Scomi Urban Transit Rail Application 4-car SUTRA trainsets used by KL Monorail The interior of a SUTRA unit In service 2012– Manufacturer Scomi Rail Built at Rawang Industrial Park Formation 2–8 car sets Capacity 20/139 (seated/standing) per car Operators Rapid KL (Kuala Lumpur) Mumbai Monorail Specifications Train length 2 car: 23.7 m (77 ft 9 in) 4 car: 45.4 m (148 ft 11 in) 6 car: 67 m (219 ft 10 in) Car length 11.2 m (36 ft 9 in) (end cars) 9.5 m (31 ft 2 in) (intermediate cars) Width 3.08 m (10 ft 1 in) (incl. doors) Height 4.72 m (15 ft 6 in) Floor height 2.1 m (6 ft 11 in) Doors 2 pairs per side Wheel diameter 940 mm (37 in) Maximum speed 90 km/h (56 mph) Weight 15 tonnes per car[1] Traction system Variable frequency (IGBT) Acceleration 1.1 m/s2 (3.6 ft/s2) Deceleration 1.1 m/s2 (3.6 ft/s2) (service) 1.3 m/s2 (4.3 ft/s2) (emergency) Electric systems 750 V DC third rail Current collection Contact shoe Braking systems Regenerative and electro-pneumatic

**SUTRA**, abbreviation for **Scomi Urban Transit Rail Application**, is a [monorail](/source/Monorail) [electrical multiple unit](/source/Electrical_multiple_unit) (EMU) type train system designed by Malaysian rail company [Scomi Rail](/source/Scomi_Rail). The design is currently the main product offering of Scomi Rail, which has won several contracts with the design, with the first customer being the [Mumbai Monorail](/source/Mumbai_Monorail) project.

In 2019 Scomi Rail was placed in receivership and it is no longer selling its monorail system.[2]

## Background

In late 2006, Scomi Rail decided to develop its own next generation monorail after gaining experience from the manufacture of the [KL Monorail](/source/KL_Monorail) system. Within twelve months after commencing engineering design, on 26 November 2007, the SUTRA was unveiled by the then Malaysian deputy prime minister [Datuk Seri Najib Tun Razak](/source/Najib_Razak), who described the launch as "a significant milestone".[3]

The total investment expenditure spent by [Scomi Rail](/source/Scomi_Rail) for the SUTRA monorail was about RM35mil including for research, development and factory expansion.[3]

## Design

The SUTRA complies with 50 international standards comprising safety, quality assurance, vehicle certification, reliability, availability and maintainability.[3]

Compared to the previous design used in the [KL Monorail](/source/KL_Monorail), the SUTRA has improved features such as a [composite](/source/Composite_material) body and interior panel, new [bogie](/source/Bogie) system and structure, mass transit components [drive train](/source/Drive_train), improved propulsion and control system, and [regenerative](/source/Regenerative_brake) and [pneumatic brake](/source/Pneumatics) system. The SUTRA is also more energy-efficient due to an improved direct-drive propulsion system and lower vehicle weight. The SUTRA also has a smaller turning radius of 50m[4] and can also handle gradients on a slope of up to six degrees.[5] The SUTRA also features couplings for up to eight cars that have a capacity of 1,050 passengers.[6]

### General

The Scomi SUTRA being manufactured

The SUTRA is a highly customisable design, and is designed to accommodate two to eight cars per set, with capacity ranging from 6,400 [pphpd](/source/Pphpd) in the four-car [KL Monorail](/source/KL_Monorail) to 36,000 in the 5/6-car [Line 17 (São Paulo Metro)](/source/Line_17_(S%C3%A3o_Paulo_Metro)) and [Manaus Monorail](/source/Manaus_Monorail).

The [monocoque](/source/Monocoque) (load-bearing single-shell frame) body structure of the SUTRA is constructed with [aluminium extrusion](/source/Aluminium_extrusion) materials. The lightweight structure combined with the aluminium apron structure provides enhanced strength and durability of up to 30 years.[7]

The SUTRA's propulsion is provided by an [electric motor](/source/Electric_motor) with [gear reducers](/source/Gear_reduction) which draws power from the 750 V DC power line. The motor of the SUTRA is fitted with a [variable-voltage-variable-frequency](/source/Variable-frequency_drive) (VVVF) drive which is fine-tuned for smooth acceleration / deceleration. The VVVF has high torque and duty cycle capabilities, rated at a power of 200 [kW](/source/KW).[7]

