# Maluri station

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Maluri_station
> Markdown URL: https://mediated.wiki/source/Maluri_station.md
> Source: https://en.wikipedia.org/wiki/Maluri_station
> Source revision: 1357188120
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

Metro station in Kuala Lumpur, Malaysia

AG13 Maluri KG22 Maluri – AEON Entrance to Maluri MRT station General information Other names Malay: مالوري (Jawi) Chinese: 马鲁里 Tamil: மலூரி Location Jalan Cheras, Taman Maluri, Cheras 56000 Kuala Lumpur Malaysia Coordinates 3°7′23.74″N 101°43′37.06″E / 3.1232611°N 101.7269611°E / 3.1232611; 101.7269611 System Rapid KL Owned by Prasarana Malaysia (LRT) MRT Corp (MRT) Operated by Rapid Rail Lines 3 Ampang Line 9 Kajang Line Platforms 2 side platforms (LRT) 1 island platform (MRT) Tracks 2 (LRT) 2 (MRT) Construction Structure type AG13 Elevated KG22 Underground Depth 20 metres[1] Platform levels 2 Parking Available with payment. 250 total parking bays and 50 motorcycle bays. Cycle facilities Not available Accessible Yes Other information Status Operational Station code AG13 KG22 History Opened 16 December 1996; 29 years ago (1996-12-16) (LRT) 17 July 2017; 8 years ago (2017-07-17) (MRT) Services Preceding station Following station Miharja towards Sentul Timur Ampang Line Pandan Jaya towards Ampang Cochrane towards Kwasa Damansara Kajang Line Taman Pertama towards Kajang Location

**Maluri station** is an integrated [light rapid transit](/source/Light_rapid_transit) (LRT) and [mass rapid transit](/source/Mass_rapid_transit) (MRT)[2] located on the eastern fringe of [Cheras](/source/Cheras%2C_Kuala_Lumpur), [Kuala Lumpur](/source/Kuala_Lumpur) near and named after [Taman Maluri](/source/Taman_Maluri), a residential housing estate. The station is located along [Jalan Cheras](/source/Jalan_Cheras) (English: *Cheras Road*, also known as Jalan Cheras Lama or *Old Cheras Road*), near the Jalan Cheras Lama exit of the [Sungai Besi Expressway](/source/Sungai_Besi_Expressway), opposite the [AEON](/source/AEON_(company)) Taman Maluri shopping centre and [Sunway Velocity Mall](/source/Sunway_Velocity_Mall). The [Kerayong River](/source/Kerayong_River) also runs beside the station.

The station consists of an elevated station served by the [LRT Ampang Line](/source/LRT_Ampang_Line) (formerly known as STAR LRT) which was opened in 1996, and the underground station served by the [MRT Kajang Line](/source/MRT_Kajang_Line) which was opened on 17 July 2017. Both stations are connected via a paid-area-to-paid-area elevated pedestrian linkway.

Under the [station naming rights programme](/source/Prasarana_Malaysia#Station_naming_rights_program), the MRT station is currently known as **Maluri–AEON MRT station**.[3]

## Station Background

### Colonial era

During [British colonial era](/source/British_Malaya) and until the 1980s, the site of the present-day Maluri station was a [halt](/source/Railway_halt) on the [Keretapi Tanah Melayu](/source/Keretapi_Tanah_Melayu) (KTM) network called Pudoh Ulu or Pudu Ulu.[4]

The MRT station's Entrance B (left) and Entrance D (right) on either side of Jalan Cheras.

### LRT station

The older elevated station serves the [LRT Ampang Line](/source/LRT_Ampang_Line), which is built according to the standard design of the Ampang Line elevated stations.

It consists of two side platforms flanking the double elevated tracks, above a concourse level where the fare gates are located. Both platforms can be reached from the concourse level via [stairways](/source/Stairway), [escalators](/source/Escalator) and [elevators](/source/Elevator). The elevators were a recent addition to the station, and hence, the station was not disabled-friendly until they were installed in 2015.

### MRT station

The MRT station is one of the seven underground stations of the [MRT Kajang Line](/source/MRT_Kajang_Line). The underground station is built directly beneath Jalan Cheras. The station has two underground levels - a concourse level with fare gates, a customer service office, toilets and machinery rooms - and an [island platform](/source/Island_platform) below.

The theme given for the design of the station is "New Generation" and features colourful panels on the exterior and interior walls of the station.[5][6]

The MRT station is the last underground station before the line resurfaces and heads towards [Kajang](/source/Kajang_MRT_station).

### LRT-MRT Linkway

The Maluri station comprises two separate station buildings which are connected via an elevated linkway. An elevated linkway connecting the paid areas of both the LRT and MRT stations allows commuters to transfer seamlessly between the LRT Ampang Line and the MRT Kajang Line at this station.

The linkway was built together with the MRT station. It connects the LRT station at the paid area of the concourse level, and connects directly to Entrance C of the MRT station at the ground level. From Entrance C, escalators, a lift and a staircase go directly down to the paid area of the underground concourse level.

As the linkway is part of the paid area of both stations, there are no direct exits to/from the outside. Unlike the MRT station, the linkway is not air-conditioned.

