{{short description|Highway in Mississippi and Tennessee}} {{Use mdy dates|date=May 2018}} {{Use American English|date=April 2022}} {{Infobox road |country=USA |route=269 |type=I |map={{maplink|frame=yes|plain=yes|frame-align=center|frame-width=290|frame-height=290|type=line|raw={{Wikipedia:Map data/Wikipedia KML/Interstate 269}}}} |map_custom=yes |map_notes=I-269 highlighted in red |length_mi=45.19 |established=2015 |history=Opened in 1998 as SR 385 |spur_type=I |spur_of=69 |direction_a=South |terminus_a={{Jct|state=MS|I|55|I|69|MS|304}} in Hernando, MS |junction={{plainlist|1= *{{jct|state=MS|I|22|US|78}} near Byhalia, MS }} |direction_b=North |terminus_b={{jct|state=TN|I|40|TN|385}} in Arlington, TN |states=Mississippi, Tennessee |counties='''MS:''' DeSoto, Marshall<br />'''TN:''' Fayette, Shelby |system1={{infobox road/browselinks/USA|state=MS}} |system2={{infobox road/browselinks/USA|state=TN}} |browse={{ms browse|previous_type=MS|previous_route=245|route=MS|next_type=US|next_route=278}}{{tn browse|previous_type=Sec|previous_route=268|route=TN|next_type=Sec|next_route=269}} }} '''Interstate 269''' ('''I-269''') is a partial beltway around the city of Memphis, Tennessee, and its adjacent suburban areas in southwestern Tennessee and northern Mississippi, completed in October 2018.<ref>{{Cite web|url=https://www.actionnews5.com/video/2018/10/26/i-corridor-finally-opens-connecting-i-i-/|title=I-269 corridor finally opens, connecting I-55, I-40|date=October 26, 2018 |via=www.actionnews5.com}}</ref> I-269 was planned and built to serve as an outer bypass for the Memphis metropolitan area, funneling through traffic around the metro area while also functioning as a bypass of future I-69, which will run directly through the center of the metro area. I-269 currently connects to its parent route, I-69, at an interchange in Hernando, Mississippi, and will do so again in Millington, Tennessee, in the future.
== Route description == I-269 begins at an interchange with I-69 near Hernando, Mississippi. The highway travels eastward across rural areas to the town of Byhalia, Mississippi, where it has an interchange with I-22/U.S. Route 78 (US 78). Here, the highway continues northeastward, slowly veering north towards the Tennessee state line. Entering Tennessee, I-269 has an interchange with US 72 and the southern segment of State Route 385 (SR 385) in Collierville. The route then proceeds north along former SR 385 to an interchange with I-40 and the northern segment of SR 385 in Arlington.
==History== thumb|right|I-269 extension to Mississippi under construction The Tennessee Department of Transportation's (TDOT) plans called for the two sections to be connected in phases.<ref>{{cite news |url= http://www.commercialappeal.com/news/2007/aug/26/e26loop/ |first= Tom |last= Charlier |title= Complete Tenn. 385 faces probable delays |location= Memphis |work= The Commercial Appeal |date= August 26, 2007|url-status=dead|archive-url=https://web.archive.org/web/20070930201208/http://www.commercialappeal.com/news/2007/aug/26/e26loop/|archive-date=2007-09-30}}</ref> Plans had the portion extending south from an incomplete interchange with SR 385 south to the Mississippi state line to completed in October 2015 to coincide with completion of the section in Mississippi from the Tennessee state line to Mississippi Highway 302 (MS 302).<ref>{{cite web |url= http://www.tdot.state.tn.us/construction/2012/Proposals/Sept14/CNL024_propbook.pdf |publisher= Tennessee Department of Transportation |title= Proposal Contract for CNL024|url-status=dead|archive-url=https://web.archive.org/web/20121012060049/http://www.tdot.state.tn.us/construction/2012/Proposals/Sept14/CNL024_propbook.pdf|archive-date=2012-10-12}}</ref> On January 29, 2007, the Federal Highway Administration (FHWA) issued a record of decision giving final federal approval for I-269, paving the way for the two states to design and construct the remaining section between Hernando and Collierville.