The brake system consists of [electro-pneumatic](/source/Electro-pneumatic_brake) systems and [regenerative brakes](/source/Regenerative_brake), providing multiple uses including high integrity [emergency brakes](/source/Emergency_brake_(train)), service brakes, security brakes and parking brakes.[7]

The SUTRA has an automatic [coupling](/source/Railway_coupling) system that can connect up to eight cars together. The coupling system is also capable of towing another SUTRA during emergency connections and is also designed to absorb impact energy in case of accidents.[7]

### Interior

The interior of the SUTRA is customisable, and was designed with the consideration of passenger safety and comfort. It was designed with a minimalist concept with the aim of increased interior space and maximised flow of passengers and minimised obstruction in and around doorways.[7]

[Hand rails](/source/Hand_railing) and [stanchions](/source/Stanchion) are available to assist safe boarding, seating, standing and alighting assistance, including for persons with disabilities.[7] Other safety features include an emergency door release knob and emergency passenger intercom as well as emergency ventilation windows.

The flooring of the SUTRA is slip-resistant and made of [fire-retardant](/source/Fire-retardant) material. Each car has a 40 kW roof-mounted air conditioning unit. Passenger information systems include [LED](/source/LED) texts and television screens in addition to [audio announcements](/source/Public_address_system).[7]

The cabs are equipped with specially designed mass transit seats and two adjacent flippable seats as well as a disabled wheelchair area, which also functions as a standing area when not utilised. Similar to the previous generation Scomi monorails, there are center seats which also function as [bogie](/source/Bogie) covers.[7][8]

### Vehicle management

Driver's cab of the SUTRA with the vehicle management system visible

The vehicle management system (VMS) provides supervised control, monitoring and diagnostic systems for train operators.[7]

Train status information is graphically displayed to the operator via the [HMI](/source/User_interface) panel. The user-friendly interface display allows the operator to quickly respond and understand all train system status.[7]

The train system status and abnormal conditions are categorised and displayed in real time and prioritised in order of critical system hierarchy. As an option, critical data can be logged for further analysis.[7]

The train is equipped with [automatic train protection](/source/Automatic_train_protection) (ATP) system to prevent collisions. The ATP system can be optionally upgraded to an [automatic train operation](/source/Automatic_train_operation) (ATO) system to automate operations of the monorail.[7]

## Users

SUTRA's first user, the [Mumbai Monorail](/source/Mumbai_Monorail)

### Operational

- [KL Monorail](/source/KL_Monorail) – [Kuala Lumpur](/source/Kuala_Lumpur), Malaysia - Quantity: 12 units of 4-car sets on order. Only 6 units delivered. All 6 were taken out of service in May 2017 due to safety reason.[9] - Capacity: 6,400 [pphpd](/source/Pphpd)[10]

- [Mumbai Monorail](/source/Mumbai_Monorail) - [Mumbai](/source/Mumbai), India - Quantity: 16 units of 4-car sets[1] - Capacity: 10,000 [pphpd](/source/Pphpd)[1]

### Contracted

*a contract was signed in 2012 but the project never began construction*

- [Manaus Monorail](/source/Manaus_Monorail) – [Manaus](/source/Manaus), Brazil[11] - Quantity: 10 units of 6-car sets - Capacity: 36,000 [pphpd](/source/Pphpd).[12] On hold.

### Cancelled

- [Line 17 (São Paulo Metro)](/source/Line_17_(S%C3%A3o_Paulo_Metro)) – [São Paulo](/source/S%C3%A3o_Paulo), Brazil[13] Contract with Scomi terminated for non-performance in 2019, awarding to [BYD](/source/BYD_Company) instead.[14] - Quantity: 24 units of 3-car sets upgradeable to 18 units of 5-car sets[15] - Capacity: 36,000 [pphpd](/source/Pphpd)[12]

- [Line 18 (São Paulo Metro)](/source/Line_18_(S%C3%A3o_Paulo_Metro)) – [São Paulo](/source/S%C3%A3o_Paulo), Brazil - Quantity: Unconfirmed number of 5-car sets.[16][17] Line cancelled. - Capacity: 21,000 [pphpd](/source/Pphpd)[12]

## References

1. ^ [***a***](#cite_ref-AutoCarIndia_1-0) [***b***](#cite_ref-AutoCarIndia_1-1) [***c***](#cite_ref-AutoCarIndia_1-2) ["AutoCarIndia"](http://www.autocarindia.com/auto-features/mumbai-monorail-the-future-is-here-371098.aspx/0). Retrieved 15 April 2015.

