{{short description|Oldest rolling stock operating at LRT-1}} {{Use Philippine English|date=February 2023}} {{Use mdy dates|date=June 2020}} {{Infobox train | background = #EFFFE6 | name = LRTA 1000 class | image = LRT-1 Carriedo 1G 2023-06-11.jpg | caption = 1000 class LRV at {{stn|Carriedo}} in June 2023 | interiorimage = LRT-1 1000 BN LRV 1033 Monumento interior V1 2022-03-05.jpg | interiorcaption = Train interior in March 2022 | stocktype = Light rail vehicle | service = 1984–2025 | manufacturer = BN and ACEC | assembly = Bruges, Belgium | family = | replaced = | yearconstruction = 1982–1983 | yearservice = {{start date and age|1984|12|01}} | refurbishment = {{ubl|1999–2001,<ref name="Rehab1P3" /> 2003–2008|2016–2022}} | yearretired = | yearscrapped = 2000– | numberconstruction = | numberbuilt = 64 vehicles (32 sets, initially 2-car sets)<ref name="alstom2021">{{Cite web|title=Alstom in the Philippines |url=https://www.alstom.com/sites/alstom.com/files/2021/11/26/Alstom_Country_Sheet_Philippines_2021_EN.pdf |website=Alstom |date=November 26, 2021 |access-date=February 22, 2022}}</ref> | numberservice = None <!-- 41 vehicles --> | numberretired = | numberpreserved = | numberscrapped = 8 vehicles | successor = 13000 class | formation = 2/3 cars per trainset | fleetnumbers = 1001–1064 | capacity = 374 per car<br>748–1,122 per train | operator = METRO, Inc. (1984–2000)<br>LRTA (2000–2015)<br>LRMC (2015–present) | depots = Baclaran | lines = {{rint|manila|1}} Line 1 | carbody = BI sheet/copper-clad steel<ref name="dotc2012">{{Cite report|title=PROJECT NO. 4 Rehabilitation of 21 Units LRT1 BN LRVs (Re-bid)|author=Department of Transportation and Communications|author2=Light Rail Transit Authority|author-link=Department of Transportation (Philippines)|author-link2=Light Rail Transit Authority|url=https://dotr.gov.ph/images/Public_Bidding/Goods/2012/RAIL/P203MLRTA_Rehab/project_no4.pdf|date=September 14, 2012|access-date=January 3, 2022|archive-date=December 27, 2021|archive-url=https://web.archive.org/web/20211227185732/https://dotr.gov.ph/images/Public_Bidding/Goods/2012/RAIL/P203MLRTA_Rehab/project_no4.pdf|url-status=dead}}</ref> | trainlength = {{Cvt|59.58|m|ftin|frac=64}} (2 cars) <br> {{Cvt|89.37|m|ftin|frac=64}} (3 cars) | carlength = {{Convert|29.79|m|ftin|abbr=on|frac=64}} | width = {{Convert|2.5|m|ftin|abbr=on|frac=64}} | height = {{Plainlist| * {{Convert|3,272|mm|ftin|abbr=on|frac=16}} (as built) * {{Convert|3,525|mm|ftin|abbr=on|frac=32}} (refurbished) }} | floorheight = {{Convert|0.9|m|ftin|abbr=on|frac=16}} | platformheight = {{Convert|0.69|m|ftin|abbr=on|frac=64}} | doors = Double-leaf plug-type; 5 per side; {{cvt|1.3|m|in|order=flip}} wide | art-sections = 3 | wheeldiameter = {{cvt|660|mm|in|frac=64}} (new) | wheelbase = <!-- '''Per bogie:'''<br>-->{{cvt|1.9|m|ftin}} (motor bogies)<br>{{cvt|1.8|m|ftin}} (trailer bogies) <!