thumb|A Franki pile The '''Franki piling system''' (also called pressure-injected footing) is a method used to drive expanded base cast-in-situ concrete (Franki) piles.<ref name="Perry1">[http://www.geoforum.com/info/pileinfo/view.asp?ID=15 Franki Pile] {{webarchive|url=https://web.archive.org/web/20110711085120/http://www.geoforum.com/info/pileinfo/view.asp?ID=15 |date=2011-07-11 }} GRV AB, Retrieved November 22, 2010</ref> It was developed by Belgian Engineer Edgard Frankignoul in 1909.<ref name="Perry3">[http://www.franki-geotechnics.be/page.asp?q=history&id=501&title=History History] Franki Foundations Group Belgium, Retrieved December 7, 2010</ref>
This method can be applied to different site conditions and is still widely used<ref name="Perry3"/><ref name="Perry5"/><ref name="Perry6"/> due to its high tensile load capacity, and relatively low noise and ground vibration levels.<ref name="Perry5"/>
==History== Edgard Frankignoul applied for the production patent for the Franki pile in July 1909. He then co-founded the geotechnical company Frankipile (Société des Pieux Armés Frankignoul) with Liège aristocrat Edmond Baar with the goal of commercializing the Franki piling system. By 1929, the technique had been implemented by 34 international subsidiaries and license holders.<ref name="Perry3"/>
The Franki pile process has undergone several reformations since it was conceived. The dry concrete plug was not introduced to the design until 1926.<ref name="Perry3"/> Before this innovation, the casing had to be top-driven and equipped with a lost bottom plate.<ref name="Perry1"/> The Franki pile with vibrated shaft and hydraulic vibrating hammer were manufactured starting from 1960 and 1971 respectively.<ref name="Perry3"/>
==Applications== Franki piles can be used as high-capacity deep foundation elements without the necessity of excavation or dewatering.<ref name="Perry6"/> They are useful in conditions where a sufficient bearing soil can only be reached deeper in the ground,<ref name="Perry2">[http://www.franki.de/pdf_en/FRANKI_pile.pdf FRANKIPILE] FRANKI Grundbau, Retrieved December 7, 2010</ref><ref name="Perry4"/> and are best suited to granular soil where bearing is primarily achieved from the densification of the soil around the base.<ref name="Perry6"/> They are not recommended for use in cohesive soils where compaction of the base is not possible.<ref name="Perry6"/> The Franki piling system is the quietest of the driven cast-in-place systems, and so is used in conditions where high noise levels could cause environmental problems.<ref name="Perry5"/>
==Installation of a Franki pile== # A charge of zero-slump concrete is poured into the bottom of a steel driving pipe that is placed vertically on the ground. A diesel-operated drop hammer is then driven on the concrete, forming a watertight concrete plug.<ref name="Perry1"/><ref name="Perry6">Shamsher Prakash, Hari D. Sharma (1990). ''Pile foundations in Engineering Practice'', p. 60. Wiley-Interscience {{ISBN|0-471-61653-2}}.</ref><ref name="Perry2"/><ref name="Perry4"/> # The concrete plug is driven into the ground by the drop hammer. The pipe is also dragged into the ground due to friction developed between the steel and the concrete.<ref name="Perry1"/><ref name="Perry6"/><ref name="Perry2"/><ref name="Perry4"/> # When the desired depth is reached, the pipe is held in position by leads—structures which guide and align the pile and hammer.<ref>{{Cite web |url=http://www.piledrivers.org/files/uploads/272D1300-0887-4849-BDB0-4044B9FF8859.pdf |title=''piledrivers.org'' PDF, Land Based Rigs |access-date=2013-10-05 |archive-date=2015-09-24 |archive-url=https://web.archive.org/web/20150924073242/http://www.piledrivers.org/files/uploads/272D1300-0887-4849-BDB0-4044B9FF8859.pdf |url-status=dead }}</ref> The hammer is then applied to the concrete, driving it outwards through the bottom of the pile and forming a mushroom-shaped base.<ref name="Perry1"/><ref name="Perry6"/><ref name="Perry2"/><ref name="Perry4"/> # At this point, a cylindrical rebar cage can be driven into the concrete if supplementary reinforcement is desired.<ref name="Perry1"/><ref name="Perry6"/><ref name="Perry2"/><ref name="Perry4">Dr. B.C. Punmia, Ashok Kumar Jain, B.C. Punmia, Arun Kr. Jain (2005). ''Soil Mechanics and Foundations'', p. 763. Laxmi Publications (P) Ltd. {{ISBN|81-7008-081-9}}.</ref> # Additional charges of concrete are added and driven while the steel casing is simultaneously pulled up until the shaft of the pile is formed.<ref name="Perry1"/><ref name="Perry6"/><ref name="Perry2"/><ref name="Perry4"/>
==Variations== * Small charges of concrete can be added while the base is being formed<ref name="Perry4"/> to enlarge the base and improve the pile’s settlement performance.<ref name="Perry5">[http://esvc000701.wic052u.server-web.com/PDF/Frank_Piles.pdf Franki Piles] {{Webarchive|url=https://web.archive.org/web/20100806165406/http://esvc000701.wic052u.server-web.com/PDF/Frank_Piles.pdf |date=2010-08-06 }} Frankipile Australia, Retrieved December 8, 2010</ref> * Franki piles can be installed raked (or sloped) with a tilt of up to 4:1.<ref name="Perry2"/> Raked Franki piles are always reinforced and are particularly suitable for structures subject to dynamic forces.<ref name="Perry1"/> * Driving methods such as open-ended coring, rock socketing, and composite shaft construction are occasionally used to overcome unique site problems.<ref name="Perry5"/>
==References== {{Reflist}}
==External links== * [Pile driver Animation empirefoundationrepair.com [http://www.empirefoundationrepair.com/the-process] {{Webarchive|url=https://web.archive.org/web/20161127214951/http://www.empirefoundationrepair.com/the-process |date=2016-11-27 }} * [https://web.archive.org/web/20110711085120/http://www.geoforum.com/info/pileinfo/view.asp?ID=15 Franki Pile, Pile Info, ''geoforum.com''] * [http://www.piledrivers.org/ ''piledrivers.org''], Pile Driving Contractors Association