# Silom Line

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Silom_Line
> Markdown URL: https://mediated.wiki/source/Silom_Line.md
> Source: https://en.wikipedia.org/wiki/Silom_Line
> Source revision: 1344919118
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

Elevated rapid transit line in Bangkok, Thailand

BTS Silom Line สายสีลม EMU-B3 at Talat Phlu Station Overview Owner Bangkok Metropolitan Administration Locale Bangkok Termini National Stadium Bang Wa Stations 14 (operational) 14 (planned) Color on map Dark Green Service Type Rapid transit System BTS Skytrain Operator Bangkok Mass Transit System Public Company Limited Depot(s) Mo Chit Depot (shared with BTS ) Khu Khot Depot (shared with BTS ) Bang Wa Depot Rolling stock Siemens Modular Metro EMU-A1: 35 four-car trains Siemens Bozankaya EMU-A2: 22 four-car trains CNR Changchun Railway Vehicles EMU-B1: 12 four-car trains CNR Changchun Railway Vehicles EMU-B2: 5 four-car trains CRRC Changchun Railway Vehicles EMU-B3: 24 four-car trains Daily ridership 926,294 ( BTS and BTS ) 30 August 2024[1] History Commenced 9 April 1992; 34 years ago (1992-04-09) Opened 5 December 1999; 26 years ago (1999-12-05) Last extension 8 February 2021; 5 years ago (2021-02-08) Technical Line length 13.09 km (8.13 mi) Character Fully elevated Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge Electrification 750 V DC third rail Operating speed 80 km/h (50 mph) Signalling Former: Siemens Trainguard LZB700M fixed block ATC under ATO GoA 2 (STO) Current: Bombardier CITYFLO 450 moving block CBTC ATC under ATO GoA 2 (STO), with subsystems of ATP, ATS and CBI[2][3] Route map Legend 0W1 National Stadium BTS ↑ Khu Khot Kheha ↓ CEN Siam 0S1 Ratchadamri Si Lom MRT Tha Phra → ↓ Lak Song 0S2 Sala Daeng 0S3 Chong Nonsi 0S4 Saint Louis 0S5 Surasak Si Rat Expressway 0S6 Saphan Taksin Mine Smart Ferry at Sathorn Pier Chao Phraya River 0S7 Krung Thonburi BTS SRT (planned) Hua Lamphong MRT ← Khlong Bang Phai (planned) Rat Burana → 0S8 Wongwian Yai BTS 0S9 Pho Nimit S10 Talat Phlu Maeklong Railway SRT (planned) Maha Chai → S11 Wutthakat S12 Bang Wa MRT ↑ Tha Phra Lak Song → Light Depot This diagram: view talk edit

**The Elevated Train in Commemoration of [HM the King's](/source/Bhumibol_Adulyadej) 6th Cycle Birthday 2nd line**, also known as **Silom Line**, is one of the rapid transit lines of the [BTS Skytrain System](/source/BTS_Skytrain) in [Bangkok](/source/Bangkok), Thailand.**[4]**The line runs eastward from [National Stadium Station](/source/National_Stadium_BTS_station) in [Pathum Wan District](/source/Pathum_Wan_District) over [Rama I Road](/source/Rama_I_Road) and interchanges with the [Sukhumvit Line](/source/Sukhumvit_Line) at [Siam station](/source/Siam_BTS_station), then turns southward, following [Ratchadamri](/source/Ratchadamri_Road), [Si Lom](/source/Si_Lom_Road), [Naradhiwas Rajanagarindra](/source/Naradhiwas_Rajanagarindra_Road) and [Sathon](/source/Sathon_Road) Roads to [Taksin Bridge](/source/Taksin_Bridge) where it crosses the [Chao Phraya River](/source/Chao_Phraya_River) to the [Thonburi](/source/Thonburi) side of Bangkok and [Wong Wian Yai](/source/Wong_Wian_Yai). It continues west along the Ratchaphruek Road before it terminates at [Bang Wa Station](/source/Bang_Wa_BTS_Station) in [Phasi Charoen District](/source/Phasi_Charoen_District).[5][6]

