Aarhus Light Rail
Native nameAarhus Letbane
StatusOperational
LocaleAarhus area, Central Denmark Region, Denmark
Lines
  • L1
  • L2
Open21 December 2017[1]
OwnerAarhus Municipality (50 %)
Central Denmark Region (50 %)[2]
OperatorMidttrafik
Keolis
Stock
Total track length110 kilometres (68 mi)[3]
Stops51[4]
Propulsion systemOverhead line
Websitehttps://www.midttrafik.dk/letbanen/in-english.aspx (operator)
http://www.letbanen.dk/ Aarhus Letbane (construction project)

The Aarhus Light Rail (Danish: Aarhus Letbane) is a light rail system with interurban characteristics serving the city of Aarhus and the surrounding region in Central Jutland, Denmark. It is operated by the local transport operator Midttrafik.[5] The first line opened in December 2017, service on the intercity section Odder to Lisbjergskolen in August 25, 2018,[5] and a third intercity line to Grenaa opened on 30 April 2019. More lines are being planned.

On 8 May 2012, the Danish Parliament approved the construction of the first line; work to build Phase 1 commenced during September 2013.[6] It was originally planned to open in August 2016, but this was delayed, in part due to legislative issues in relation to railway safety.

As of 2026, the system is composed of two converted railway branchlines: the Grenaa line running 69 km (43 mi) north to Grenaa railway station and the Odder line, running 26.5 km (16.5 mi) to Odder railway station combined with a 12 km (7.5 mi) urban tram section from Aarhus Central Station to Lystrup. Due to these mixed characteristics, two types of rolling stock were considered from the start, 70 km/h (43 mph) vehicles for the urban section, and 100 km/h (62 mph) vehicles for the regional routes.[6] Ultimately both types were supplied by the rail manufacturer Stadler.[7]

From its opening and until the opening of the Odense light rail in May 2022,[8][9] the Aarhus light rail was the only operational light rail or tram system in Denmark.[1][a] Denmark's third Light Rail project, the Copenhagen Light Rail, opened its first section on 26 October 2025[10][11] with the rest of the first line currently under construction.[12]

History

Background

The development of a light rail system around Aarhus, the second biggest city in Denmark, was originally proposed as early as 2006.[13] In response to rising interest in the concept, during January 2009, the Danish Parliament granted an allocation of DKK 500 million ($85 million) to support the light rail project as part of a wider green transport package.[13]

During October 2010, work commenced upon several studies.[13] According to transport authority Midttrafik, who later operated the completed network, the Aarhus light rail programme had drawn considerable inspiration from tram-train operations on the tram network in Kassel, Germany. In addition, consultancy firms COWI A/S and SYSTRA contributed their own studies and technical support for the project, including an initial feasibility study and development of tender documentation.[6] The project's Environmental Impact Assessment report was produced by C. F. Moller; it was estimated that establishing the light rail network would result in annual energy savings of 47 gigawatt hours and reduce carbon dioxide emissions by 73 tonnes (161,000 lb) during each year of operation.[13]

Various different approaches for the network were being considered at one stage, including the full electrification of the route, the procurement of a combination of 750 V DC trams and electro-diesel tram-trains. It was recognised that, if the option of full electrification was to be exercised, a catenary-free system may be chosen for the harbour-side element of Phase 1.[6] By late 2012, it had already been decided that Germany's BOStrab light rail regulations would be applied to the tentative network, while Lloyd's Register was appointed to serve as the independent safety assessor. By mid-2012, construction activity was scheduled to begin during June 2013, while the light rail network's opening was planned to occur during August 2016.[6]

On 8 May 2012, the Danish Parliament gave its approval for the construction of the Aarhus light rail line, which would be the first such modern line in Denmark, and granted the legal powers to proceed with the initiative.[6] As a consequence, the Aarhus Letbane joint venture between the local municipality, the Ministry of Transport and the Midtjylland region was formally established to promote and further the project during August 2012.[13] The construction of Phase 1 has been estimated to have cost DKK 2.4 billion ($408 million); financing was provided by the City of Aarhus (47.2 percent), the Danish central government (47 percent) and the Central Denmark Region (5.8 per cent). Additionally, the European Investment Bank provided DKK 14.2 million to the initiative as part of the European Commission’s European Local Energy Assistance programme (ELENA).[13][14]

