<!--Not stated--> |date=17 June 2016 |website=merkur.de |publisher=Münchner Merkur |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180420140312/https://www.merkur.de/lokales/muenchen/stadt-muenchen/neue-c2-u-bahnen-muenchen-ersten-einsatz-6497124.html |archive-date=20 April 2018 |url-status=live}}</ref> LED stripes on the door edges of the C2 trains show passengers when the doors can be opened and when they are closing. The C2 trains have a total capacity of 940 passengers, with 220 seated and 720 standing.<ref name="merkur201402"/> The ceiling-mounted handrails were criticized as being too high, thus only being accessible by tall passengers.<ref name="münchentv201608">{{cite web |url=https://www.muenchen.tv/muenchen-neue-u-bahn-zuege-mit-leuchtenden-led-184429/ |title=München: Neue U-Bahn-Züge mit leuchtenden LED |trans-title=Munich: New subway trains with LED lights |language=de |author=<!--Not stated--> |date=26 August 2016 |website=muenchen.tv |publisher=München Live TV Fernsehen GmbH & Co.KG |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20181019205352/https://www.muenchen.tv/muenchen-neue-u-bahn-zuege-mit-leuchtenden-led-184429/ |archive-date=19 October 2018 |url-status=live}}</ref>

<gallery> File:MVG-Baureihe C Fahrgastraum 3 2014-03-02.jpg|Transverse seating bays in the intermediate cars File:MVG-Baureihe C Fahrgastraum 2 2014-03-02.jpg|Longitudinal seating at the gangways </gallery>

==Technical specifications== The C1 trains were manufactured jointly by Siemens and Adtranz (later Bombardier Transportation), with Siemens building the electrical parts and Adtranz/Bombardier being responsible for the car bodies, bogies, brakes and lighting equipment.<ref name="Pabst2006"/> The car bodies are made out of aluminium, and the trains are powered by IGBT-controlled<ref name="Pabst2006"/> three-phase motors. Every axle is powered by one {{Convert|100|kW|hp|0|abbr=on}} motor, bringing the total power output of one C1 train to {{Convert|2400|kW|hp|0|abbr=on}}.<ref name="PischekJunghardt2012"/> The C2 trains were manufactured completely by Siemens,<ref name="merkur201606"/> and have a power output of {{Convert|3360|kW|hp|0|abbr=on}}<ref>{{Cite web|last=mvg.de|first=Redaktion|title=U-Bahn, Bus und Tram - Die Mobilitätsmacher.|url=https://www.mvg.de/ueber/das-unternehmen/fahrzeuge.html|access-date=13 December 2020|website=www.mvg.de|language=de}}</ref> with a maximum speed of {{Convert|80|km/h|mph|abbr=on}} in passenger service, although their maximum design speed is {{Convert|90|km/h|mph|abbr=on}}.<ref name="münchentv201608"/>

