{{Short description|State highway in Georgia}} {{Use American English|date=May 2025}} {{Use mdy dates|date=January 2025}} {{Infobox road |state=GA |type=SR |route=51 |map={{maplink-road|from=Georgia State Route 51.map}} |map_custom=yes |map_notes=SR 51 highlighted in red |length_mi=62.3 |length_ref=<ref name="Google">{{google maps |url=https://www.google.com/maps/dir/34.378982,-83.679109/34.348936,-83.574985/34.329508,-83.504808/34.338067,-83.487723/34.348955,-83.465762/34.371984,-83.403845/34.347193,-83.31974/34.34482,-83.315174/34.326366,-83.274211/34.4633317,-82.9131302/@34.3737224,-83.8565775,9z/am=t/data=!3m1!4b1!4m31!4m30!1m1!4e1!1m1!4e1!1m1!4e1!1m1!4e1!1m1!4e1!1m1!4e1!1m1!4e1!1m1!4e1!1m11!3m4!1m2!1d-83.184095!2d34.3054196!3s0x88f620bd0749bdd5:0x46be0ad2c4e0f1c9!3m4!1m2!1d-82.935795!2d34.3557801!3s0x885880f13a8b086d:0x797f781436a87735!4e1!1m0!3e0?hl=en |title=Overview map of SR&nbsp;51 |access-date=February 20, 2017 }}</ref> |length_round=1 |established=1921<ref name="GDOT 1920"/><ref name="GDOT 1921"/> |direction_a=West |terminus_a={{jct|state=GA|SR|52}} in Lula |junction={{plainlist| *{{jct|state=GA|US|441|SR|15}} northeast of Homer *{{jct|state=GA|I|85}} southwest of Carnesville *{{jct|state=GA|US|29|SR|8|SR|77}} in Hartwell }} |direction_b=East |terminus_b=Hatton Ford Road / Reed Creek Highway in Reed Creek |counties=Hall, Banks, Franklin, Hart |previous_type=SR |previous_route=50 |next_type=SR |next_route=52 }}

'''State Route&nbsp;51''' ('''SR&nbsp;51''') is a {{convert|63.6|mi|km|adj=mid|-long}} state highway that travels west-to-east through portions of Hall, Banks, Franklin, and Hart counties in the northeastern part of the U.S. state of Georgia. The highway connects Lula with Lake Hartwell, via Homer, Carnesville, and Hartwell.

==Route description== SR&nbsp;51 begins at an intersection with SR&nbsp;52 in Lula, in Hall County. It travels northeast and curves to the southeast to cross into Banks County before it leaves town. It heads to the southeast and meets the northern terminus of SR&nbsp;323 (John Morris Road) before entering Homer. There, it meets the northern terminus of SR&nbsp;164 (Historic Homer Highway). At this intersection, the highway begins heading to the northeast taking over the Historic Homer Highway and enters downtown where it intersects Athens Street and Yonah Homer Road, the former of which is an old segment of SR&nbsp;98. Later the road makes a slight curve to the southeast and then goes back to the northeast, crosses a bridge over the Hudson River, and then turns east off of the Historic Homer Highway onto Old Federal Road. Then, it intersects US&nbsp;441/SR&nbsp;15. Then, the route continues to the east, intersecting SR&nbsp;63 (Martin Bridge Road) in Jewelville, just before entering Franklin County. It curves to the southeast and has an interchange with Interstate 85 (I-85) and an interchange with SR&nbsp;59 southwest of Carnesville. It intersects SR&nbsp;326 and SR&nbsp;106 (Athens Road), before passing through Sandy Cross. There, it meets the northern terminus of SR&nbsp;174 (Salem Road) and begins to curve to the east and meets the western terminus of SR&nbsp;145 (Royston Road). The two routes head concurrent to the north-northwest for just over {{convert|1|mi|km}}, until SR&nbsp;51 heads to the east-northeast. It intersects SR&nbsp;327 before entering Canon. In town, it intersects SR&nbsp;17 (Broad Street). The two routes head concurrent to the northeast, into Bowersville, where SR&nbsp;51 splits off to the east-southeast. In Flat Shoals, to the west-northwest of Hartwell, the route begins a concurrency with SR&nbsp;77 (Lavonia Highway). The two routes cross over part of Lake Hartwell, before entering Hartwell. In town, they intersect US&nbsp;29/SR&nbsp;8 (Athens Street). All four highways head concurrent to the east-southeast for two blocks. There, SR&nbsp;51 departs to the north onto Chandler Street. It crosses backwaters of Lake Hartwell before ending at an intersection with Hatton Ford Road and Reed Creek Highway.<ref name="Google"/>