The competitive tendering process for the network's construction was launched shortly after the formation of the joint venture.[6] The contracts for the construction of Aarhus light rail line were awarded in three separate packages; these included a negotiated design-and-build contract that covered both the railway systems and rolling stock, valued at between €150 million and €180 million, along with a pair of lower value contracts to build the related civil works for the line.[6] During July 2014, a German-Italian consortium, comprising Stadler Rail and Ansaldo STS, was awarded the contract for the construction and outfitting of Phase 1 of the Aarhus light rail. Stadler supplied the rolling stock for the line while Ansaldo STS provided the associated infrastructure, such as the tracks, signalling systems, control centre, and maintenance facility.[13][15]

Phase 1

Phase 1 is a 12 km (7.5 mi) double-track tramway running from Aarhus Central Station, via Skejby and Lisbjerg to Lystrup.[6] The line forms a loop spanning across Aarhus' city centre, linking into the existing regional railways running to Odder in the south and Grenaa in the northeast; to facilitate such operations, the existing Odder Line railway from Aarhus to Odder and Grenaa Line railway to Grenaa were modified to accommodate light rail services.[6][13] The two existing local lines have been electrified and adapted in other ways to Phase 1, but their alignment was retained. Furthermore, the existing mainline rail station at Aarhus, along with existing park and ride facilities near major stops along the route were refurbished.[13]

Various pieces of infrastructure and civil works were performed during the construction phase of the project.[13] During October 2014, work commenced on the boring of a pair of tunnels to carry the tramway between Aarhus University and Aarhus University Hospital in Nørrebrogade.[dubious – discuss] In the following year, both the Randers Way and Nørrebro Street had to be reduced in width in order to allocate space between the lanes for the installation of the new double-track line.[13] In total, eight bridges had to be constructed during Phase 1; of these, the bridge over the Egaa valley, possessing a length of 347 metres (1,138 ft), is the largest bridge to be built in the programme.[13] Overall, Phase 1 is to have a total of 110 kilometres (68 mi) long and serve 51 stops once upon completion.[16]

The opening of Phase 1 was originally scheduled to occur on 23 September 2017;[17][dead link] however, the event was cancelled only a few hours before the event as a result of missing security clearances from the Danish government authority.[18] Accordingly, the opening date was pushed back to the following month,[19] before being further delayed thereafter. It was said that both the government and the city were inexperienced with tramway operation, since no tramways existed in Denmark between 1972 and 2017, resulting in problems in interpreting the rules. Especially for the reused railway lines, it was unclear whether they could be grandfathered or must obey rules for new lines. On 20 December 2017, it was announced that approval for the new lines had finally been issued, allowing for services on the central tram section to commence during the following day.[1][20] Traffic on the Odder line and to Lisbjergskolen was delayed more and started on 25 August 2018. Traffic to Grenaa opened on 30 April 2019.[21]

Future

Even prior to work commencing on Phase 1, several expansion plans had already been discussed.[6] During January 2018, it was publicly stated that options for the construction of two new branches, from Lisbjerg to Hinnerup (8 km (5.0 mi)) and from Aarhus to Brabrand (11 km (6.8 mi)), were in the detailed planning phase.[22][23][24][25]

Rolling stock

From an early stage in the project, it became clear that two different types of rolling stock would be required; to service the city center areas, conventional trams capable of up to 70 km/h (43 mph) were recommended, while trams capable of a maximum speed of 100 km/h (62 mph) would be necessary to conduct the longer distance routes.[6][7] Accordingly, contracts have been signed with Swiss rolling stock manufacturer Stadler for the delivery of two types of trams for the network:[26][27]

  • Stadler Tango: 12 vehicles, max speed 100 km/h (62 mph), used between Grenaa and Aarhus H station
  • Stadler Variobahn: 14 vehicles, max speed 80 km/h (50 mph), used between Odder and Lystrup

Future

On 2 December 2025, Aarhus Letbane entered an agreement with Stadler for the supply of 8 Citylink trams in order to increase service frequency. The trams will have four segments and a capacity of 152 seated passengers and 180 standees, an increase of 80 over the current Stadler Tango trams. The trams are expected in 2029 and will be equipped with an onboard battery pack in order to enable operation in the event of overhead line icing.[28][29]

Table

Rolling stock of the Aarhus Light Rail system
YearManufacturerModelImageQuantitySpeed (mph)CapacityRef.
2016StadlerTango12100 kilometres per hour (62 mph)266[27]
Variobahn1480 kilometres per hour (50 mph)224
2029StadlerCitylink8100 kilometres per hour (62 mph)332[28]

Stations

Grenaa Line (L1)Central tramway (L2)Odder Line (L2)
  • Lystrup (connection to L1)
  • Nye
  • Lisbjerg - Terp
  • Lisbjergskolen
  • Lisbjerg Bygade
  • Klokhøjen
  • Humlehuse
  • Gl. Skejby
  • AU Hospital
  • Olof Palmes Allé
  • Nehrus Allé
  • Vandtårnet
  • Stockholmsgade
  • Stjernepladsen
  • Aarhus Universitet
  • Universitetsparken
  • Nørreport
  • Skolebakken (connection to L1)
  • Dokk1
  • Aarhus H (railway)