-- <br>'''Bogie centers:'''<br>{{cvt|6.75|m|ftin}} on cab ends<br>{{cvt|7.5|m|ftin}} between trailer bogies<br>'''Total (end-to-end):'''<br>{{cvt|21|m|ftin}}--> | maxspeed = {{cvt|60|kph}} | weight = {{Plainlist| * {{Cvt|41|t|lbs}} (as built) * {{Cvt|46|t|lbs}} (refurbished) }} | axleload = {{cvt|9|t|lbs}} | traction = ACEC thyristor chopper | traction motors = 2 × {{convert|217.7|kW|hp|abbr=on}} DC series-wound | poweroutput = {{Plainlist| *{{convert|435.4|kW|hp|abbr=on}} per LRV *{{convert|870.8|kW|hp|abbr=on}} (2 cars) * {{convert|1.31|MW|hp|abbr=on}} (3 cars) }} | transmission = Right-angle link drive | acceleration = {{cvt|1.0|m/s2|ft/s2|2}} | deceleration = {{cvt|1.3|m/s2|ft/s2|2}} (service)<br>{{cvt|2.08|m/s2|ft/s2|2}} (emergency) | aux = Static converter | hvac = Forced ventilation (1984–2008)<br>Roof-mounted duct-type air conditioning (2004–present) | electricsystem = {{750 V DC}} overhead catenary | collectionmethod = <!--ACEC/-->Schunk<ref name="lrta-2006-2" /> single-arm pantograph | uicclass = Bo′+2′+2′+Bo′ | bogies = Inside-frame type | minimum curve = {{Convert|25|m|ftin|abbr=on}} | brakes = WABCO<ref name="lrta-2006-2" /> electro-pneumatic, regenerative, and rheostatic<br>{{small|Bogie-mounted disc and track brakes}} | safety = ACEC fixed block relay-type ATS (1984–2007)<br>Siemens fixed block ATP/ATS (2007–2022)<br>Alstom Atlas 100 ETCS-1 with subsystem of ATP (2022–present) | coupling = Semi-permanent<ref name=marubeni>{{Cite web|title=Infrastructure|publisher=Marubeni Philippines|url=http://www.marubeniphil.com/infra.htm|access-date=February 27, 2022|url-status=dead|archive-url=https://web.archive.org/web/20100126044817/http://www.marubeniphil.com/infra.htm |archive-date=January 26, 2010 }}</ref><!-- original: Towbar --> | seating = Longitudinal | gauge = {{track gauge|standard|allk=on}} | notes = Sourced from <ref name="BN Light Rail">{{cite web|last=|first=|date=May 16, 2020|title=BN Light Rail|website=Facebook|url=https://www.facebook.com/photo/?fbid=1180754345620220&set=p.1180754345620220|access-date=February 20, 2022|url-status=dead|archive-url=https://web.archive.org/web/20220408035455/https://www.facebook.com/photo/?fbid=1180754345620220&set=p.1180754345620220|archive-date=April 8, 2022}}</ref><ref name="LRTA DATA">{{cite report |author=Department of Transportation and Communications |author2=Light Rail Transit Authority |author-link=Department of Transportation (Philippines) |author-link2=Light Rail Transit Authority |url=https://ppp.gov.ph/wp-content/uploads/2012/05/LRT1_CavExt_PIM_04Jun2012.pdf |title=MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT |date=June 4, 2012 |access-date=April 9, 2018}}</ref>{{Sfn|JICA|2013b|p=A-26}}<ref>{{Cite web|author=Light Rail Transit Authority |title=PROCUREMENT PLAN 2006 LRV ROLLING STOCKS - ELECTRONICS SPARE PARTS IMPORTED ITEMS |url=http://www.lrta.gov.ph:80/2006%20Procurement%20Plan/2006_Procurement_LRVElectonics.pdf |date=2006 |url-status=dead |archive-url=https://web.archive.org/web/20060424160338/http://www.lrta.gov.ph:80/2006%20Procurement%20Plan/2006_Procurement_LRVElectonics.pdf |archive-date=2006-04-24 |access-date=May 26, 2022}}</ref>{{Sfn|JICA|2013a|p=12-87}} unless otherwise noted. }}
The '''LRTA 1000 class''' is the first-generation class of high-floor light rail vehicles (LRV) of the Manila LRT Line 1. Purchased under soft loans from the Belgian Government, the trains first entered service under the Light Rail Transit Authority (LRTA) in 1984.
