[1]

Florida State Road 79
SR
StateFL
Route79
MaintFDOT
Length60.673 mi
Direction aSouth
Terminus ain Panama City Beach
Junctionin Ebro
in Vernon
in Bonifay
in Bonifay
in Esto
Direction bNorth
Terminus bnear Esto
CountiesBay, Washington, Holmes
Previous route78
Next route80

State Road 79 (SR 79) is a north–south highway in the panhandle of Florida. It is a popular route for tourists to and from the Panama City Beach area. The route begins at Alabama State Route 167 at the Alabama–Florida border and runs to its southern terminus at US 98 in Panama City Beach, Florida. Currently, the highway is being expanded to four lanes north of Panama City to the junction with Interstate 10. SR 79 is a major hurricane evacuation route from the coastal area. It is one of few designated routes northward between Pensacola and Panama City.

History

As of June 1, 2009, the route between US 98 (Back Beach Road) at Panama City Beach and SR 20 at Ebro was being expanded to four lanes. A second bridge over the Gulf Intracoastal Waterway at West Bay has been completed and is now open making the four lane complete for about a 5-mile (8.0-kilometre) stretch from US 98 northward to the intersection of SR 79 and SR 388 at West Bay. North of this completed stretch construction continues to a point just north of the Ebro Greyhound Racetrack. As of 2023, after ten years of work construction from north of Ebro to Interstate 10 has not been completed. A dangerous section in Vernon has been abandoned by crews for years and left with cones diverting traffic on a hilly part of the road. Also in 2023, the Y intersection with Front Beach Road in Panama City Beach was replaced with a roundabout.

References

  1. ^ "SR 79 and Front Beach Road roundabout now open". WJHG. Retrieved 30 September 2023.