Ridership

Yearly and quarterly passenger numbers[30][31]
Year1st Quarter2nd Quarter3rd Quarter4th QuarterYearly total
20191,155,7321,078,2501,195,4761,358,8374,788,295
20201,145,088672,821908,100907,5883,588,597
2021580,619970,4001,085,7551,341,8223,978,596
20221,228,4181,365,1311,512,1011,368,8715,474,521
20231,413,9061,301,6291,474,1861,572,3725,762,063
20241,590,3271,644,5881,532,7321,583,5656,351,212
20251,582,7721,469,8121,469,5161,530,6286,052,728
20261,491,4291,491,429

In June of 2024, and again in April of 2025 and May of 2026, the local Århus Stiftstidende newspaper released the official passenger numbers for all stations on Aarhus Letbane for the first quarter of the respective year:[32][33]

Individual station's passenger numbers for January, February and March of 2024, 2025 and 2026[32][33][34]
StationTotal passenger number (1st quarter 2024)Total passenger number (1st quarter 2025)Total passenger number (1st quarter 2026)*Lines served
Grenaa28,53228,93628,787L1
Hessel2,9043,8473,666L1
Trustrup4,0594,7515,003L1
Kolind9,60010,1489,849L1
Ryomgård21,95922,33821,749L1
Thorsager4,0094,5884,911L1
Mørke10,20010,2279,328L1
Hornslet25,00327,44624,126L1
Løgten12,03012,72814,281L1
Skødstrup23,82524,26621,128L1
Hjortshøj25,20426,12823,847L1
Hovmarken4,286N/A[b]N/A[c]L1
Lystrup69,69474,12176,863L1, L2
Torsøvej33,22633,42131,457L1
Vestre Strandallé21,31021,71817,011L1
Risskov Strandpark7,4899,438No number given[d]L1
Østbanetorvet22,94824,09423,265L1
Nye3,6454,0164,649L2
Lisbjerg-Terp2,4092,2322,856L2
Lisbjergskolen14,62218,8120*L2
Lisbjerg Bygade12,19613,15815,416L2
Klokhøjen6,4896,69216,391[e]L2
Humlehuse4,7214,4514,177L2
Gl. Skejby (Agro Food Park)9,9839,8929,977L2
Universitetshospitalet108,178101,41973,306L2
Olof Palmes Allé47,53745,43335,219L2
Nehrus Allé38,21237,37832,747L2
Vandtårnet (Ringvejen)51,01656,01936,382L2
Stockholmsgade36,13236,14223,281L2
Stjernepladsen52,85952,99944,435L2
Aarhus Universitet (Ringgaden)81,41774,07846,584L2
Universitetsparken26,72124,79619,632L2
Nørreport79,48977,14257,276L2
Skolebakken73,77176,42760,195L1, L2
Dokk174,13376,75071,030L1, L2
Aarhus H340,893332,467256,653L1, L2
Kongsvang5,7365,1953,857L2
Viby J44,59244,17636,601L2
Rosenhøj21,05720,78014,377L2
Øllegårdsvej4,7186,7816,510L2
Gunnar Clausens Vej17,03614,5138,934L2
Tranbjerg21,40520,78616,603L2
Nørrevænget6,4006,4425,489L2
Mølleparken3,8183,7013,293L2
Mårslet25,59823,88520,412L2
Vilhelmsborg573857688L2
Beder7,8247,5845,051L2
Malling13,21512,1489,310L2
Assedrup941945665L2
Rude Havvej4,8574,9073,557L2
Odder21,88821,77817,112L2

*Due to major issue with the magnetic track brakes on Aarhus Letbane's Variobahn trains and the way the interact with certain points at Universitetshospitalet and Lisbjerg Bygade, services have for safety reasons been banned from using the middle track at Universitetshospitalet station, used for terminating services turning around, as well as the spur line leading to Lisbjergskolen. This has limited service on the core section of the L2 line between Aarhus Central Station and Universitetshospitalet to four trains per hour in each direction, down 50% from the ordinary eight trains per hour, as well completely preventing service to Lisbjergskolen, with these services instead rerouted to Lystrup, increasing service of Lisbjerg-Terp, Nye and Lystrup stations to four trains per hour on the L2 line, up from the ordinary two trains per hour. This has been the case since March of 2025.[35][36][37][34] The issues with the Variobahns have also lead to frequent shortages of available trains for service, resulting in peak-hour services on the L1 line between Aarhus Central Station and Hornslet being removed from the timetable since the 20th of October 2025.[38][39][40] These issues, combined with evening and weekend engineering works on the Odder line section of the L2 line during the first three months of 2026, are believed to be the main cause of a major decrease in passenger numbers on large parts of the light rail system compared to the first quarter of the year before.[34]