It has undergone two refurbishments; the first from 1999 to 2008, and the most recent by the Light Rail Manila Corporation (LRMC) from 2016 to 2017. The newer 13000 class trains have gradually replaced the older 1000 class trains since July 2023.<ref name="replace" />
==Operational history== thumb|right|LRT 1000 class LRVs under construction in the BN plant in Bruges, Belgium
===Purchase=== The construction of the original {{convert|15|km|mi|adj=on|sp=us}} section of the LRT Line 1 was funded by a ₱300 million soft and interest-free loan from the Belgian Government. Additional funding for the project was later sourced from a ₱700 million loan provided by the consortium of ACEC (Ateliers de Constructions Electriques de Charleroi), BN (Constructions Ferroviaires et Metalliques, formerly Brugeoise et Nivelles), TEI (Tractionnel Engineering International), and TC (Transurb Consult). The trains were included in the second loan package, along with the power systems, signaling, and telecommunications.<ref name="History">{{cite web |title=LRTA History |url=http://lrta.gov.ph/index.php/history |website=lrta.gov.ph |access-date=May 23, 2018 |url-status=dead |archive-url=https://web.archive.org/web/20180524003849/http://lrta.gov.ph/index.php/history |archive-date=May 24, 2018}}</ref>
===Production and initial operations=== The trains were manufactured by BN (now Bombardier Transportation Belgium S.A.), while the electrical equipment supplied were from ACEC. A total of 64 trains were built between 1982 and 1983.
In its early stages, these trains ran on a two-car configuration until 1999, when it was upgraded to three cars.<ref name="LRTA DATA"/> However, not all of the train cars are capable to be coupled to form three-car sets.
===First refurbishment=== From 1999 to 2001, 32 LRVs underwent the first refurbishment, carried out by BN (Bombardier Transportation Belgium S.A.), ACEC Transport SA, Transurb Consult, and Tractebel. The car body was repaired, and a new livery design was added. Seats were also replaced, new components were installed, and modifications were made on the roof for the installation of air conditioning units. Replacement and cleaning of electrical components were not included.<ref name="Rehab1P3">{{cite web |url=http://www.lrta.gov.ph/projects/proj_l1rehabIph3.htm |title=The LRT Line 1 Rehabilitation I Project Phase 3 – Rolling Stock Rehabilitation |last=Light Rail Transit Authority |archive-url=https://web.archive.org/web/20101117074028/http://www.lrta.gov.ph/projects/proj_l1rehabIph3.htm |archive-date=November 17, 2010 |access-date=February 13, 2020}}</ref>
The 31 remaining LRVs that were not modernized in Phase 1 underwent refurbishment by the Light Rail Transit Authority from 2004 to January 2008. This involved the replacement of the electrical components of the trains, along with additional works in the 32 refurbished LRVs.<ref name="Rehab2">{{cite web |url=http://www.lrta.gov.ph/projects/proj_l1rehabII.htm |title=The LRT Line 1 Modernization Phase II-Project: Modernization and Upgrading of Existing BN ACEC LRVs |last=Light Rail Transit Authority |archive-url=https://web.archive.org/web/20080708181032/http://www.lrta.gov.ph/projects/proj_l1rehabII.htm |archive-date=July 8, 2008 |access-date=February 13, 2020}}</ref>