## History

A platform view of the Maluri LRT station towards [Miharja](/source/Miharja_LRT_station) station

The LRT platforms

### KTM Ampang branch line

The alignment of the [LRT Ampang Line](/source/LRT_Ampang_Line) at this location uses the alignment of the old [Federated Malay States Railways](/source/Federated_Malay_States_Railways) (FMSR) tracks which ran from Ampang Junction, where the Ampang branch line left the main [West Coast Line](/source/KTM_West_Coast_railway_line) (between today's [Chan Sow Lin](/source/Chan_Sow_Lin_LRT_station) and [Miharja](/source/Miharja_LRT_station) stations) to head to the terminus of the branch line at [Ampang](/source/Ampang_Jaya) town (where today's Ampang Line depot and [Ampang](/source/Ampang_LRT_station) station, the terminus of the [LRT Ampang Line](/source/LRT_Ampang_Line) is located).

This branch line was opened on 1 May 1914 and was mostly to cater to the tin mines in the Ampang area. However, no railway station is known to have existed at this location during this period.

The tracks crossed Jalan Cheras as a level crossing until the alignment was converted to an elevated rail line for the construction of the LRT in the 1990s where a railway bridge was built over the road.

### LRT Ampang Line

The LRT station was constructed as part of the development of the former STAR LRT project in the 1990s. It was completed and opened together with the line on 16 December 1996, along with 13 other stations between the [Sultan Ismail](/source/Sultan_Ismail_LRT_station) and the [Ampang](/source/Ampang_LRT_station).

The line was the first LRT line to be operational in Malaysia.

### MRT Kajang Line

Construction of the underground MRT station began in 2012 following the official launch of the construction of the MRT Kajang Line. Since the station is located beneath Jalan Cheras, various diversions of the road had to be carried out throughout the construction of the station. Decking above the work site was also erected to enable traffic to run while station box excavation and other construction work proceeded underneath.

The station was opened on 17 July 2017 together with the opening of Phase Two of the MRT line from [Muzium Negara](/source/Muzium_Negara_MRT_station) to [Kajang](/source/Kajang_MRT_station).

## Bus Services

### MRT Feeder Bus Services

There are no MRT feeder bus services that start or end at this station. However, the station is served by other MRT feeder bus services from other stations.

Route No. Origin Destination Via Notes T352[7] (As a pass-by) Taman Shamelin Perkasa KG21 Cochrane Jalan Perdana Utama Pandan Perdana Jalan Indah Taman Cheras Indah Sungai Besi Expressway (Pandan Indah Link) AG14 Pandan Jaya Menara PGRM Jalan Cheras AG13 KG22 Maluri (Entrance B) Jalan Shelley Jalan Cochrane Jalan Tun Razak AG13 KG22 Maluri (Entrance D) For KG21 Cochrane bound, the bus will stop at the bus stops near Entrance B / LRT Entrance. For Taman Shamelin Perkasa / Bandar Tun Razak / Bandar Sri Permaisuri bound, the bus will stop at the bus stop near Entrance D. T400[8] KG21 Cochrane Bandar Tun Razak Jalan Tun Razak Jalan Cheras AG13 KG22 Maluri (Entrance D) Stadium Badminton Cheras Jalan Yaacob Latif Velodrom Kuala Lumpur FT 1 Cheras Highway (Jalan Cheras) Hospital Canselor Tuanku Muhriz UKM (HCTM) Taman Midah Bandar Tun Razak Jalan Budiman AG13 KG22 Maluri (Entrance B) Jalan Shelley T401[9] KG21 Cochrane Bandar Sri Permaisuri Jalan Tun Razak Jalan Cheras AG13 KG22 Maluri (Entrance D) Stadium Badminton Cheras Flat Sri Sabah Jalan Ikan Emas Jalan Sekilau Flat Sri Melaka Taman Sri Permaisuri Bandar Sri Permaisuri Jalan Jellawat 1 SP12 Cheras AG13 KG22 Maluri (Entrance B) Jalan Shelley

### Other Bus Services

The Maluri station also provides accessibility for some other bus services.

Route No. Operator Origin Destination Via Notes 450[10] Rapid KL Hentian Kajang Hub Lebuh Pudu Reko Sentral Bandar Kajang KG34 Stadium Kajang KG33 Sungai Jernih Sungai Sekamat Simpang Balak KG31 Bukit Dukung Cheras–Kajang Expressway Jalan Hulu Langat Batu 9 Cheras / Taman Suntex Cheras Sentral / KG26 Taman Connaught FT 1 Cheras Highway (Jalan Cheras) KG24 Taman Midah AG13 KG22 Maluri Jalan Cheras Jalan Pasar Jalan Pudu For KL-bound, the bus will stop at the bus stop near the LRT Entrance. For Kajang / Damai Perdana bound, the bus will stop at the bus stop near Entrance D. 400[11] Rapid KL Damai Perdana Hub Lebuh Pudu Taman Desa Baiduri Alam Damai Jalan Cheras FT 1 Cheras Highway (Jalan Cheras) KG24 Taman Midah AG13 KG22 Maluri Jalan Pudu Berjaya Times Square / MR5 Imbi MR6 Bukit Bintang KG18A Bukit Bintang Jalan Raja Chulan Jalan Tun H.S. Lee 402[12] Rapid KL AG13 KG22 Maluri (Entrance D) Pekeliling Bus Hub AG3 SP3 MR11 PY13 CC09 Titiwangsa Jalan Cheras FT 1 Cheras Highway (Jalan Cheras) Stadium Badminton Cheras Flat Sri Sabah AG13 KG22 Maluri (LRT Entrance) Jalan Tun Razak Masjid Jamek Alam Shah Istana Terengganu KJ9 Ampang Park KLCC National Heart Institute (IJN) Istana Budaya Kuala Lumpur Hospital The bus technically starts from Entrance D. However, passengers can take the bus from the LRT entrance as an alternative.