The line was first opened on 5 December 1999, along with the [Sukhumvit Line](/source/Sukhumvit_Line). Both lines are operated by the [Bangkok Mass Transit System Public Company Limited](/source/Bangkok_Mass_Transit_System_Public_Company_Limited) under a 30-year concession from the [Bangkok Metropolitan Administration](/source/Bangkok_Metropolitan_Administration). When it opened, the line ran from [National Stadium](/source/Mo_Chit_BTS_station) to [Saphan Taksin](/source/Saphan_Taksin_BTS_station) stations covering a total distance of 6.5 km (4.0 mi) with 7 stations. Silom Line is one of the main arteries of the [Bangkok Mass Rapid Transit System](/source/Mass_Rapid_Transit_Master_Plan_in_Bangkok_Metropolitan_Region) with 900,000 daily passengers per day (combined with the Sukhumvit Line).[*[when?](https://en.wikipedia.org/wiki/Wikipedia:Manual_of_Style/Dates_and_numbers#Chronological_items)*]

## History

### Original plan

The original alignment of the Silom line was for the line to being at a station near the intersection of [Rama I Road](/source/Rama_I_Road) and [Rama VI Road](https://en.wikipedia.org/w/index.php?title=Rama_VI_Road&action=edit&redlink=1), labelled W2 station, travelling above Rama I Road and meeting with the [Sukhumvit Line](/source/Sukhumvit_Line), before turning south on [Ratchadamri Road](/source/Ratchadamri_Road). The line was to continue straight on [Si Lom Road](/source/Si_Lom_Road) until the Surasak Intersection, before turning south on Surasak Road, and west again on Sathorn Road, ending at a [station](/source/Saphan_Taksin_BTS_station) labelled S5 and located on the Sathorn Bridge.[7]

The depot for both lines was initially located at [Lumphini Park](/source/Lumphini_Park). However, due to public backlash, it was relocated to the former site of the Northern Bus Terminal (also known as Mo Chit Bus Terminal) near [Mo Chit station](/source/Mo_Chit_BTS_station) on the [Sukhumvit Line](/source/Sukhumvit_Line). Several changes were made during the construction as follows:

- W2 station was deleted;

- [CEN station](/source/Siam_BTS_station) was moved from the west side of Chaloem Phao junction to the west side;

- [S2 station](/source/Sala_Daeng_BTS_station) was changed from an island platform to side platforms;

- [S3 station](/source/Chong_Nonsi_BTS_station) was moved from the west side of the Silom-Naradhiwas junction on [Si Lom road](/source/Si_Lom_Road) to the middle of [Naradhiwas Rajanagarindra Road](/source/Naradhiwas_Rajanagarindra_Road), in front of Naradhiwas Rajanagarindra Soi 3;

- [S4 station](/source/Saint_Louis_BTS_station) was moved from between Si Lom Soi 19 and Pramuan junction on [Si Lom Road](/source/Si_Lom_Road) to the east side of the Embassy of Myanmar on [Sathorn Road](/source/Sathon_Road). The station was deferred during initial construction and was added as an infill station in 2021;

- A [new station](/source/Surasak_BTS_station) was added 200 metres west of the Sathorn-Surasak Intersection, assuming the S5 station code.

- The southern terminus, [S6 station](/source/Saphan_Taksin_BTS_station), was redesignated as S6. The station was meant to be temporary as it was slated to be demolished upon the completion of a subsequent extension to Thonburi.

### Extensions

#### Wongwian Yai Extension

On 18 October 2005, with no approval from the central government forthcoming, [Bangkok Metropolitan Administration](/source/Bangkok_Metropolitan_Administration) (BMA) decided to fund and complete the 2.2 kilometers (1.4 mi) Silom Line route extension to [Krung Thon Buri](/source/Krung_Thon_Buri_BTS_station) and [Wongwian Yai](/source/Wongwian_Yai_BTS_station) Stations. Construction began on 13 December 2005 with completion originally expected within two years for a late 2007 opening. However, problems with the tendering and installation of a new Bombardier open signalling system repeatedly pushed back the schedule. The extension finally opening on 15 May 2009. However, the single platform [Saphan Taksin station](/source/Saphan_Taksin_BTS_station) which has only one track, has caused repeated delays during rush hour. In 2012, the BMA announced plans to demolish Saphan Taksin station in the future. There are now plans to construct new platforms and remove the bottleneck and keep the station which provides an important link between river boats. The plan includes redesigning the road bridges either side of the viaduct to fit the new station.