In February of 2023, Århus Stiftstidende released the official passenger numbers for all stations on Aarhus Letbane, except Trustrup.[41] These numbers are the daily average of passengers boarding at each respective station on weekdays from the 15th of August 2022 to the 18th of December 2022. See below for each station's passenger numbers.

Aarhus Light Rail average ridership per weekday by station, August – December 2022[41]
StationAverage ridershipLines served
Grenaa479L1
Hessel39L1
TrustrupNo dataL1
Kolind148L1
Ryomgård334L1
Thorsager67L1
Mørke140L1
Hornslet386L1
Løgten167L1
Skødstrup295L1
Hjortshøj319L1
Hovmarken64L1
Lystrup915L1, L2
Torsøvej337L1
Vestre Strandallé231L1
Risskov Strandpark118L1
Østbanetorvet274L1
Nye43L2
Lisbjerg-Terp30L2
Lisbjergskolen106L2
Lisbjerg Bygade136L2
Klokhøjen71L2
Humlehuse41L2
Gl. Skejby (Agro Food Park)96L2
Universitetshospitalet1233L2
Olof Palmes Allé608L2
Nehrus Allé442L2
Vandtårnet (Ringvejen)631L2
Stockholmsgade451L2
Stjernepladsen627L2
Aarhus Universitet (Ringgaden)1075L2
Universitetsparken405L2
Nørreport1055L2
Skolebakken1079L1, L2
Dokk1983L1, L2
Aarhus H4409L1, L2
Kongsvang81L2
Viby J678L2
Rosenhøj314L2
Øllegårdsvej69L2
Gunnar Clausens Vej244L2
Tranbjerg339L2
Nørrevænget92L2
Mølleparken79L2
Mårslet413L2
Vilhelmsborg13L2
Beder144L2
Malling207L2
Assedrup15L2
Rude Havvej80L2
Odder404L2

See also

Notes

  1. ^ Excluding museum operations such as the Danish Tramway Museum.
  2. ^ The station was closed in June 2024.
  3. ^ The station was closed in June 2024.
  4. ^ Not known why
  5. ^ Serves a Park & Ride facility which during this period trialled combined free parking and free travel with the Light Rail for those parking during the morning peak, which resulted in a major increase in passenger numbers.