===Second refurbishment=== In September 2012, the then-Department of Transportation and Communications (DOTC) and the Light Rail Transit Authority (LRTA) announced a {{Philippine peso|203 million}} rehabilitation program for twenty-one first-generation vehicles.<ref>{{Cite press release|title=DOTC invites bidders for P203-m rehab of 23 LRT LRVs |url=https://www.officialgazette.gov.ph/2012/09/14/dotc-invites-bidders-for-p203-m-rehab-of-23-lrt-lrvs/ |publisher=Department of Transportation and Communications |date=2012-09-14 |access-date=April 26, 2022}}</ref>
After the Light Rail Manila Corporation (LRMC) took over the operations and maintenance of Line 1 in 2015,<ref name="pdi">{{cite web |url=https://business.inquirer.net/199164/lrt-1-now-under-ayala-metro-pacific-management |title=LRT1 now under Ayala, Metro Pacific management |publisher=Philippine Daily Inquirer |author1=Cabacungan, Gil |author2=Camus, Miguel |date=September 15, 2015 |access-date=March 30, 2019}}</ref> the company initiated the second refurbishment of the trains in 2016 worth {{Philippine peso|1 billion|link=yes}}.<ref name="P1B Rehab">{{cite web |url=https://www.interaksyon.com/breaking-news/2017/06/08/77806/lrmc-spending-p1b-to-rehabilitate-old-trains-of-lrt-1/ |title=LRMC spending P1B to rehabilitate old trains of LRT-1 |date=June 8, 2017 |website=Interaksyon |access-date=February 13, 2020}}</ref> LRMC contracted Joratech Corporation to rehabilitate forty-six LRVs.<ref name="joratech1">{{Cite web|title=Rehabilitation (Body, Flooring Repair & Repainting) of 8 Units 1st Generation Light Rail Vehicle (LRV) |url=http://www.joratech.ph/portal/index.php/product/lrt1/2-uncategorised/11-rehabilitation-body-flooring-repair-repainting-of-8-units-1st-generation-light-rail-vehicle-lrv |publisher=Joratech |access-date=April 26, 2022 |url-status=dead |archive-url=https://web.archive.org/web/20210621012958/http://www.joratech.ph/portal/index.php/product/lrt1/2-uncategorised/11-rehabilitation-body-flooring-repair-repainting-of-8-units-1st-generation-light-rail-vehicle-lrv |archive-date=June 21, 2021}}</ref><ref name="joratech2">{{Cite web|title=Repair and Repainting Works of 46 units LRV Roofing |url=http://www.joratech.ph/portal/index.php/product/lrt1/2-uncategorised/12-repair-and-repainting-works-of-46-units-lrv-roofing |publisher=Joratech |access-date=April 26, 2022 |archive-url=https://web.archive.org/web/20231001080233/http://www.joratech.ph/portal/index.php/product/lrt1/2-uncategorised/12-repair-and-repainting-works-of-46-units-lrv-roofing |archive-date=October 1, 2023}}</ref> These underwent removal of rust from the car body, repainting, replacement of flooring, and installation of new LED lightings and onboard signaling systems.<ref name="BusMir">{{cite web |url=https://businessmirror.com.ph/2017/06/07/25-lrt-1-trains-complete-p1-billion-rehabilitation-lrmc-head-says/ |title=25 LRT 1 trains complete P1-billion rehabilitation, LRMC head says |last=Marasigan |first=Lorenz |date=June 7, 2017 |website=BusinessMirror |access-date=February 13, 2020}}</ref>
As of April 2022, 46 light rail vehicles underwent the second refurbishment.<ref name="pea">{{Cite journal |last1=Peadon |first1=Brad |title=April 2022 |journal=Manila Metro Rail Systems LRT - MRT Status |publisher=Philippine Railways Historical Society |volume=6}}</ref>