The first section of what is now I-269, the Winfield Dunn Parkway, from I-40 to US 64 opened on September 4, 2007, signed as SR 385.<ref>{{cite news|date=September 5, 2007|title=Tenn. 385 opens up Arlington — New stretch of highway hailed for its access to progress|url=<!--Needed, if available-->|work=The Commercial Appeal}}</ref> The segment between US 64 and to SR 193 (Macon Road) opened on June 15, 2009,<ref>{{cite news|last=Charlier|first=Tom|date=June 14, 2009|title=Three-mile segment of Tenn. Hwy. 385 opening|url=http://www.commercialappeal.com/news/2009/jun/14/three-mile-segment-of-385-02/|work=The Commercial Appeal|access-date=2020-05-05|url-status=dead|archive-url=https://web.archive.org/web/20090616104247/http://www.commercialappeal.com/news/2009/jun/14/three-mile-segment-of-385-02/|archive-date=2009-06-16}}</ref> and the segment between SR 193 and SR 57 opened on November 22, 2013.<ref name=wreg13/> The last section of the Bill Morris Parkway, most of which remains signed as SR 385, was opened between US 72 and SR 57 on August 23, 2007.<ref name=commercialappeal07>{{cite news|last=McKenzie|first=Kevin|date=August 22, 2007|title=Tenn. 385 opens new path: Access to Fayette County to be a Collierville short route|url=http://www.commercialappeal.com/news/2007/aug/22/e22parkway/|work=The Commercial Appeal|location=Memphis, Tennessee|access-date=2007-08-23|url-status=dead|archive-url=https://web.archive.org/web/20070930201300/http://www.commercialappeal.com/news/2007/aug/22/e22parkway/|archive-date=2007-09-30}}</ref>
On October 18, 2007, the Mississippi Department of Transportation (MDOT) announced that a bond was successfully issued through the state's Highway Enhancements Through Local Partnerships (HELP) Program for $83 million (equivalent to ${{Formatprice|{{inflation|US-GDP|83000000|2007}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}) to cover planning and right-of-way acquisition costs for Mississippi's portion of the route.<ref>{{cite news |url= http://www.commercialappeal.com/news/2007/sep/07/m7road/ |first= Wayne |last= Risher |title= Good fit sought with I-269 |location= Memphis |work= The Commercial Appeal |date= September 7, 2007|url-status=dead|archive-url=https://web.archive.org/web/20110517125357/http://www.commercialappeal.com/news/2007/sep/07/m7road/|archive-date=2011-05-17}}</ref> Mississippi began its part of I-269 construction on June 23, 2011,<ref>{{cite press release |url= http://fastlane.dot.gov/2011/06/i-269-mississippis-largest-highway-project-crucial-for-connecting-communities-and-encouraging-econom.html |title= I-269, Mississippi's largest highway project, connects communities and encourages economic growth |publisher= United States Department of Transportation |date= June 27, 2011|url-status=dead|archive-url=https://web.archive.org/web/20110629071636/http://fastlane.dot.gov/2011/06/i-269-mississippis-largest-highway-project-crucial-for-connecting-communities-and-encouraging-econom.html|archive-date=2011-06-29}}</ref> with the {{convert|25|mi|km|adj=on}} section from the state line to I-55 totaling construction costs of $640 million (equivalent to ${{Formatprice|{{inflation|US-GDP|640000000|2014}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}) as of 2014.<ref>{{cite news|url=http://www.commercialappeal.com/news/i-269-construction-reaches-halfway-point |title=I-269 Construction Reaches Halfway Point |date=March 26, 2014 |location=Memphis |work=The Commercial Appeal |archive-url=https://web.archive.org/web/20150209043749/http://www.commercialappeal.com/news/i-269-construction-reaches-halfway-point |archive-date=February 9, 2015 |url-status=dead |df=mdy-all }}</ref>
On October 23, 2015, the first signed segment of I-269 opened between the eastern terminus of SR 385 in Collierville and MS 302.<ref name=CommApp>{{cite news |first=Tom|last=Charlier |url= http://www.commercialappeal.com/news/section-of-i-269-from-collierville-to-mississippi-to-open-friday-2277e22a-9ac6-361b-e053-0100007f363-334333501.html |title=Section of I-269 from Collierville to Mississippi to open Friday |work=The Commercial Appeal |location=Memphis |date= October 19, 2015 |access-date= November 19, 2015}}</ref> On December 5, 2017, the second segment opened between MS 302 and MS 305, including the I-22 interchange.<ref>{{cite news|last=Bailey|first=Tom|date=December 8, 2017|title=Memphis to Byhalia nonstop: I-269 and I-22 now intersect|url=https://www.commercialappeal.com/story/money/business/development/2017/12/08/memphis-byhalia-nonstop-269-and-22-now-intersect/930196001/|work=The Commercial Appeal|access-date=2020-05-05}}</ref>
In 2018, TDOT redesignated a portion of SR 385 between Collierville and I-40 in Arlington as I-269.