The only portion of SR&nbsp;51 that is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense, is the entire length of the SR&nbsp;17 concurrency from Canon to Bowersville.<ref name="NHS Georgia">{{cite map |url=https://www.fhwa.dot.gov/planning/national_highway_system/nhs_maps/georgia/ga_georgia.pdf |title=National Highway System: Georgia |publisher=Federal Highway Administration |date=May 8, 2019 |access-date=October 14, 2019 }}</ref>

==History== The roadway that would eventually become SR&nbsp;51 was established at least as early as 1919 as part of SR&nbsp;17 from Carnesville to Canon.<ref name="GDOT 1920">{{Cite GDOT map |year=1920 |access-date=April 28, 2017 }}</ref> By the end of 1921, SR&nbsp;17 was shifted eastward. SR&nbsp;51 was established from SR&nbsp;17 in Carnesville to SR&nbsp;59 in Canon.<ref name="GDOT 1920"/><ref name="GDOT 1921">{{Cite GDOT map |year=1921 |access-date=April 28, 2017 }}</ref> By the end of 1926, this segment of SR&nbsp;51 had a "sand clay or top soil" surface.<ref name="GDOT 1921"/><ref name="GDOT 1926">{{Cite GDOT map |year=1926 |access-date=April 28, 2017 }}</ref> In January 1932, SR&nbsp;51 was established from Bowersville to Hartwell. However, there was no indication if the two segments of SR&nbsp;51 were connected via a brief concurrency with SR&nbsp;17 or not.<ref name="GDOT 1932-01">{{Cite GDOT map |date=1932-01 |access-date=April 28, 2017 }}</ref><ref name="GDOT 1932-02">{{Cite GDOT map |date=1932-02 |access-date=April 28, 2017 }}</ref> At the end of 1935, the eastern part of the Bowersville–Hartwell segment was under construction.<ref name="GDOT 1935-10">{{Cite GDOT map |date=1935-10 |access-date=April 28, 2017 }}</ref><ref name="GDOT 1936-01">{{Cite GDOT map |date=1936-01 |access-date=April 28, 2017 }}</ref> In the first half of 1936, this segment had a "completed hard surface".<ref name="GDOT 1936-01"/><ref name="GDOT 1936-07">{{Cite GDOT map |date=1936-07 |access-date=April 28, 2017 }}</ref> By October, a portion west of this segment was under construction.<ref name="GDOT 1936-07"/><ref name="GDOT 1936-10">{{Cite GDOT map |date=1936-10 |access-date=April 28, 2017 }}</ref> In early 1937, SR&nbsp;51 was established from Lula to Homer and from north-northeast of Homer to south-southwest of Carnesville. There was no indication if they were connected via concurrencies with SR&nbsp;15 in the Homer area and/or SR&nbsp;59 in the Carnesville area.<ref name="GDOT 1937-01">{{Cite GDOT map |date=1937-01 |access-date=April 28, 2017 }}</ref><ref name="GDOT 1937-04">{{Cite GDOT map |date=1937-04 |access-date=April 28, 2017 }}</ref> By October, the central part of the Bowersville–Hartwell segment had completed grading, but was not surfaced. Also, a portion west of this part was under construction.<ref name="GDOT 1937-07">{{Cite GDOT map |date=1937-07 |access-date=April 28, 2017 }}</ref><ref name="GDOT 1937-10">{{Cite GDOT map |date=1937-10 |access-date=April 28, 2017 }}</ref> By the middle of 1939, approximately half of the Bowersville–Hartwell segment had a sand clay or top soil surface.<ref name="GDOT 1938-09">{{Cite GDOT map |date=1938-09 |access-date=April 28, 2017 }}</ref><ref name="GDOT 1939-07">{{Cite GDOT map |date=1939-07 |access-date=April 28, 2017 }}</ref> Later that year, nearly this entire segment had completed grading, but was not surfaced.<ref name="GDOT 1939-07"/><ref name="GDOT 1939-10">{{Cite GDOT map |date=1939-10 |access-date=April 28, 2017 }}</ref>