===Themed trains=== By 2016, LRMC began placing special themed decorations in the 1000 class trains. These include the yearly Christmas and Valentine's-themed trains,<ref>{{cite news |url=https://www.abs-cbn.com/life/11/29/16/look-lrt-1-launches-christmas-themed-train |title=LOOK: LRT-1 launches Christmas-themed train |date=November 29, 2016 |publisher=ABS-CBN News |access-date=September 5, 2021 }}</ref><ref>{{cite news |url=https://newsinfo.inquirer.net/1228018/love-is-in-the-train-lrt-1-commuters-off-to-a-valentines-treat |title='Love is in the Train': LRT-1 commuters off to a Valentine's treat |first=Darryl John |last=Esguerra |date=February 12, 2020 |newspaper=Philippine Daily Inquirer |access-date=September 5, 2021 }}</ref> special COVID-19 pandemic and vaccination-themed decorations,<ref>{{cite news |url=https://lrmc.ph/2021/08/05/lrmc-launches-lrt-1-ingat-angat-bakuna-lahat-themed-train/ |title=LRMC launches LRT-1 Ingat Angat Bakuna Lahat themed train |date=August 5, 2021 |location=Manila, Philippines |publisher=Light Rail Manila Corporation |access-date=September 5, 2021 }}</ref> and a ''Gabay Guro'' themed train for teachers.<ref>{{cite news |first=Jan |last=Arcilla |url=https://www.manilatimes.net/2019/09/19/news/national/lrt-1-mounts-gabay-guro-train-to-promote-baybayin/618683/ |title=LRT 1 mounts 'Gabay Guro Train' to promote Baybayin |date=September 19, 2019 |work=The Manila Times |access-date=September 5, 2021 }}</ref>
===Retirement=== The first-generation 1000 class trains have been gradually replaced with the newer 13000 class fourth-generation trains.<ref name="replace">{{Cite news|title=New '4th gen' trains for LRT-1 arrive in PH|url=https://nationbuilderph.com/2021/10/new-4th-gen-trains-for-lrt-1-arrive-in-ph/|publisher=NationBuilder|date=2021-10-26|access-date=2021-12-08|archive-date=December 8, 2021|archive-url=https://web.archive.org/web/20211208092618/https://nationbuilderph.com/2021/10/new-4th-gen-trains-for-lrt-1-arrive-in-ph/|url-status=dead}}</ref> with some trains been relocated in order to accommodate the new trains.<ref>{{Cite web |date=September 7, 2022 |title=Status of LRTA's Key Projects as of July 31, 2022. |url=https://www.lrta.gov.ph/wp-content/uploads/2022/09/project-status-as-of-July-31-2022.pdf |website=Light Rail Transit Authority}}</ref>
==Design== The LRV design is an 8-axle rigid body consisting of three articulated cars. It is the only 8-axle light rail vehicle in the entire rolling stock of the LRT Line 1, as subsequent trains since 1999 were built to the 6-axle design.
===Car body=== The 1000 class trains are made of BI sheet,<ref name="BN Light Rail" /> sporting a white body livery with blue and yellow cheatlines. Prior to the first refurbishment, the 1000 class wore an orange and cream-white livery under the "Metrorail" branding, and notably had "mushroom-cap" roof-mounted ventilation.
Prior to the 2003 refurbishment, each light rail vehicle had 12 roof-mounted forced ventilation units. A refurbished light rail vehicle has five roof-mounted air-conditioning units.<ref name="LRTA DATA" />
{{gallery | height = 130 | width = 150 | captionstyle = | File:Line 1 Train near EDSA Station.jpg | alt1= | A two-car 1000 class train approaching EDSA station | File:LRT-1 Monumento 2023-08-04.jpg | alt2= | A three-car 1000 class train at Monumento station | File:LRT 1 LRV1016 with LED destination (cropped).jpg | alt3= | A newly refurbished 1000 class LRV with an LED destination front display }}
===Interior=== Each LRV has five door swing plug-type doors per side. Each train car has a capacity of 81 seated passengers and 293 standing passengers, carrying a total of 374 passengers. Seats are colored blue and are longitudinal-type.