#### Bang Wa Extension

The third extension to the network, a 5.3 km (3.3 mi), a four station extension from [Wongwian Yai](/source/Wongwian_Yai_BTS_station) to [Bang Wa](/source/Bang_Wa_station) in [Phasi Charoen District](/source/Phasi_Charoen_district) began construction in the 2nd quarter of 2011, with a deadline of the end of 2012. Only the stations had to be constructed as the viaduct had been completed some years prior. However, construction was delayed for many months by the [Bangkok floods of late 2011](/source/2011_Thailand_floods). It eventually opened in stages. Pho Nimit opened on 12 January 2013, Talat Phlu opened on 14 February 2013, with the last two stations opening on 5 December 2013.[8] The extension was initially operated by a separate six-car shuttle service due to the absence of a turnout between [Wongwian Yai](/source/Wongwian_Yai_BTS_station) and [Talat Phlu](/source/Talat_Phlu_BTS_station) stations. The remaining two stations [Wutthakat](/source/Wutthakat_BTS_Station) and [Bang Wa](/source/Bang_Wa_BTS_Station) were opened on 5 December 2013.

#### Saint Louis station

[Saint Louis station](/source/Saint_Louis_BTS_station) under construction in 2020.

In 2018, it was decided to finally build the missing [Saint Louis station](/source/Saint_Louis_BTS_station) (originally named Sueksa Witthaya), the EIA was finalised in March 2019.[9] Construction of the station began in August 2019 and by the end of 2019 had reached 25% progress.[10] By August 2020, construction had reached 50% but was 30% behind schedule due to COVID related delays.[11] The station was opened on 8 February 2021.[12]

#### Taling Chan Extension *(future)*

After the opening of [Wutthakat](/source/Wutthakat_BTS_station) and [Bang Wa](/source/Bang_Wa_station) stations 5 December 2013, the BMA announced a plan to further extend the Silom Line by 7.5 km (4.7 mi) from [Bang Wa station](/source/Bang_Wa_BTS_Station) to [Taling Chan](/source/Taling_Chan_railway_station), adding six stations. [13] Interchange to the [SRT Light Red line](/source/SRT_Light_Red_Line) would be made possible at [Taling Chan](/source/Taling_Chan_railway_station). A motivation for this northern extension is that the BTS would conveniently connect to the [Southern Bus Terminal](/source/Southern_Bus_Terminal).

A public hearing was held in 2015.[14] Three alignments were studied with construction set to begin in 2017.[15] In October 2018, the BMA Transport and Traffic Office completed an economic evaluation of the extension which found a cost benefit ratio of 2.37.[16] The study recommended that an EIA be completed in 2019 but this was delayed.

The BMA has considered the possibility of a further extension north from [Taling Chan](/source/Taling_Chan) to connect with the [MRT Purple Line](/source/MRT_Purple_Line) at [Rattanathibet Road](/source/Highway_302_(Thailand)). This extension would add seven stations and 10 km (6.2 mi).

Code Name Planned Opening Platform Type Transfer English Thai ↓ Continue from Bang Wa ↓ Bang Waek บางแวก TBA Side Bang Cheauk Nang บางเชือกหนัง Side Bang Phrom บางพรม Side Intharawat อินทราวาส Side Borommaratchachonnani บรมราชชนนี Side Taling Chan ตลิ่งชัน Side Connecting station to • SRT • MRT (future) • SRT Southern Line Bang Kruai บางกรวย TBA Side Rama 5 พระราม 5 Side Thanon Bang Kruai–Sai Noi บางกรวย-ไทรน้อย Side Triam Udom Suksa Pattanakarn School Nonthaburi เตรียมพัฒน์ Side Om Non อ้อมนนท์ Side Bang Rak Noi บางรักน้อย Side Bang Rak Noi It บางรักน้อยท่าอิฐ TBA Side Connecting station to • MRT

#### Yot Se Extension

Silom Line is planned to be extended by two stations west from [National Stadium](/source/National_Stadium_BTS_station) to link with the [SRT Dark Red line](/source/SRT_Dark_Red_Line) at Yot Se station. However, no time frame for this extension has been announced and this section of the [SRT Dark Red Line](/source/SRT_Dark_Red_Line) will not be built until after 2022.

Originally, the plan was to extend the Silom Line west from National Stadium into Chinatown, then north to Democracy Monument where it would then run west to Rattanakosin Island and Sanam Luang, tunnel under the river to the Thonburi side before terminating at Phran Nok. However, this plan was shelved back in 2009 and much of this route has been replaced by alignment changes to the [MRT Orange line](/source/MRT_Orange_Line) which is under construction.