The segment of I-269 from the I-55/I-69 interchange in Hernando to MS 305 in Lewisburg, Mississippi, was completed on October 26, 2018, completing the connection between I-40 in Tennessee and I-55 in Mississippi.<ref name=":0">{{Cite news|url=http://www.commercialappeal.com/story/money/business/development/2017/12/08/memphis-byhalia-nonstop-269-and-22-now-intersect/930196001/|title=Memphis to Byhalia nonstop: I-269 and I-22 now intersect|work=The Commercial Appeal|access-date=December 10, 2017|language=en}}</ref><ref>{{cite news |last=Garland|first=Max|date=October 26, 2018|title=I-269's completion marked with ribbon cutting in DeSoto County, opening its final stretch|url=https://www.commercialappeal.com/story/news/local/2018/10/26/269-desoto-county-mississippi-connecting-55-and-40/1772633002/|work=The Commercial Appeal|access-date=2020-05-05}}</ref><ref name=":1">{{Cite web|url=https://www.dailymemphian.com/section/businesstransportationlogistics/article/576/Last-section-of-I-269-set-to-open-Oct-26-completing-new-loop-around-Memphis|title=Last section of I-269 set to open Oct. 26, completing new loop around Memphis|website=The Daily Memphian|language=en|access-date=2018-10-11}}</ref>
The construction costs of the Tennessee portion of SR 385 from the 1980s until completion in 2013 was over $500 million (equivalent to ${{Formatprice|{{inflation|US-GDP|500000000|2013}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}).<ref name=wreg13>{{cite news |url= http://wreg.com/2013/11/22/last-part-of-385-opens-friday/ |title= Last Part of 385 Opens Friday |publisher= WREG-TV |date= November 22, 2013}}</ref> Both states' combined investments were over $1.2 billion (equivalent to ${{Formatprice|{{inflation|US-GDP|1200000000|2013}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}) for the {{Convert|64.3|mi|km|abbr=|adj=on}} I-269 project, including construction and rights-of-way expense listed above.
On October 13, 2021, a new interchange at McIngvale Road opened to traffic following a ribbon-cutting ceremony. The $8.7-million project also included realigning a {{convert|1.5|mi|km|adj=on}} section of McIngvale Road between Byhalia Road and Green T Road and widening it to five lanes.<ref name="McIngvale">{{cite web |last1=Clevenger |first1=Chance |title=County cuts ribbon on McIngvale Road & I-269 Exit |url=http://www.desototimes.com/news/county-cuts-ribbon-on-mcingvale-road-i-269-exit/article_ddf877a6-2c73-11ec-a7cc-bf88db0f59cb.html |website=The DeSoto Times Tribune |date=October 13, 2021 |access-date=October 17, 2021}}</ref>
==Exit list== {{Jcttop|exit|state_col=State|length_ref=}} {{MSint|exit |type=concur |sspan=10 |county=DeSoto |cspan=8 |location=Hernando |mile=0.00 |exit={{nowrap|1A-B}} |road={{jct|state=MS|I|69|dir1=south|MS|304|dir2=west|city1=Tunica|location2=Casinos}}<hr>{{jct|state=MS|I|55|I|69|dir2=north|city2=Southaven|location1=Memphis|city3=Jackson}} |notes=Southern terminus; exit 283A on I-55; signed as exits 1A (south) and 1B (north); southern end of MS 304 concurrency; cloverleaf interchange; freeway continues as I-69 south/MS 304 west}} {{MSint|exit |location=none |mile=1.31 |exit=1 |road=McIngvale Road |notes=Opened to traffic on October 13, 2021<ref name="McIngvale"/>}} {{MSint|exit |location=none |mile=3.17 |exit=3 |road=Getwell Road |notes=}} {{MSint|exit |location=none |mile=5.18 |exit=5 |road=Laughter Road |notes=}} {{MSint|exit |location=none |mile=7.32 |exit=7 |road=Craft Road |notes=}} {{MSint|exit |location=none |mile=9.37 |exit=9 |road={{jct|state=MS|MS|305|city1=Olive Branch|city2=Independence}} |notes=}} {{MSint|exit |mile=13.41 |exit=13 |location=none |road=Red Banks Road |notes=}} {{MSint|exit |location=Byhalia |mile=15.57 |exit=16 |road={{jct|state=MS|I|22|dir1=east|US|78|city1=Holly Springs|city2=Tupelo|location3=Birmingham|city4=Olive Branch|location5=Memphis}} |notes=Signed as exits 16A (east) and 16B (west); western terminus of I-22; I-22/US 78 exit 12}} {{MSint|exit |location=none |county=Marshall |cspan=2 |mile=17.85 |exit=18 |road={{jct|state=MS|MS|309|city1=Byhalia}} |notes=}} {{MSint|exit |type= |location=Cayce |mile=23.79 |exit=23 |road={{jct|state=MS|MS|302|city1=Southaven|city2=Olive Branch}} |notes=}} {{jctplace|exit |river=Mississippi–Tennessee state line |river_wide=yes |mile= |type=concur |place={{jct|state=MS|MS|304|dir1=ends}} }} {{TNint|exit |sspan=7 <!