{{gallery | height = 130 | width = 150 | captionstyle = | File:Doroteojoselrtjf.JPG | alt1= | Interior of 1000 class LRV (first refurbishment). | File:LRT1_1G_LRV_love_train_interior_from_C_to_A.jpg | alt2= | Interior of 1000 class LRV (second refurbishment). | File:LRT-1 1000 BN LRV 1033 Monumento interior V2 2022-03-05.jpg | alt3= | Interior with new Alstom signaling equipment on the left. }}
===Electrical and mechanical=== A thyristor chopper traction control system is installed in the trains, powering two direct current (DC) straight-wound traction motors. Ateliers de Constructions Electriques de Charleroi (ACEC) manufactured the electrical and traction equipment for the trains.<ref name="BN Light Rail" /><ref name="lrta-2006-2">{{Cite web|author=Light Rail Transit Authority |title=PROCUREMENT PLAN 2006 LRV ROLLING STOCK MECHANICAL/ELECTRICAL SPARE PARTS IMPORTED ITEMS |url=http://www.lrta.gov.ph:80/2006%20Procurement%20Plan/2006_Procurement_LRVMechElec.pdf |date=2006 |url-status=dead |archive-url=https://web.archive.org/web/20060430105751/http://www.lrta.gov.ph:80/2006%20Procurement%20Plan/2006_Procurement_LRVMechElec.pdf |archive-date=April 30, 2006 |access-date=May 30, 2022}}</ref>
Each LRV has four inside-frame bogies consisting of two motorized bogies at the ends of the LRV and two trailer bogies under the articulations. The primary suspension is a conical rubber, while the secondary suspension is a coil spring.{{Sfn|JICA|2013b|p=A-26}} Semi-permanent couplers<ref name=marubeni/> are present at the ends of the non-cab section (section B) of the light rail vehicles.<ref name="BN Light Rail" />
===Braking system=== Dynamic brakes are used as a service brake. There are two disc brakes per trailer bogies acting as a service brake and two disc brakes per motor bogies used as an emergency and substitution brake. Each bogie has two electromagnetic track brakes for use in case of emergency.<ref name="BN Light Rail" />
The transmission is a bogie-mounted transmission consisting of a right-angle link drive transmitted via gears and two elastic couplings.<ref name="BN Light Rail" />
==Train formation== Each unidirectional light rail vehicle consists of three articulated cars.
{| class="wikitable" style="text-align:center" |+'''Cars of 1000 class''' ! colspan="2" |Car designation ! A-car ! B-car ! C-car |- ! colspan="2" |Control cab | {{ya}} || {{na}} || {{na}} |- ! colspan="2" |Motor | {{ya}} || {{na}} || {{ya}} |- ! colspan="2" |Pantograph | {{ya}} || {{na}} || {{na}} |- ! rowspan="2" |Car length !m | colspan="3" | 31.72 |- !ft in | colspan="3" |{{convert|29.79|m|ftin|frac=64|abbr=on|disp=out}} |- ! rowspan="3"| Capacity ! Seated | colspan="3" | 81 |- ! Standing | colspan="3" | 293 |- ! Total | colspan="3" | '''374''' |}
== Incidents and accidents == * On December 30, 2000, Rizal Day, a train (car number 1037) exploded at Blumentritt station as part of a series of explosions in a terrorist attack known as the Rizal Day bombings. The attack on Line 1 killed some 22 people and injured hundreds. The damaged train was decommissioned immediately after the incident. No confirmed plans were announced on its ultimate fate, whether it would be restored or scrapped.<ref name="rizalday">{{cite news |author=Tubeza. Philip |title=Terrorist raps filed vs Asia's most wanted man |url=http://www.inq7.net/nat/2003/jul/08/nat_3-1.htm |work=Inquirer |date=July 8, 2003 |archive-url=https://web.archive.org/web/20031206145304/http://www.inq7.net/nat/2003/jul/08/nat_3-1.htm |archive-date=December 6, 2003}}</ref> The train, together with other trainsets involved in accidents, have been ultimately sold for scrap.<ref name="pea2">{{Cite journal |last1=Peadon |first1=Brad |last2=Soriente |first2=Aris |title=April 2022 |journal=Manila Metro Rail Systems LRT - MRT Status |publisher=Philippine Railways Historical Society |volume=6}}</ref> * On June 24, 2010, two trains (1G and 3G) collided at {{stn|Balintawak}} station.