1. **[^](#cite_ref-2)** ["Scomi Rail placed under receivership"](https://www.thestar.com.my/business/business-news/2019/05/09/scomi-rail-placed-under-receivership/). *The Star*. 9 May 2019. Retrieved 4 July 2021.

1. ^ [***a***](#cite_ref-star1_3-0) [***b***](#cite_ref-star1_3-1) [***c***](#cite_ref-star1_3-2) ["The star"](http://www.thestar.com.my/story/?file=%2F2007%2F11%2F27%2Fnation%2F19585318&sec=nation). Retrieved 15 April 2015.

1. **[^](#cite_ref-4)** ["Specifications for Various Monorail Trains"](https://web.archive.org/web/20150715231255/http://greg-vassilakos.com/monospec/monospec.htm). Archived from [the original](http://greg-vassilakos.com/monospec/monospec.htm) on 15 July 2015. Retrieved 15 July 2015.

1. **[^](#cite_ref-5)** ["Scomi"](http://www.scomigroup.com.my/media/Newsletter/focus19.pdf) (PDF). Retrieved 15 April 2015.

1. **[^](#cite_ref-6)** ["The Star"](http://www.thestar.com.my/story/?file=%2F2012%2F5%2F7%2Fmetrobiz%2F11225685). Retrieved 16 April 2015.

1. ^ [***a***](#cite_ref-brochure_7-0) [***b***](#cite_ref-brochure_7-1) [***c***](#cite_ref-brochure_7-2) [***d***](#cite_ref-brochure_7-3) [***e***](#cite_ref-brochure_7-4) [***f***](#cite_ref-brochure_7-5) [***g***](#cite_ref-brochure_7-6) [***h***](#cite_ref-brochure_7-7) [***i***](#cite_ref-brochure_7-8) [***j***](#cite_ref-brochure_7-9) [***k***](#cite_ref-brochure_7-10) [***l***](#cite_ref-brochure_7-11) ["Scomi Rail brochure"](http://www.scomirail.com.my/pdf/Scomi_Rail_Product_Brochure.pdf) (PDF). Retrieved 15 April 2015.

1. **[^](#cite_ref-8)** ["RailTravelStation"](http://railtravelstation.com/2015/01/05/rapidkl-4-car-monorail/). 5 January 2015. Retrieved 16 April 2015.

1. **[^](#cite_ref-9)** ["Rapid Rail grounds four-car monorail trains for safety reasons"](https://web.archive.org/web/20170607070331/http://www.thestar.com.my/news/nation/2017/06/07/rapid-rail-grounds-four-car-monorail-trains-for-safety-reasons/#TLWIzcTJKCGolD51.99). Archived from [the original](http://www.thestar.com.my/news/nation/2017/06/07/rapid-rail-grounds-four-car-monorail-trains-for-safety-reasons/#TLWIzcTJKCGolD51.99) on 7 June 2017.

1. **[^](#cite_ref-10)** ["The Star"](http://www.thestar.com.my/Business/Business-News/2014/07/19/The-Sao-Paulo-door-opener-Brazilian-project-is-Scomi-Engineerings-muchawaited-breakthrough/?style=biz). Retrieved 15 April 2015.

1. **[^](#cite_ref-11)** [Article title](https://web.archive.org/web/20130816162902/http://www.scomigroup.com/weboffice/files/news/892011_43514PM_SEB_Manaus%20Project_08082011.pdf) *News clipping released by Scomi group*, 6 August 2011, retrieved 30 July 2012

1. ^ [***a***](#cite_ref-pphpd_12-0) [***b***](#cite_ref-pphpd_12-1) [***c***](#cite_ref-pphpd_12-2) ["The Star"](http://www.thestar.com.my/Business/Business-News/2014/07/19/The-Sao-Paulo-door-opener-Brazilian-project-is-Scomi-Engineerings-muchawaited-breakthrough/?style=biz). Retrieved 16 April 2015.

1. **[^](#cite_ref-13)** [Article title](https://web.archive.org/web/20130816164356/http://www.scomigroup.com/weboffice/files/news/672011_32838PM_Microsoft%20Word%20-%20SEB_Brazil%20(papers)%2006.06.pdf) *News clipping released by Scomi group*, 6 June 2011, retrieved 30 July 2012

1. **[^](#cite_ref-14)** ["Metrô rescinde contrato de construção do monotrilho da Linha 17-Ouro"](https://g1.globo.com/sp/sao-paulo/noticia/2019/03/22/metro-rescinde-contrato-de-construcao-do-monotrilho-da-linha-17-ouro.ghtml).