Code Name Planned Opening Platform Type Transfer English Thai ↓ Continue from National Stadium ↓ Yot Se ยศเส TBA Side Connecting station to SRT

## Opening timeline

Date Project Notes 5 December 1999 Bangkok Transit System Full commercial service was commenced from National Stadium to Saphan Taksin stations along with the Sukhumvit Line. 15 May 2009 Wongwian Yai Extension Service extended to Wongwian Yai station. 14 May 2010 Silom Line was closed from 17.00 onwards due to 2010 Thai military crackdown. 29 May 2010 Resumed normal service. 12 January 2013 Bang Wa Extension Shuttle service has been deployed between Wongwian Yai and Pho Nimit stations. with 3+3 car trains. 14 February 2013 Shuttle service extended to Talat Phlu station. 5 December 2013 Full commercial service was commenced from National Stadium to Bang Wa stations. 22 May 2014 Silom Line operated with limited hours from 6:00 to 21:00 due to the curfew, which was a result of the 2014 Thai coup d'état.[17] 28 May 2014 Service hours were extended to 06.00-23.00[18] 14 June 2014 Resumed normal service. 17 October 2020 Silom Line was temporarily closed from 15.00 due to the 2020–2021 Thai protests.[19] 18 October 2020 Chong Nonsi, Surasak, Krung Thon Buri, and Wongwian Yai stations were temporarily closed due to the protests from 14.30[20] 8 February 2021 BTS Saint Louis Extension Saint Louis station was opened between Chong Nonsi and Surasak stations. 28 March 2025 All services were halted because of the 2025 Sagaing earthquake. 29 March 2025 Resumed normal service.[21]

## Stations

Further information: [List of rapid transit stations in Bangkok](/source/List_of_rapid_transit_stations_in_Bangkok)

Code Station Name Image Opened Platform Type Transfers Notes English Thai National Stadium สนามกีฬาแห่งชาติ 5 December 1999; 26 years ago (1999-12-05) Side Siam สยาม Stacked Island Cross-platform interchange with BTS Ratchadamri ราชดำริ Side Sala Daeng ศาลาแดง Side Connecting station to Si Lom for MRT Chong Nonsi ช่องนนทรี Side Connecting station to Sathorn for Bangkok BRT via Chong Nonsi Skywalk Saint Louis เซนต์หลุยส์ 8 February 2021; 5 years ago (2021-02-08) Side Infill station Surasak สุรศักดิ์ 5 December 1999; 26 years ago (1999-12-05) Side Saphan Taksin สะพานตากสิน Side (single) Connecting station to Sathorn Pier for; • Mine Smart Ferry • CHAOPHRAYA EXPRESS The station will be closed for upgrading into a dual-platform configuration Krung Thon Buri กรุงธนบุรี 15 May 2009; 17 years ago (2009-05-15) Side Connecting station to BTS Wongwian Yai วงเวียนใหญ่ Side Connecting station to; • MRT , via 270-metre underground walkway (under construction) • SRT (future) Pho Nimit โพธิ์นิมิตร 12 January 2013; 13 years ago (2013-01-12) Side Talat Phlu ตลาดพลู 14 February 2013; 13 years ago (2013-02-14) Side Connecting station to; • Ratchaphruek station for Bangkok BRT • MRL (south section; future) Wutthakat วุฒากาศ 5 December 2013; 12 years ago (2013-12-05) Side Connecting station to; • Mae Klong Railway (Wongwian Yai - Mahachai) • SRT (future) Bang Wa บางหว้า Side Connecting station to; • MRT • Khlong Phasi Charoen Boat Service

## Rolling stock

Rolling stocks of Silom Line

**EMU-A1** approaching [Sala Daeng station](/source/Sala_Daeng_BTS_Station)

**EMU-A2** approaching [Chong Nonsi station](/source/Chong_Nonsi_BTS_Station)

**EMU-B1/B2** turn around outside of [Bang Wa station](/source/Bang_Wa_BTS_Station)

**EMU-B3** approaching [Bang Wa station](/source/Bang_Wa_BTS_Station)

## Operation

[Saphan Taksin station](/source/Saphan_Taksin_BTS_station) is the only single-platform station in [Bangkok Mass Rapid Transit system](/source/Mass_Rapid_Transit_Master_Plan_in_Bangkok_Metropolitan_Region), causing a bottleneck on the Silom Line. This prevents increasing the train frequency to more than every 3 minutes and 45 seconds.

The Silom Line operates from 06:00 to 00:00 every day with some through-running trains to/from [Mo Chit station](/source/Mo_Chit_BTS_station) on the [Sukhumvit Line](/source/Sukhumvit_Line).