==History== The first trains, classified as C1.9, were ordered in 1997, with deliveries beginning in 2001.<ref name="Pabst2006"/> Weak spots on the couplers were discovered during test runs, leading to the trains not being approved by the authorities. The already delivered sets were moved back to Adtranz/Bombardier's Berlin plant for modifications.<ref name="PischekJunghardt2012"/> The first trains entered service in 2002.<ref name="Pabst2006"/> Eight additional sets, classified as C1.10, were delivered in 2005. Another 21 sets, classified as C2.11, were ordered in 2010<ref name="rg201606">{{cite web |url=http://www.railwaygazette.com/news/single-view/view/first-c2-metro-train-enters-service-in-muenchen.html|title=First C2 metro train enters service in München |author=<!--Not stated--> |date=17 June 2016|website= railwaygazette.com|publisher=Railway Gazette |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180620184522/https://www.railwaygazette.com/news/single-view/view/first-c2-metro-train-enters-service-in-muenchen.html |archive-date=20 June 2018 |url-status=dead}}</ref> with an option of 46 more.<ref name="SZ201710"/> The first of the 22 trains from the second option (C2.13 series) was delivered on 27 April 2022, the same day on which SWM commissioned an additional 18 C2 trains from Siemens Mobility following a Europe-wide tender, bringing the total planned C2 fleet to 85 trainsets.<ref name=":1" /> These additional trains are to be manufactured at the Siemens Mobility plant in Vienna and delivered in 2024–2025.<ref name=":1">{{Cite web |title=New metros for Munich: SWM and MVG to get additional latest-gene ... |url=https://press.siemens.com/global/en/pressrelease/new-metros-munich-swm-and-mvg-get-additional-latest-generation-trains |access-date=2026-04-27 |website=press.siemens.com |language=en}}</ref> Worth 185 million Euro, it is the biggest rolling stock order in the history of the Munich U-Bahn.<ref name="merkur201606"/> The first painted bodyshell was unveiled at the Siemens plant in Vienna on 5 October 2012.<ref>{{cite web |url=http://www.railwaygazette.com/news/single-view/view/muenchens-new-metro-car-unveiled.html |title=München’s new metro car unveiled |author=<!--Not stated--> |date=8 October 2012|website= railwaygazette.com|publisher=Railway Gazette |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180420135534/https://www.railwaygazette.com/news/single-view/view/muenchens-new-metro-car-unveiled.html |archive-date=20 April 2018 |url-status=live}}</ref> Originally intended to enter passenger service in 2013, the Technical Authority of Oberbayern didn't gave their permission due to faulty doors and problems regarding the loading gauge.<ref name="SZ201710">{{cite news| last=Schubert| first=Andreas| date=27 October 2017| title=Die MVG braucht dringend U-Bahnen - doch die stehen im Depot| trans-title=The MVG desperately needs subway trains - but they are at the depot| url=http://www.sueddeutsche.de/muenchen/probleme-bei-der-u-bahn-dringend-gebrauchte-u-bahnen-stehen-im-depot-1.3726256| language=de| work=Süddeutsche Zeitung| access-date=19 April 2018| archive-url=https://archive.today/20190910124434/https://www.sueddeutsche.de/muenchen/probleme-bei-der-u-bahn-dringend-gebrauchte-u-bahnen-stehen-im-depot-1.3726256| archive-date=10 September 2019| url-status=live}}</ref> The first C2 trains entered passenger service on 17 June 2016, between Kieferngarten and Garching-Forschungszentrum stations on line U6.<ref name="rg201606"/> The C2 trains then operated on the whole line U6 with a temporary permission, which was due to expire on 30 April 2018.<ref name="AZ201802">{{cite web |url=https://www.abendzeitung-muenchen.de/inhalt.aerger-im-untergrund-mvg-ist-weiter-unzufrieden-mit-den-neuen-u-bahnen.cf27d4be-b52c-4b00-91fc-65b717377472.html |title=MVG ist weiter unzufrieden mit den neuen U-Bahnen |trans-title=MVG is still not satisfied with new subway trains |language=de |author=<!