In 1942, a portion northwest of Homer was under construction.<ref name="GDOT 1942-01">{{Cite GDOT map |date=1942-01 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1943-01">{{Cite GDOT map |date=1943-01 |access-date=April 29, 2017 }}</ref> The next year, SR&nbsp;51 was extended north of Hartwell to just south of the South Carolina state line. The southern part of this extension was under construction. Also, a portion northwest of Homer had completed grading, but was not surfaced.<ref name="GDOT 1943-01"/><ref name="GDOT 1944-01">{{Cite GDOT map |date=1944-01 |access-date=April 29, 2017 }}</ref> Between November 1946 and February 1948, two segments were hard surfaced: the entire Bowersville–Hartwell segment and the southern half of the Hartwell–Reed Creek segment. Four segments had a sand clay or top soil surface: from Lula to the southern part of Homer, from the northern part of Homer to the SR&nbsp;106 intersection south-southwest of Carnesville, from the east end of the SR&nbsp;145 concurrency south-southeast of Carnesville to Canon, and the northern half of the Hartwell–Reed Creek segment.<ref name="GDOT 1946">{{Cite GDOT map |year=1946 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1948">{{Cite GDOT map |year=1948 |access-date=April 29, 2017 }}</ref> Between April 1949 and August 1950, the Lula–Homer segment was hard surfaced.<ref name="GDOT 1949">{{Cite GDOT map |year=1949 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1950">{{Cite GDOT map |year=1950 |access-date=April 29, 2017 }}</ref> By the end of 1951, two segments were hard surfaced: from the SR&nbsp;106 intersection to the east end of the SR&nbsp;145 concurrency and nearly the entire Hartwell–Reed Creek segment.<ref name="GDOT 1950"/><ref name="GDOT 1952">{{Cite GDOT map |year=1952 |access-date=April 29, 2017 }}</ref> In 1953, the segment from the east end of the SR&nbsp;145 concurrency to Canon was hard surfaced. Three segments had completed grading, but was not surfaced: from east-northeast of Homer to the SR&nbsp;59 intersection west-southwest of Carnesville, a portion just east of the east end of the SR&nbsp;145 concurrency, and the northern part of the Hartwell–Reed Creek segment.<ref name="GDOT 1953-01">{{Cite GDOT map |date=1953-01 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1953">{{Cite GDOT map |year=1953 |access-date=April 29, 2017 }}</ref> Between June 1954 and June 1955, from Homer to just east of the Banks–Franklin county line, the highway was hard surfaced.<ref name="GDOT 1954">{{Cite GDOT map |year=1954 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1955">{{Cite GDOT map |year=1955 |access-date=April 29, 2017 }}</ref> Between July 1957 and June 1960, two segments were paved: from Lula to the east end of the SR&nbsp;145 concurrency and from just east of this point to just south of Reed Creek.<ref name="GDOT 1957">{{Cite GDOT map |year=1957 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1960">{{Cite GDOT map |year=1960 |access-date=April 29, 2017 }}</ref> By the end of 1965, a portion just east of the east end of the SR&nbsp;145 concurrency was hard surfaced.<ref name="GDOT 1963">{{Cite GDOT map |year=1963 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1966">{{Cite GDOT map |year=1966 |access-date=April 29, 2017 }}</ref> In 1968, the entire length of SR&nbsp;51 was hard surfaced.<ref name="GDOT 1968">{{Cite GDOT map |year=1968 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1969">{{Cite GDOT map |year=1969 |access-date=April 29, 2017 }}</ref>