### Headways

Silom Line headway[22] Time Headway (Minutes:Seconds) Monday - Friday 06:00 - 07:00 06:00 07:00 - 09:00 03:45 09:00 - 17:00 06:00 17:00 - 20:00 03:45 20:00 - 22:00 06:00 22:00 - 24:00 08:00 Saturday to Sunday and Public Holiday 06:00 - 09:00 07:00 09:00 - 21:00 05:40 21:00 - 22:00 07:00 22:00 - 24:00 08:00

## Route Map

## Gallery

Panorama View of Royal Bangkok Sports Club from Ratchadamri station.

		- Viaduct of Silom Line at Pathumwan Skywalk.

		- View of Pathumwan Skywalk from [National Stadium station](/source/National_Stadium_BTS_station).

		- View of the viaducts of the Silom Line (left) and the [Sukhumvit Line](/source/Sukhumvit_Line) (right) from [Erawan shrine](/source/Erawan_Shrine).

		- Sala Daeng junction with the viaduct of Silom Line and Thai-Japanese bridge.

		- Linkage point between Silom Line and [MRT Blue Line](/source/Blue_Line_(Bangkok)) at [Sala Daeng station](/source/Sala_Daeng_BTS_station).

		- Chong Nonsi Skywalk, linkage point between Silom Line and [BRT](/source/Bangkok_BRT).

		- Sharp curve before [Chong Nonsi station](/source/Chong_Nonsi_BTS_Station) with Chong Nonsi Skywalk in the background.

		- Construction of [Saint Louis station](/source/Saint_Louis_BTS_station) (formerly known as Sueksa Witthaya station)

		- **EMU-A2** outside of [Saphan Taksin station](/source/Saphan_Taksin_BTS_station).

		- Outside of [Krung Thon Buri station](/source/Krung_Thon_Buri_BTS_station).

		- View of [Sathorn](/source/Sathon_district) [Central Business District](/source/Central_business_district) from [Wongwian Yai station](/source/Wongwian_Yai_BTS_station).

		- **EMU-B1/B2** (left) and **EMU-B3** (right) at [Bang Wa station](/source/Bang_Wa_station).

		- **EMU-B3** turns around outside of [Bang Wa station](/source/Bang_Wa_station).

		- Bang Wa depot. The only depot on the Silom Line

## See also

- [Mass Rapid Transit Master Plan in Bangkok Metropolitan Region](/source/Mass_Rapid_Transit_Master_Plan_in_Bangkok_Metropolitan_Region)

- [BTS Skytrain](/source/BTS_Skytrain)

- [Sukhumvit Line](/source/Sukhumvit_Line)

- [MRT (Bangkok)](/source/MRT_(Bangkok))

- [MRT Blue Line](/source/MRT_Blue_Line)

- [MRT Brown Line](/source/MRT_Brown_Line)

- [MRT Grey Line](/source/MRT_Grey_Line)

- [MRT Light Blue Line](/source/MRT_Light_Blue_Line)

- [MRT Orange Line](/source/MRT_Orange_Line)

- [MRT Pink Line](/source/MRT_Pink_Line)

- [MRT Yellow Line](/source/MRT_Yellow_Line)

- [Airport Rail Link (Bangkok)](/source/Airport_Rail_Link_(Bangkok))

- [SRT Light Red Line](/source/SRT_Light_Red_Line)

- [SRT Dark Red Line](/source/SRT_Dark_Red_Line)

- [Gold Line (Bangkok)](/source/Gold_Line_(Bangkok))

- [Bangkok BRT](/source/Bangkok_BRT)

## References

1. **[^](#cite_ref-1)** [""กรมการขนส่งทางราง" เผยวันศุกร์สิ้นเดือนสิงหาคม 67 มีผู้ใช้บริการรถไฟฟ้าสายฉลองรัชธรรม (สีม่วง) และรถไฟฟ้าสายสีแดง สูงสุดตั้งแต่เปิดให้บริการมา หลังมีนโยบายอัตราค่าโดยสารรถไฟฟ้าสูงสุด 20 บาทตลอดสาย"](https://www.drt.go.th/public-relations/%E0%B8%81%E0%B8%A3%E0%B8%A1%E0%B8%81%E0%B8%B2%E0%B8%A3%E0%B8%82%E0%B8%99%E0%B8%AA%E0%B9%88%E0%B8%87%E0%B8%97%E0%B8%B2%E0%B8%87%E0%B8%A3%E0%B8%B2%E0%B8%87-%E0%B9%80%E0%B8%9C%E0%B8%A2-7). *กรมการขนส่งทางราง กระทรวงคมนาคม* (in Thai). 31 August 2024. Retrieved 4 September 2024.