References

  1. ^ "Aarhus Letbane åbner torsdag den 21. december"
  2. ^ "Organisation"
  3. ^ "Om Letbanen" (in Danish). Aarhus Letbane. Retrieved 2019-04-01.
  4. ^ "Letbanen binder Aarhusområdet sammen". Archived from the original on 24 December 2016.
  5. ^ "Letbanen". Midttraffik. Retrieved 31 January 2017.
  6. ^ "Aarhus tram-train project gets the go-ahead". Railway Gazette International. 10 May 2012. Archived from the original on 1 March 2020. Retrieved 11 May 2012.
  7. ^ Barrow, Keith (2015-06-01). "Aarhus tram-train design revealed". International Railway Journal. Retrieved 2025-12-06.
  8. ^ "Efter 6 store nedture: Nu kan du endelig hoppe på Odense Letbane" (in Danish). DR. 2022-05-28. Retrieved 2022-05-31.
  9. ^ "Celebrations as Odense tramway opens". Railway Gazette International. 2022-05-31. Retrieved 2022-05-31.
  10. ^ https://www.urban-transport-magazine.com/en/copenhagens-new-light-rail-system-inaugurated/
  11. ^ https://www.railwaygazette.com/light-rail-and-tram/k%C3%B8benhavn-tramway-opens-to-make-it-faster-and-more-comfortable-to-get-around/69840.article
  12. ^ "Følg byggeriet" (in da-DK). Hovedstadens Letbane. Archived from the original on 2021-02-08. Retrieved 2022-05-31.
  13. ^ "Aarhus Light Rail Project, Aarhus". Railway Technology. Retrieved 2025-12-06.
  14. ^ "Energy efficiency: Trams gain traction in Denmark". European Investment Bank. Retrieved 2025-12-06.
  15. ^ "Global Railway Review". Global Railway Review. Retrieved 2025-12-06.
  16. ^ "Om Letbanen [About the Lightrail]" (in Danish). letbanen.dk. Archived from the original on 11 April 2014. Retrieved 31 January 2017.
  17. ^ "Aarhus light rail to open in September." metro-report.com, 3 May 2017.
  18. ^ Hecklen, Alexander (22 September 2017). "Letbanedirektør har kendt til manglende godkendelse i tre dage". DR.dk. Retrieved 26 September 2017.
  19. ^ "After embarrassing setback, Aarhus light rail gets new opening date… maybe". The Local. 27 September 2017. Retrieved 27 September 2017.
  20. ^ "Aarhus opens Denmark’s first modern light rail line." Archived 2017-12-24 at the Wayback Machine metro-report.com, 21 December 2017.
  21. ^ Aveo (2019-04-24). "Letbanen åbner for passagerdrift til Grenaa 30. april" (in da-DK). Aarhus Letbane. Retrieved 2025-12-06.
  22. ^ "Planlægning af nye letbaneetaper - Aarhus Letbane" (in Danish). www.letbanen.dk. Archived 2018-10-29 at the Wayback Machine. Retrieved 2025-12-06.
  23. ^ "Idéoplæg til styrkelse af Århus letbaneprojekt". www.letbaner.dk. Retrieved 2 December 2025.
  24. ^ "Høringssvar om Århus letbane". www.letbaner.dk. April 2010. Retrieved 2 December 2025.
  25. ^ "Input til Aarhus letbane, etape Aarhus Ø – Brabrand". www.letbaner.dk. Retrieved 2 December 2025.
  26. ^ "#17 Togleverandør - Aarhus Letbane" (in Danish). www.letbanen.dk. Archived 2017-07-31 at the Wayback Machine. Retrieved 2025-12-06.
  27. ^ "Stadler presents the first Variobahn for Aarhus (Denmark)." Archived 2017-05-27 at the Wayback Machine stadlerrail.com, Retrieved: 9 June 2018.
  28. ^ maja_bech (2025-12-02). "Flere tog på vej til Aarhus Letbane: Nu bliver der plads til flere afgange og passagerer" (in da-DK). Aarhus Letbane. Retrieved 2025-12-04.
  29. ^ "Stadler to deliver eight CITYLINK Tram-Trains to Aarhus". www.stadlerrail.com. Retrieved 2025-12-04.
  30. ^ maja_bech (2024-01-17). "Aarhus Letbane sætter ny passagerrekord" (in da-DK). Aarhus Letbane. Retrieved 2025-12-06.
  31. ^ "Passagertal" (in da-DK). Aarhus Letbane. Retrieved 2025-12-06.
  32. ^ "Aflysninger har kostet passagerer i letbanen: Her er listen over de mest og mindst travle stationer | stiften.dk" (in Danish). stiften.dk. 2025-04-25. Retrieved 2025-04-25.
  33. ^ "Passagererne strømmer ind i letbanetogene - her er listen over de mest og mindst travle stationer på Aarhus Letbane | stiften.dk" (in Danish). stiften.dk. 2024-06-02. Retrieved 2024-06-03.
  34. ^ "Vedvarende aflysninger koster dyrt: Letbanen har tabt hver femte passager | stiften.dk" (in Danish). stiften.dk. 2026-05-08. Retrieved 2026-05-08.
  35. ^ "Sejlivet fejl på letbanen: Daglige aflysninger - en station betjenes slet ikke | stiften.dk" (in Danish). stiften.dk. 2025-04-09. Retrieved 2026-05-08.
  36. ^ "Værre end først antaget: Letbanestation lukket og aflysninger fortsætter frem til sommer | stiften.dk" (in Danish). stiften.dk. 2025-04-21. Retrieved 2026-05-08.
  37. ^ "Skinnerne ruster: Letbanestrækning lukket resten af året | stiften.dk" (in Danish). stiften.dk. 2025-07-20. Retrieved 2026-05-08.
  38. ^ "Køreplaner L1 og L2 - Midttrafik" (in Danish). web.archive.org. Retrieved 2026-05-08.
  39. ^ "Derfor må letbanen nu skære endnu mere i køreplanen | stiften.dk" (in Danish). stiften.dk. 2025-10-09. Retrieved 2026-05-08.
  40. ^ maja_bech (2025-10-09). "Aarhus Letbane erkender: Det er ikke godt nok" (in da-DK). Aarhus Letbane. Retrieved 2026-05-08.
  41. ^ "Passagermangel var ved at lukke letbanestationer: Nu er der gået ni år, og det ser stadig slemt ud - se tallene | stiften.dk" (in Danish). stiften.dk. 2023-02-26. Retrieved 2025-12-06.