1. **[^](#cite_ref-15)** ["Biblioteca"](http://biblioteca.aeamesp.org.br/smns/19smtf130911T07ap.pdf) (PDF). Retrieved 16 April 2015.

1. **[^](#cite_ref-16)** ["ScomiGroup"](https://web.archive.org/web/20150125012236/http://www.scomigroup.com/weboffice/files/news/7162014_81220AM_MNR_SEB%20Line%2018%2015072014.pdf) (PDF). Archived from the original on 25 January 2015. Retrieved 12 April 2015.

1. **[^](#cite_ref-17)** ["TheSunDaily"](http://www.thesundaily.my/news/1115140). Retrieved 14 April 2015.

v t e Rail transport in Malaysia Overview Fares and ticketing Token Touch 'n Go card KTMB Mobile App Komuter Link Mastercard VISA MyDebit Card Statutory authority Land Public Transport Agency (APAD) Railway Assets Corporation (RAC) Malaysia Rapid Transit Corporation (MRT Corp) Major Operators Keretapi Tanah Melayu Rapid Rail Express Rail Link Sabah State Railway Inter-city rail Main Lines Current KTM West Coast Line KTM East Coast Line Western Sabah Railway Line Future MRL East Coast Rail Link Planned HSR Kuala Lumpur–Singapore high-speed rail Trans-Borneo Railway North Eastern Sabah Railway Line Sarawak Railway Line Services KTM ETS KTM Intercity Sabah State Railway International Express Eastern & Oriental Express Commuter rail Suburban Current KTM Komuter Central 1 Batu Caves–Pulau Sebang Line 2 Tanjung Malim–Port Klang Line Northern 1 Ipoh–Butterworth Line 2 Padang Besar–Butterworth Line Southern 1 Kulai–JB Sentral Line 2 Kempas Baru–Pasir Gudang Line Planned Kita Selangor Rail Line Airport Link Current ERL 6 KLIA Ekspres 7 KLIA Transit KTM Komuter 10 KL Sentral–Terminal Skypark Line Metro rail LRT Current Rapid KL 3 Ampang Line 4 Sri Petaling Line 5 Kelana Jaya Line 11 Shah Alam Line Future LRT Mutiara Line Planned LRT Kota Kinabalu Line MRT Current Rapid KL 9 Kajang Line 12 Putrajaya Line Planned 13 Circle Line Monorail Current 8 KL Monorail Melaka Monorail (suspended) Planned 14 Putrajaya Monorail Kota Kinabalu Monorail Border link Current KTM Intercity (Shuttle Tebrau) Future RTS Johor Bahru–Singapore Rapid Transit System Other rail People mover KLIA Aerotrain Funicular Penang Hill Railway Gondola lift Langkawi Cable Car Genting Skyway Awana Skyway Penang Hill Cable Car Rolling stock & manufacturers Inter-city KTM Class 23 KTM Class 24 KTM Class 25 YDM4 KTM Class 61 DMU KTM Class 91 EMU KTM Class 93 EMU KTM Class 94 EMU Kawasaki diesel locomotives DMU Commuter KTM Class 81 EMU KTM Class 82 EMU KTM Class 83 EMU KTM Class 92 EMU Airport link CNR Changchun ERL "Equator" EMU Siemens Desiro ET 425 M Hyundai Rotem KTM Class 83 EMU LRT CRRC Zhuzhou Articulated LRV "AMY" Bombardier Innovia ART 200/Metro 300 CRRC Zhuzhou LRV MRT Siemens Inspiro "The Guiding Light" Hyundai Rotem EMU Monorail Scomi SUTRA Others Bombardier CX-100 Doppelmayr Garaventa 100-FUL Lugano–Stazione Doppelmayr Garaventa 6-MGD Leitner Ropeways 8-MGD Depots Current KTM Batu Gajah Bukit Mertajam Bukit Tengah Gemas Kempas Baru Klang Padang Besar Port Klang Rawang Sentul Seremban Sabah State Railway Tanjung Aru ERL Salak Tinggi LRT Ampang Kuala Sungai Baru Subang MRT Serdang Sungai Buloh Kajang Monorail Brickfields Aerotrain KLIA MAHB Future Johan Setia (LRT) PSR-A (LRT) Sungai Dua (LRT) Ayer Panas (MRT) Taman Midah (MRT) Related articles 2021 Kelana Jaya LRT collision

---
Adapted from the Wikipedia article [Scomi SUTRA](https://en.wikipedia.org/wiki/Scomi_SUTRA) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Scomi_SUTRA?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.