{{Sfn|JICA|2013a|p=8-8}} * On February 18, 2011, two trains (3G and 1G trains) collided near Roosevelt Station in Quezon City on Friday at the reversing tracks, around a kilometer away to the east. No passengers were injured.<ref>{{cite news |last=Castro |first=Doland |date=February 18, 2011 |title=2 LRT trains collide |url=https://www.abs-cbn.com/video/nation/metro-manila/02/18/11/2-mrt-trains-collide |url-status=live |location=Quezon City, Metro Manila |archive-url=https://web.archive.org/web/20200526074945/https://news.abs-cbn.com/video/nation/metro-manila/02/18/11/2-mrt-trains-collide |archive-date=May 26, 2020 |access-date=May 26, 2020 }}</ref> This caused the {{stn|Roosevelt|3=LRT}} and {{stn|Balintawak}} stations to remain closed for two months until the stations were reopened on April 11, 2011. An investigation was conducted and was shown that one of the drivers was texting when the incident occurred.<ref>{{Cite news|first=Kimberly Jane|last=Tan|title=LRT Balintawak, Roosevelt stations resume operations|url=https://www.gmanetwork.com/news/news/nation/217460/lrt-balintawak-roosevelt-stations-resume-operations/story/|work=GMA News|publisher=GMA News and Public Affairs|date=2011-04-11|access-date=2021-12-28}}</ref> As a result, LRV 1015 sustained damage. * On May 23, 2015, thousands of passengers were stranded after a train of Line 1 slammed into another train near Monumento station. A train driver was hurt after the impact caused his head to slam into the dashboard of the train.<ref>{{cite news |last=Gonzales |first=Yuji Vincent |date=May 23, 2015 |title=2 LRT trains collide due to technical glitch; at least 1 hurt |url=https://newsinfo.inquirer.net/693097/2-lrt-trains-collide-due-to-technical-glitch-at-least-1-hurt |url-status=live |newspaper=Philippine Daily Inquirer |location=South Caloocan, Metro Manila |publisher=Philippine Daily Inquirer, Inc. |archive-url=https://web.archive.org/web/20160204182202/https://newsinfo.inquirer.net/693097/2-lrt-trains-collide-due-to-technical-glitch-at-least-1-hurt |archive-date=February 4, 2016 |access-date=May 26, 2020 }}</ref> The accident, later revealed to be caused by power fluctuation that affected the signalling system, forced passengers to alight from the station until services was restored around 1 pm at the same day.<ref>{{cite news |last=Palma |first=Paola |date=May 23, 2015 |title=Minor collision disrupts LRT operation Saturday |url=https://cnnphilippines.com/metro/2015/05/23/lrt-collision.html |url-status=dead |location=Metro Manila |archive-url=https://web.archive.org/web/20160101070456/https://cnnphilippines.com/metro/2015/05/23/lrt-collision.html |archive-date=January 1, 2016 |access-date=May 26, 2020 }}</ref> * On March 10, 2016, a door in a 1G train car was left open while running between Central Terminal and Pedro Gil stations. The problem was fixed at the Pedro Gil station.<ref>{{Cite news|title=LRT-1 train travels two stations with door open|url=http://cnnphilippines.com/metro/2016/03/11/LRT-1-open-door-video.html|publisher=CNN Philippines|date=March 11, 2016|access-date=October 30, 2021|url-status=dead|archive-url=https://web.archive.org/web/20160318084626/http://cnnphilippines.com/metro/2016/03/11/LRT-1-open-door-video.html|archive-date=March 18, 2016}}</ref> * On March 22, 2016, the doors of a 1G train car at the Central Terminal station failed to open, leaving passengers trapped inside the train.<ref>{{Cite news|title=LRT passengers trapped as LRT doors fail to open|first1=Ramil|last1=Bajo|first2=Rey|last2=Galupo|work=The Philippine Star|date=March 23, 2016|access-date=October 30, 2021|url=https://www.philstar.com/headlines/2016/03/23/1566171/lrt-passengers-trapped-lrt-doors-fail-open}}</ref><ref>{{Cite AV media|title=People Trapped inside LRT and One Passed Out Because the Door Won't Open!