==Major intersections== {{jcttop|state=GA|length_ref=<ref name="Google"/>}} {{GAint |county=Hall |location=Lula |mile=0.0 |road={{jct|state=GA|SR|52|name1=Old Cornelia Highway/Lula Road|city1=Gillsville|city2=Clermont}} |notes=Western terminus }} {{GAint |county=Banks |cspan=5 |location=none |mile=7.5 |road={{jct|state=GA|SR|323|dir1=south|name1=John Morris Road|city1=Gillsville}} |notes=Northern terminus of SR&nbsp;323 }} {{GAint |location=Homer |lspan=2 |mile=12.0 |road={{jct|state=GA|SR|164|dir1=south|name1=Historic Homer Highway}} |notes=Northern terminus of SR&nbsp;164 }} {{GAint |mile=13.3 |bridge=Hudson River }} {{GAint |location=none |mile=14.9 |road={{jct|state=GA|US|441|SR|15|city2=Commerce|city3=Baldwin}} }} {{GAint |location=Jewelville |mile=19.1 |road={{jct|state=GA|SR|63|name1=Martin Bridge Road|city1=Commerce|city2=Toccoa}} }} {{GAint |county=Franklin |cspan=11 |location=none |mile=24.7 |road={{jct|state=GA|I|85|name1=SR&nbsp;403|location1=Atlanta|location2=Greenville}} |notes=I-85 exit 160 }} {{GAint |location=none |mile=25.0 |road={{jct|state=GA|SR|59|city1=Commerce|city2=Carnesville}} }} {{GAint |location=none |mile=27.7 |road={{jct|state=GA|SR|326|city1=Commerce}} }} {{GAint |location=none |mile=30.1 |road={{jct|state=GA|SR|106|name1=Athens Road|city1=Ila|city2=Carnesville}} }} {{GAint |location=none |mile=31.7 |road={{jct|state=GA|SR|174|dir1=south|name1=Salem Road}} |notes=Northern terminus of SR&nbsp;174 }} {{GAint |location=none |mile=34.7 |bridge=Middle Fork Broad River }} {{GAint |location=none |mile=34.7 |type=concur |road={{jct|state=GA|SR|145|dir1=south|name1=Royston Road|city1=Royston}} |notes=Western end of SR&nbsp;145 concurrency }} {{GAint |location=none |mile=37.1 |type=concur |road={{jct|state=GA|SR|145|dir1=north|city1=Carnesville}} |notes=Eastern end of SR&nbsp;145 concurrency }} {{GAint |location=none |mile=37.4 |bridge=North Fork Broad River }} {{GAint |location=none |mile=39.5 |road={{jct|state=GA|SR|327|name1=Bryant Park Road/New Franklin Church Road|location1=Victoria Bryant State Park|city2=Lavonia}} }} {{GAint |location=Canon |mile=42.3 |type=concur |road={{jct|state=GA|SR|17|dir1=south|name1=Broad Street|city1=Royston}} |notes=Western end of SR&nbsp;17 concurrency }} {{GAint |county=Hart |cspan=9 |location=Bowersville |mile=44.9 |type=concur |road={{jct|state=GA|SR|17|dir1=north|name1=Shuffond Street|city1=Lavonia}} |notes=Eastern end of SR&nbsp;17 concurrency }} {{GAint |location=Flat Shoals |mile=51.8 |type=concur |road={{jct|state=GA|SR|77|dir1=north|name1=Lavonia Highway}} |notes=Western end of SR&nbsp;77 concurrency }} {{GAint |location=none |mile=52.6 |bridge=Lake Hartwell }} {{GAint |location=Hartwell |lspan=3 |mile=53.7 |type=concur |road={{jct|state=GA|US|29|SR|8|dir1=south|dir2=south|name2=Athens Street|city2=Royston}} |notes=Western end of US&nbsp;29/SR&nbsp;8 concurrency }} {{GAint |mile=53.8 |type=concur |road={{jct|state=GA|US|29|SR|8|SR|77|dir1=north|dir2=north|dir3=south|name3=East Howell Street|location2=Anderson|city3=Elberton}} |notes=Eastern end of US&nbsp;29/SR&nbsp;8 and SR&nbsp;77 concurrencies }} {{GAint |mile=53.9 |road={{jct|state=GA|US|29|SR|8|SR|77|dir1=south|dir2=south|dir3=north|name3=West Franklin Street|city3=Royston}} |notes=Northbound lanes of US&nbsp;29/SR&nbsp;8/SR&nbsp;77 on one-way pairs }} {{GAint |location=none |mile=55.6 |bridge=Lake Hartwell |pspan=2 }} {{GAint |location=none |mile=56.0 |bridge=none }} {{GAint |location=none |mile=62.3 |road=Hatton Ford Road / Reed Creek Highway |notes=Eastern terminus }} {{jctbtm|keys=concur}}

==Reed Creek spur route== {{Infobox road small |state=GA |type=GA 1960-Spur |route=51 |location=Reed Creek |formed=1968<ref name="GDOT 1968"/><ref name="GDOT 1969"/> |deleted=1983<ref name="GDOT 1983"/><ref name="GDOT 1984"/> }} '''State Route&nbsp;51 Spur''' ('''SR&nbsp;51 Spur''') was a spur route of SR&nbsp;51 that existed entirely in Reed Creek. In 1968, it was established and hard surfaced from the SR&nbsp;51 mainline north and east-northeast to the shore of the "Hartwell Reservoir".<ref name="GDOT 1968"/><ref name="GDOT 1969"/> In 1983, it was decommissioned.<ref name="GDOT 1983">{{Cite GDOT map |year=1983 |access-date=April 29, 2017 }}</ref><ref name="GDOT 1984">{{Cite GDOT map |year=1984 |access-date=April 29, 2017 }}</ref> {{Clear}}

==See also== * {{portal-inline|Georgia (U.S. state)}} * {{portal-inline|U.S. roads}}

==References== {{reflist|30em}}

==External links== {{Attached KML|display=inline,title}} * [http://georgiaroads.tripod.com/gahwy3.htm Georgia Roads (Routes 41 - 60)]

051 Category:Transportation in Hall County, Georgia Category:Transportation in Banks County, Georgia Category:Transportation in Franklin County, Georgia Category:Transportation in Hart County, Georgia