1. **[^](#cite_ref-2)** ["Mass transit signalling"](https://web.archive.org/web/20220101063113/https://rail.bombardier.com/en/solutions-and-technologies/signalling-and-infrastructure/mass-transit-signalling.html). *Bombardier Transportation*. Archived from [the original](https://rail.bombardier.com/en/solutions-and-technologies/signalling-and-infrastructure/mass-transit-signalling.html#CITYFLO_450) on 1 January 2022. Retrieved 16 June 2020.

1. **[^](#cite_ref-3)** ["Bombardier Projects in Mass-transit signalling"](https://web.archive.org/web/20211123062807/https://rail.bombardier.com/content/dam/transportation/products/mass-transit-signalling/BT_PDF_Mass-transit%20signalling.pdf) (PDF). Archived from [the original](https://rail.bombardier.com/content/dam/transportation/products/mass-transit-signalling/BT_PDF_Mass-transit%20signalling.pdf) (PDF) on 23 November 2021.

1. **[^](#cite_ref-4)** ["รถไฟฟ้าบีทีเอส (BTS Skytrain)"](https://www.bts.co.th/eng/info/info-history.html).

1. **[^](#cite_ref-5)** [รถไฟฟ้าสายสีเขียว มีสถานีอะไรบ้าง วิ่งจากไหนถึงไหน ราคาเท่าไร](https://www.thairath.co.th/lifestyle/home/2702387)

1. **[^](#cite_ref-6)** [โครงการรถไฟฟ้า สายสีเขียวเข้ม (บีทีเอสสายสีลม)](https://www.livingpop.com/bts-darkgreen-silom-line/)

1. **[^](#cite_ref-7)** ["Smart EIA Plus : รายละเอียดรายงาน"](https://eia.onep.go.th/eia/detail?id=6659#:~:text=%E0%B8%A3%E0%B8%B2%E0%B8%A2%E0%B8%A5%E0%B8%B0%E0%B9%80%E0%B8%AD%E0%B8%B5%E0%B8%A2%E0%B8%94%E0%B8%A3%E0%B8%B2%E0%B8%A2%E0%B8%87%E0%B8%B2%E0%B8%99-,%E0%B8%94%E0%B8%B2%E0%B8%A7%E0%B8%99%E0%B9%8C%E0%B9%82%E0%B8%AB%E0%B8%A5%E0%B8%94%E0%B9%84%E0%B8%9F%E0%B8%A5%E0%B9%8C%E0%B8%A3%E0%B8%B2%E0%B8%A2%E0%B8%87%E0%B8%B2%E0%B8%99,-%E0%B9%80%E0%B8%A5%E0%B8%82%E0%B8%97%E0%B8%B5%E0%B9%88%E0%B8%A3%E0%B8%B2%E0%B8%A2%E0%B8%87%E0%B8%B2%E0%B8%99%20:). *eia.onep.go.th*. Retrieved 26 September 2024.

1. **[^](#cite_ref-8)** ["BTS Skytrain starts it's \[*sic*\] new station Pho Nimit today and comimg more near to metro park sathorn"](https://web.archive.org/web/20140101051642/http://metroparksathorn.com/htm/2013/01/12/bts-skytrian-starts-its-new-station-pho-nimit-today-and-comimg-more-near-to-metro-park-sathorn/). *metroparksathorn.com*. 12 January 2013. Archived from [the original](http://metroparksathorn.com/htm/2013/01/12/bts-skytrian-starts-its-new-station-pho-nimit-today-and-comimg-more-near-to-metro-park-sathorn/) on 1 January 2014. Retrieved 26 June 2014.

1. **[^](#cite_ref-9)** ["ไฟเขียว BTS ขึ้นค่าตั๋วส่วนต่อขยาย 16 เมษาฯ เร่งเชื่อม'หมอชิต-เซ็นทรัลลาดพร้าว' สิงหาฯนี้"](https://www.prachachat.net/property/news-296773). *Prachachat*. Bangkok. 4 March 2019.

1. **[^](#cite_ref-10)** ["20 ปีบีทีเอสจาก 35 ขบวนจ่อ 98 ขบวน ปีที่ 21 ของรถไฟฟ้าสายแรกเมืองไทย"](https://www.thairath.co.th/news/local/bangkok/1737215). *Thairath*. Bangkok. 30 December 2019.

1. **[^](#cite_ref-11)** ["บีทีเอส"สร้างครึ่งทางแล้วเปิดต้นปี 64"](https://web.archive.org/web/20001017163352/http://dialynews.com/). *Dailynews*. Bangkok. 25 August 2020. Archived from the original on 17 October 2000.

