| System | Changsha Metro |
|---|---|
| Status | Operational |
| Locale | Changsha, Hunan, China |
| Stations | 23 |
| Routes | 1 |
| Open | 29 April 2014 (age 12) |
| Owner | Changsha Government |
| Operator | Changsha Metro Corporation |
| Character | Underground |
| Linelength | 26.57 km (16.51 mi) |
| Tracks | 2 |
Line 2 of the Changsha Metro () is a rapid transit line running from west to east Changsha crossing the Xiang River. The Phase 1 of the line was opened on 29 April 2014 with 19 stations, and the western extension opened on 28 December 2015 with 4 stations.[1] This line is 26.57 km long with 23 stations.[2]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Wangchengpo — Guangda | 29 April 2014 | 22.3 km (13.86 mi) | 19 | Phase 1 |
| West Meixi Lake — Wangchengpo | 28 December 2015 | 4.279 km (2.66 mi) | 4 | Western extension |
| West Railway Station — West Meixi Lake | 2026 | 13.99 km (8.69 mi) | 11 | Western extension II |
Stations
| Section | Station name | Connections | Distance km | Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| West extension II | ' | 长沙火车西站 | Changsha West railway station | |||
| ' | 龙虎岭 | |||||
| ' | 华龙 | |||||
| ' | 真人桥 | |||||
| ' | 车田湾 | |||||
| ' | 注田洲 | |||||
| ' | 桥头铺 | |||||
| ' | 莫家洲 | |||||
| ' | 漕龙桥 | |||||
| ' | 中塘 | |||||
| ' | 邵家湾 | |||||
| Western extension I | 梅溪湖西 | 0.00 | 0.00 | Yuelu | ||
| 麓云路 | 1.35 | 1.35 | ||||
| 文化艺术中心 | 1.05 | 2.40 | ||||
| 梅溪湖东 | 1.10 | 3.50 | ||||
| Phase 1 | 望城坡 | 1.15 | 4.65 | |||
| 金星路 | 1.50 | 6.15 | ||||
| 西湖公园 | 1.25 | 7.40 | ||||
| 溁湾镇 | 1.15 | 8.55 | ||||
| 橘子洲 | 1.20 | 9.75 | ||||
| 湘江中路 | 0.70 | 10.45 | Tianxin/Kaifu | |||
| 五一广场 | 0.65 | 11.10 | Tianxin/Kaifu/Furong | |||
| 芙蓉广场 | 0.80 | 11.90 | Furong | |||
| 迎宾路口 | 0.80 | 12.70 | ||||
| 袁家岭 | 0.80 | 13.50 | ||||
| 长沙火车站 | CSQ | 1.05 | 14.55 | |||
| 锦泰广场 | 0.70 | 15.25 | ||||
| 万家丽广场 | 1.25 | 16.50 | ||||
| 人民东路 | 1.50 | 18.00 | Furong/Yuhua | |||
| 长沙大道 | 2.00 | 20.00 | Yuhua | |||
| 沙湾公园 | 1.20 | 21.20 | ||||
| 杜花路 | 1.80 | 23.00 | ||||
| 长沙火车南站 | CWQ | 1.00 | 24.00 | |||
| 光达 | 2.00 | 26.00 | Changsha Co. | |||
Future
An extension is planned that would see the line extended from its current western terminus, , north to the under construction Changsha West railway station. The feasibility study for this project was approved in January 2021.[3]
References
- ^ "长沙地铁2号线西延一期载客试运营". Government of Hunan. 28 December 2015. Archived from the original on 7 March 2016. Retrieved 30 December 2015.
- ^ "Changsha metro opens". Railway Gazette. 29 April 2014. Archived from the original on 17 August 2019. Retrieved 4 May 2014.
- ^ "正式获批!长沙地铁2号线将串联两座高铁站". 8 January 2021. Retrieved 9 January 2021.