--Not stated--> |date=7 February 2018 |website=abendzeitung-muenchen.de |publisher=Abendzeitung München |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180420135741/https://www.abendzeitung-muenchen.de/inhalt.aerger-im-untergrund-mvg-ist-weiter-unzufrieden-mit-den-neuen-u-bahnen.cf27d4be-b52c-4b00-91fc-65b717377472.html |archive-date=20 April 2018 |url-status=live}}</ref> On 14 June 2018, the permission was expanded to line U3, with set 716 being the first C2 train entering passenger service on line U3 on the same day.<ref name="BPS42018">{{cite magazine|author=<!--Staff writer(s); no by-line.-->|title=München |trans-title=Munich |magazine=Blickpunkt Straßenbahn |volume=4/2018 |issue=238 |pages=105-106 |issn=0173-0290 |publisher=Arbeitsgemeinschaft Blickpunkt Straßenbahn e.V. |language=de |date=2018}}</ref> The last of the 21 C2.11 sets was delivered on 9 November 2018.<ref name="SZ12112018">{{cite news |author=<!--Staff writer(s); no by-line.--> |date=12 November 2018|title=Alle neuen U-Bahnen sind bald einsatzbereit |trans-title=All new U-Bahn trains will soon be ready to enter service |url=https://www.sueddeutsche.de/muenchen/nahverkehr-alle-neuen-u-bahnen-sind-bald-einsatzbereit-1.4207745 |language=de |work=Süddeutsche Zeitung |access-date=12 January 2019 |archive-url=https://web.archive.org/web/20190415063820/https://www.sueddeutsche.de/muenchen/nahverkehr-alle-neuen-u-bahnen-sind-bald-einsatzbereit-1.4207745 |archive-date=15 April 2019 |url-status=live}}</ref> The first of a further batch of 24 C2 sets arrived in Munich in June 2019.<ref name="swm17062019">{{cite web |url=https://www.swm.de/dam/swm/pressemitteilungen/2019/06/mvg20190617-c2-ubahnzuege-erster-zug.pdf |title=U-Bahn: 24 neue Züge für München rollen an |trans-title=U-Bahn: 24 new trains for Munich |date=17 June 2019 |website=swm.de |publisher=Stadtwerke München GmbH |language=de |access-date=21 July 2019 |archive-url=https://web.archive.org/web/20190721084003/https://www.swm.de/dam/swm/pressemitteilungen/2019/06/mvg20190617-c2-ubahnzuege-erster-zug.pdf |archive-date=21 July 2019 |url-status=dead}}</ref> Entry into service is planned for 2020, and deliveries of these sets are scheduled to be finished in 2022.<ref name="swm17062019"/> The first C2.12 series trains received their running permission from the Technical Authority of Oberbayern on 5 May 2020.<ref name="tramreport06052020"/> C2 trains entered service on line U1 on 18 August 2021,<ref name="C2aufU1">{{cite web |url=https://www.mvg.de/ueber/presse-print/pressemeldungen/2021/august/2021-08-18-Streckenfreigabe-C2-U1.html |title=U-Bahnlinie U1: Neue C2-Züge erstmals im Einsatz |trans-title=U-Bahn line U1: New C2 trains enter service |language=German |date=18 August 2021 |website=mvg.de |publisher=Stadtwerke München GmbH, Pressestelle |access-date=4 September 2021 |archive-url=https://web.archive.org/web/20210819115045/https://www.mvg.de/ueber/presse-print/pressemeldungen/2021/august/2021-08-18-Streckenfreigabe-C2-U1.html |archive-date=19 August 2021 |url-status=live}}</ref> and on the U4/U5 on 16 September 2022.<ref name="C2aufU4undU5">{{cite web |url=https://www.u-bahn-muenchen.de/blog/2022/09/c2-zuege-jetzt-auch-auf-den-linien-u4-und-u5-freigegeben/ |title= C2-Züge jetzt auch auf den Linien U4 und U5 freigegeben |trans-title=C2 trains now also approved for use on lines U4 and U5 |language=German |date=15 September 2022 |website=u-bahn-muenchen.de}}</ref> C2 trains entered service on line U2 on 7 October 2020, between Feldmoching and Messestadt Ost.<ref>{{Cite web |date=2020-10-06 |title=U-Bahnlinie U2: Neue U-Bahn erstmals im Einsatz |url=https://www.nachrichten-muenchen.com/u-bahnlinie-u2-neue-u-bahn-erstmals-im-einsatz/136610/https://www.nachrichten-muenchen.com/u-bahnlinie-u2-neue-u-bahn-erstmals-im-einsatz/136610/}}</ref>