|medium=video|url=https://www.youtube.com/watch?v=Ri0URxX25Jk|website=YouTube}}</ref> * On September 26, 2016, a faulty door in a 1G train car suddenly slammed shut in less than a second. No one was injured.<ref>{{Cite news|title=LRT-1 door slams shut on passengers; no one hurt|first=Jovic|last=Yee|url=https://newsinfo.inquirer.net/819765/lrt-1-door-slams-shut-on-passengers-no-one-hurt|newspaper=Philippine Daily Inquirer|date=28 September 2016|access-date=30 October 2021}}</ref> * On September 26, 2018, a faulty 1G train door was unable to open at the Balintawak station. A passenger pushed the door open and was able to disembark. The next passenger pushed the door though it abruptly closed on him but managed to get through.<ref>{{Cite news|title=YOU SHALL NOT PASS: Malfunctioning train door closes by itself, makes disembarking a challenge for commuters|url=https://coconuts.co/manila/news/shall-not-pass-malfunctioning-lrt-train-door-closes-makes-disembarking-challenge-commuters/|publisher=Coconuts Manila|date=28 September 2018|access-date=30 October 2021}}</ref> * On November 6, 2020, a 1G train car emitted smoke at Gil Puyat station at 2:00 PM due to a catenary fault. Passengers were evacuated, and the line implemented a provisional service from Balintawak to Central Terminal and vice versa.<ref>{{cite news|url=https://newsinfo.inquirer.net/1357331/lrt-1-train-catches-fire-in-pasay-management-limits-train-ops|title=LRT-1 train catches fire in Pasay; management limits train ops|website=INQUIRER.net|first=Consuelo|last=Marquez|date=November 6, 2020|access-date=April 25, 2021}}</ref> The situation normalized at 8:00 PM.<ref>{{cite news|url=https://newsinfo.inquirer.net/1357478/lrt-1-resumes-normal-operations-after-technical-woes-at-gil-puyat-station|title=LRT-1 resumes regular operations after technical woes at Gil Puyat Station|website=INQUIRER.net|first=Consuelo|last=Marquez|date=November 6, 2020|access-date=April 25, 2021}}</ref>
== References == {{Reflist}}
==Sources== {{commons category|LRTA Class 1000}} *{{cite report |author=Japan International Cooperation Agency |authorlink=Japan International Cooperation Agency |author2=Oriental Consultants Co., Ltd. |author3=ALMEC Corporation |author4=Katahira & Engineers International |author5=Tonichi Engineering Consultants, Inc. |url=http://open_jicareport.jica.go.jp/pdf/12126629_01.pdf |title=Study on railway strategy for enhancement of railway network system in Metro Manila of the Republic of the Philippines: Final report, Vol.1-LRT Line 1: Cavite extension project (2013) |date=July 2013 |access-date=16 January 2022 |url-status=live |archive-url=https://web.archive.org/web/20211227073918/https://openjicareport.jica.go.jp/pdf/12126629_01.pdf |archive-date=27 December 2021 |ref={{SfnRef|JICA|2013a}}}} *{{cite report |author=Japan International Cooperation Agency |author-link=Japan International Cooperation Agency |author2=Oriental Consultants Co., Ltd. |author3=ALMEC Corporation |author4=Katahira & Engineers International |author5=Tonichi Engineering Consultants, Inc. |url=http://open_jicareport.jica.go.jp/pdf/12126629_02.pdf |title=Study on railway strategy for enhancement of railway network system in Metro Manila of the Republic of the Philippines: Final report, Vol.1 LRT Line 1: Cavite extension project (2013) |date=July 2013b |access-date=27 December 2021 |url-status=live |archive-url=https://web.archive.org/web/20211227071953/https://openjicareport.jica.go.jp/pdf/12126629_02.pdf |archive-date=27 December 2021 |ref={{SfnRef|JICA|2013b}} }}
{{Rolling Stock of the Philippines}}
Category:Manila Light Rail Transit System Category:Electric multiple units of the Philippines Category:La Brugeoise et Nivelles Category:Train-related introductions in 1984 Category:750 V DC multiple units