1. **[^](#cite_ref-12)** ["บีทีเอสเปลี่ยนชื่อสถานี ศึกษาวิทยา เป็น"เซนต์หลุยส์" ตามชื่อโรงพยาบาล-โรงเรียน ในพื้นที่ พร้อมเปิดสถานี ให้บริการประชาชน เดือนก.พ.นี้"](https://www.springnews.co.th/society/805135). *Spring News*.

1. **[^](#cite_ref-rath_13-0)** ["One month free on metro between Taksin and Bang Wa"](http://www.thairath.co.th/content/region/387159). *[Thai Rath](/source/Thai_Rath)*. 4 December 2013. Retrieved 4 September 2014.

1. **[^](#cite_ref-14)** ["BTS Silom Line extension to Taling Chan moves forward"](http://bangkok.coconuts.co/2015/03/05/bts-silom-line-extension-taling-chan-moves-forward). *Coconuts Bangkok*. 5 March 2015. Retrieved 4 December 2016.

1. **[^](#cite_ref-15)** ["Skytrain looks West"](http://www.bangkokpost.com/print/503548/). *www.bangkokpost.com*. Retrieved 4 December 2016.

1. **[^](#cite_ref-16)** ["เกาะติดเมกะโปรเจ็กต์ : รถไฟฟ้าสายสีเขียว (บางหว้า-ตลิ่งชัน) ยกระดับคุณภาพชีวิตด้านการเดินทาง"](https://www.thansettakij.com/content/337505#). *Thansettakij.com*. Bangkok. 25 October 2018.

1. **[^](#cite_ref-17)** ["รถไฟฟ้า BTS-MRT ปิดให้บริการ 3 ทุ่มตั้งแต่คืนนี้ เปิด 6"](https://www.ryt9.com/s/iq01/1903385). *ryt9.com* (in Thai). Retrieved 12 September 2024.

1. **[^](#cite_ref-18)** ["รถไฟฟ้า BTS-MRT ปรับเวลาเดินรถใหม่ 06.00-23.00 น. ตั้งแต่ 28"](https://www.ryt9.com/s/iq02/1906748). *ryt9.com* (in Thai). Retrieved 12 September 2024.

1. **[^](#cite_ref-19)** ["ความเคลื่อนไหวก่อนชุมนุม 17 ตุลา"](https://www.thaipbs.or.th/news/content/297469). *Thai PBS* (in Thai). Retrieved 12 September 2024.

1. **[^](#cite_ref-20)** ["รถไฟฟ้าMRT ปิด 5 สถานี ส่วน BTS ปิด10 สถานี จนกว่าสถานการณ์คลี่คลาย"](https://www.thairath.co.th/news/politic/1955750). *www.thairath.co.th* (in Thai). 18 October 2020. Retrieved 12 September 2024.

1. **[^](#cite_ref-21)** Mail, Pattaya (30 March 2025). ["Daily summary of the earthquake situation; Bangkok's BTS and MRT train services resume"](https://www.pattayamail.com/thailandnews/daily-summary-of-the-earthquake-situation-bangkoks-bts-and-mrt-train-services-resume-495959). *Pattaya Mail*. Retrieved 9 April 2025.

1. **[^](#cite_ref-22)** [https://www.bts.co.th/service/timetable.html](https://www.bts.co.th/service/timetable.html)

## External links

- [Airport Rail Link, BTS, MRT & BRT network map](https://www.bts.co.th/eng/routemap.html)

v t e Bangkok Metropolitan Mass Rapid Transit stations Silom Line National Stadium Siam Ratchadamri Sala Daeng Chong Nonsi Saint Louis Surasak Saphan Taksin Krung Thon Buri Wongwian Yai Pho Nimit Talat Phlu Wutthakat Bang Wa