<gallery> File:München, U-Bahn, C2-Zug an der Studentenstadt, 2.jpeg|A C2.11 train at Studentenstadt station in September 2016 File:MVG C2.12 728 Münchner Freiheit 20211129.jpg|C2.12 set 728 at Münchner Freiheit station in November 2021 </gallery>

==Incidents and accidents== *On 7 May 2015, C1 set 618 ran into a buffer stop on a siding track at Feldmoching station, due to human error.<ref name="sz201606">{{cite news| last=Völklein| first=Marco| date=6 July 2016| title=Münchner U-Bahn rauscht auf Prellbock - und niemand soll was mitbekommen| trans-title=Munich subway train runs into buffer stop - and nobody should notice| url=http://www.sueddeutsche.de/muenchen/mvg-u-bahn-rauscht-auf-prellbock-und-niemand-soll-was-mitbekommen-1.3066361| language=de| work=Süddeutsche Zeitung| access-date=19 April 2018| archive-url=https://archive.today/20190910125500/https://www.sueddeutsche.de/muenchen/mvg-u-bahn-rauscht-auf-prellbock-und-niemand-soll-was-mitbekommen-1.3066361| archive-date=10 September 2019| url-status=live}}</ref> The train was not in revenue service and carried no passengers, only the driver was on board, who suffered a shock. Structural damages on the car frames of the end car and the adjacent intermediate car resulted in set 618 being permanently removed from regular service to undergo repairs,<ref name="sz201606"/> but then it was scrapped.<ref name="SchwandlWellige2021">{{cite book |last1=Schwandl |first1=Robert |last2=Wellige |first2=Wolfgang |title=U-Bahn, S-Bahn & Tram in München - Städtischer Schienennahverkehr in der bayerischen Landeshauptstadt |trans-title=U-Bahn, S-Bahn & Tram in München - Urban Rail in Bavaria's Capital City Munich <!-- official translation on the book's cover -->|pages=17, 20, 21 |language=German, English |date=2021 |publisher=Robert Schwandl Verlag |isbn=978-3-936573-65-7}}</ref> *On 28 September 2015, one C1 train broke down south of Holzapfelkreuth station. Another train was used to push the defective C1 train to a siding track at Klinikum Großhadern station. While passing through Großhadern station, the coupling between two cars broke, resulting in the gangway being ripped apart.<ref name="SZ201509">{{cite news| last=Völklein| first=Marco| date=29 September 2015| title=Sechs U-Bahnzüge fallen aus| trans-title=Six subway trains are cancelled| url=http://www.sueddeutsche.de/muenchen/panne-beim-mvv-sechs-u-bahnzuege-fallen-aus-1.2670489| language=de| work=Süddeutsche Zeitung| access-date=19 April 2018| archive-url=https://archive.today/20190910125631/https://www.sueddeutsche.de/muenchen/panne-beim-mvv-sechs-u-bahnzuege-fallen-aus-1.2670489| archive-date=10 September 2019| url-status=live}}</ref> The cause was found to be insufficient assembly of screws during maintenance by an external company. Six trains had to be temporarily withdrawn and inspected following this incident.<ref name="merkur201509">{{cite web |url=https://www.merkur.de/lokales/muenchen/zentrum/kupplung-u-bahn-gebrochen-rueckruf-zuegen-merkur-5577521.html |title=MVG: Kupplung bei U-Bahn gebrochen |trans-title=MVG: subway train coupling broke |language=de |author=<!--Not stated--> |date=15 September 2015 |website=merkur.de |publisher=Münchner Merkur |access-date=19 April 2018 |archive-url=https://web.archive.org/web/20180420141431/https://www.merkur.de/lokales/muenchen/zentrum/kupplung-u-bahn-gebrochen-rueckruf-zuegen-merkur-5577521.html |archive-date=20 April 2018 |url-status=live}}</ref> *In September 2017, all C2 trains in service were temporarily withdrawn after electric flash-overs happened at the contact shoes.<ref name="SZ201710"/>

==Notes== {{Reflist|group="N"}}

==References== {{reflist|30em}}

==External links== {{commons category|MVG C (U-Bahn München)|MVG Class C}} *[https://www.mvg.de/ueber/das-unternehmen/fahrzeuge.html MVG fleet information] (in German)

Category:Munich U-Bahn Category:Electric multiple units of Germany Category:750 V DC multiple units Category:Adtranz multiple units Category:Bombardier Transportation multiple units Category:Siemens multiple units Category:Train-related introductions in 2002