--15--> |location=Collierville |location2=Piperton |lspan=2 |county=Shelby |county2=Fayette |cspan=2 |type= |mile=27.24 |exit=1 |road={{jct|state=TN|US|72|name1=SR 86|city1=Collierville|location2=Corinth}} |notes=}} {{TNint|exit |mile=28.55 |exit=2 |road={{jct|state=TN|TN|385|name1=Bill Morris Parkway|city1=Memphis|dir1=west}} |notes=Eastern terminus of SR 385}} {{TNint|exit |county=Fayette |location=Piperton |mile=29.55 |exit=3 |road={{jct|state=TN|TN|57|city1=Piperton|city2=Collierville}} |notes=}} {{TNint|exit |county1=Fayette |county2=Shelby |location=none |mile=37.75 |exit=11 |road={{jct|state=TN|Sec|193|city1=Macon|city2=Fisherville}} |notes=}} {{TNint|exit |county=Shelby |cspan=3 |location=Arlington |lspan=3 <!--4--> |mile=41.70 |exit=15 |road={{jct|state=TN|US|64|name1=SR 15|city1=Bartlett|city2=Somerville}} |notes=}} {{TNint|exit |mile=44.56 |exit=18 |road=Donelson Farms Parkway |notes=}} {{TNint|exit |mile=45.19 |exit=19 |road={{jct|state=TN|I|40|TN|385|dir2=north|city1=Memphis|city2=Nashville}} |notes=Signed as exits 19A (east) and 19B (west); exit 24A on I-40; freeway continues as SR 385 north}} <!--wait until I-269 is extended before adding this below--> <!--{{TNint|exit |mile= |exit=— |road={{jct|state=TN|US|70|US|79|name2=SR 1|city1=Arlington|city2=Lakeland}} |notes=}} {{TNint|exit |location=Lakeland |mile= |exit=— |road=Stewart Road |notes=}} {{TNint|exit |location=none |lspan=3 |mile= |exit=— |road=Brunswick Road |notes=}} {{TNint|exit |mile= |exit=— |road={{jct|state=TN|TN|14|name1=Austin Peay Highway|city1=Memphis|city2=Brownsville}} |notes=}} {{TNint|exit |mile= |exit=— |road={{jct|state=TN|Sec|204|name1=Singleton Parkway|dir1=south|location1=Naval Support Activity Mid-South}} |notes=}} {{TNint|exit |location=Millington |lspan=3 |mile= |exit=— |road=Raleigh–Millington Road |notes=}} {{TNint|exit |type=incomplete |mile= |exit=— |road={{jct|state=TN|US|51|name1=SR 3|city1=Memphis|city2=Millington}} |notes=Northbound exit and southbound entrance; future continuation as I-269 North; northbound traffic must exit}} {{TNint|exit |type=unbuilt |mile= |exit=— |road={{jct|state=TN|I|69|city1=Memphis}} |notes=Future northern terminus of I-269}}--> {{Jctbtm|col=9|keys=concur}}
==See also== * {{Portal-inline|United States}} * {{Portal-inline|Mississippi}} * {{Portal-inline|Tennessee}} * {{Portal-inline|U.S. Roads}}
==References== {{Reflist|30em}}
==External links== {{Attached KML}} {{Commons category}} * [http://www.tdot.state.tn.us/public/2008/041508fayette_shelby.pdf Design Public Hearing Announcement] {{Webarchive|url=https://web.archive.org/web/20080529055052/http://www.tdot.state.tn.us/public/2008/041508fayette_shelby.pdf |date=May 29, 2008 }} (Tennessee Department of Transportation) * [http://www.gomdot.com/Home/Projects/Studies/Northern/I269/Home.aspx Original and current plans] (Mississippi Department of Transportation) * [http://www.kurumi.com/roads/3di/ix69.html#269tn Kurumi.com entry] * [http://www.i69info.com/memphis.html I69Info.com: Memphis] * [http://www.interstate-guide.com/i-269_mstn.html Interstate-Guide.com (I-269)] * [http://www.desototimes.com/news/i--completion-by/article_713bc086-e376-5d25-81c8-5a4add8aa65b.html Desoto Times]
{{3di|69}}
69-2 69-2 2 69-2 Category:Transportation in DeSoto County, Mississippi Category:Transportation in Shelby County, Tennessee Category:Memphis metropolitan area