v t e Public transport systems in Bangkok Metropolitan Region Transport in Bangkok List of rapid transit stations in Bangkok Rail transport in Bangkok Mass Rapid Transit Master Plan in Bangkok Metropolitan Region Railways Inter-city rail and High-speed rail Open State Railway of Thailand Northern Line Northeastern Line Southern Line Eastern Line Maeklong Railway Under construction Eastern HSR (2029) Northeastern HSR (2026) Planned Northern HSR Southern HSR Commuter rail SRT SRT ARL State Railway of Thailand Lopburi Kaeng Khoi Prachinburi Ratchaburi Suphan Buri Rapid transit BTS BTS MRT MRT MRT (under construction, 2028) Monorail MRT MRT MRT (planned) MRL (planned) MRL (planned) People mover BTS Suvarnabhumi APM Don Mueang APM (planned) Light rail and Tram BTS (planned) Trams in Bangkok (defunct) Main stations Krung Thep Aphiwat (Bang Sue) Bangkok (Hua Lamphong) Makkasan Roads Expressways Chaloem Maha Nakhon Si Rat Chalong Rat Burapha Withi Udon Ratthaya Prachim Ratthaya Uttaraphimuk S1 Kanchanaphisek Rama III–Dao Khanong–Western Outer Ring Road (under construction, 2025) Motorways Open () () Under construction (2025) (2025) (2025) Planned National highways () () () () Buses Operators and Routes Bangkok BRT BMTA Thai Smile Bus Bus Line 8 (Bangkok) Terminals Ekkamai Bus Terminal Mo Chit 2 Bus Terminal Old Mo Chit Bus Terminal New Southern Bus Terminal Water transport River Chao Phraya Express Boat OrangeFlag YellowFlag Thai Smile Boat Canals Khlong Saen Saep boat service Khlong Phadung Krung Kasem boat service Khlong Phasi Charoen boat service

v t e Urban rail transit in Southeast Asia Annual Riderships by cities 1 billion or more Singapore 500 million – 999 million Bangkok 100 million – 499 million Jakarta Kuala Lumpur Metro Manila 50 million – 99 million — 10 million – 49 million Hanoi Ho Chi Minh City Bandung Surabaya Yogyakarta (Surakarta) 5 million – 9.9 million Seberang Perai (Ipoh) 1 million – 4.9 million Palembang Cilegon (Serang) Medan Johor Bahru Yangon Padang Indonesia Java Greater Jakarta Integrated Mass Transit System Greater Jakarta Commuter Jakarta MRT M2 2B Jakarta LRT 3 Jabodebek LRT Bogor Grogol Senayan SHIA Skytrain SHIA ARS Merak Commuter Whoosh HSR KCJB Feeder KCJB Greater Bandung Commuter Bandung Walahar Garut Yogyakarta-Solo Commuter Adisumarmo ARS YIA ARS Surakarta Railbus Greater Semarang Commuter Greater Surabaya Commuter Sumatra Aceh Commuter Palembang LRT Kualanamu ARS A Greater Medan Commuter Minangkabau Express Padang Commuter Medan LRT Batang Kuis Lau Cih Cemara Lesser Sunda Islands Bali Urban Subway Cemagi Nusa Dua Sanur Ubud Laos Boten–Vientiane railway Malaysia Peninsular Malaysia Klang Valley Integrated Transit System 1 2 3 4 5 6 7 8 9 10 11 12 13 KLIA Aerotrain KTM ETS KTM Intercity RTS ECR KTM Komuter Northern Sector 1 2 KTM Komuter Southern Sector 1 2 Penang LRT MTL TTL Penang Hill Railway Johor Bahru ART TBL SKL IPL East Malaysia Kota Kinabalu LRT Monorail Kuching ART SM SR DM Myanmar Yangon Circular Railway Mandalay Circular Railway Yangon Urban Mass Rapid Transit Philippines Luzon Greater Capital Region Railway System Manila LRT Line 1 Line 2 Line 6 Manila MRT Line 3 Line 4 Line 5 (cancelled) Line 7 Line 8 Line 9 Line 10 Line 11 Philippine National Railways Metro Commuter NSCR NECL North Main Line South Main Line SkyTrain Visayas Cebu Monorail Cebu Urban Mass Rapid Transit Mindanao Davao People Mover Singapore Singapore MRT NSL EWL NEL CCL DTL TEL JRL CRL Singapore LRT BPLRT SKLRT PGLRT Changi Airport Skytrain Sentosa Express KTM Shuttle Tebrau RTS Thailand Bangkok Metropolitan Mass Rapid Transit Master Plan BTS Silom Sukhumvit Gold MRT Blue Purple Yellow Pink Orange Brown Grey Light Blue Silver Asia Era One ARL Red Lines Light Red Dark Red APM Suvarnabhumi Don Mueang Utapao HSR Eastern Northeastern Northern Southern Provincial Chiang Mai LRT Hat Yai Monorail Khon Kaen LRT Nakhon Ratchasima LRT Pattaya Monorail Phitsanulok Tram Phuket Island LRT Vietnam Hanoi Metro Line 2A Line 3 Ho Chi Minh City Metro 1 Line 1 North-South HSR Note: Under construction & planned lines are in Italics

---
Adapted from the Wikipedia article [Silom Line](https://en.wikipedia.org/wiki/Silom_Line) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Silom_Line?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