## Nearby

- AEON Taman Maluri Shopping Centre

- [Sunway Velocity Mall](/source/Sunway_Velocity_Mall)

- [Rapid Bus](/source/Rapid_Bus) Maluri Depot

- Cheras District Police Headquarters (IPD Cheras)

## Gallery

### LRT Station

		- The tracks as seen from the station, heading towards [Pandan Jaya LRT station](/source/Pandan_Jaya_LRT_station)

		- The bus hub at Maluri LRT, as taken in January 2006

		- The Maluri LRT station from the exterior, as taken in 2007

### MRT Station

		- The platform level in the Maluri MRT station. The space is almost twice as wide as [Masjid Jamek](/source/Masjid_Jamek_LRT_station)'s platform level

		- View of the platform level

		- Entrance B with the Sunway Velocity Shopping Complex in the background

		- Covered walkway leading to the Sunway Velocity Shopping Complex from Entrance B

### LRT-MRT Linkway

		- View of the LRT to MRT linkway at Maluri Station

		- Entrance C (right) of the Maluri MRT Station which leads to the linkway (left)

		- Escalators at concourse paid area to the linkway

		- External view of the LRT-MRT linkway entering the MRT station

## See also

- [Maluri](/source/Maluri)

## References

1. **[^](#cite_ref-1)** Tan, Yean-Chin; Koo, Kuan-Seng; Chow, Chee-Meng (2016). ["Underground stations excavation of up to 45m deep for mass rapid transit in limestone formation, Malaysia"](https://www.jstage.jst.go.jp/article/jgssp/2/2/2_MYS-03/_pdf/-char/en). *Japanese Geotechnical Society Special Publication*. **2** (2): 170–175. [doi](/source/Doi_(identifier)):[10.3208/jgssp.MYS-03](https://doi.org/10.3208%2Fjgssp.MYS-03). Retrieved 1 June 2026.

1. **[^](#cite_ref-2)** ["SBK Line Full Opening Boosts Coverage of Kuala Lumpur's Urban Rail Network"](https://web.archive.org/web/20170809033044/http://www.mymrt.com.my/cms/upload_files/mediarelease/mediarelease_download_001023.pdf) (PDF). Mass Rapid Transit Corporation Sdn Bhd. Archived from [the original](http://www.mymrt.com.my/cms/upload_files/mediarelease/mediarelease_download_001023.pdf) (PDF) on 9 August 2017. Retrieved 13 August 2017.

1. **[^](#cite_ref-3)** ["Four Stations to Kick Off MRT Corp's Station Naming Rights Programme"](https://web.archive.org/web/20170904202330/http://www.mymrt.com.my/cms/upload_files/mediarelease/mediarelease_download_001022.pdf) (PDF). Mass Rapid Transit Corporation Sdn Bhd. Archived from [the original](http://www.mymrt.com.my/cms/upload_files/mediarelease/mediarelease_download_001022.pdf) (PDF) on 4 September 2017. Retrieved 4 September 2017.

1. **[^](#cite_ref-4)** ["Map of British Malaya : including the Straits Settlements, Federated Malay States, and Malay states not included in the federation"](https://searchworks.stanford.edu/view/12092791). Retrieved 3 January 2022.

1. **[^](#cite_ref-5)** Choong, Meng Yew (9 July 2017). ["Seven hidden gems of the MRT"](https://web.archive.org/web/20170709043925/https://www.thestar.com.my/news/nation/2017/07/09/seven-hidden-gems-of-the-mrt-a-new-mrt-train-service-will-pull-in-on-july-17-signalling-the-start-of/). *The Star Online*. Archived from [the original](https://www.thestar.com.my/news/nation/2017/07/09/seven-hidden-gems-of-the-mrt-a-new-mrt-train-service-will-pull-in-on-july-17-signalling-the-start-of/) on 9 July 2017. Retrieved 1 June 2026.

1. **[^](#cite_ref-6)** ["MRT stations designed to tell the story of M'sia"](http://www.thestar.com.my/metro/community/2017/08/03/learn-nations-history-from-ground-up-inspired-by-the-gombak-quartz-ridge-mrts-underground-stations-a/). *The Star*. 3 August 2017. Retrieved 4 September 2017.

1. **[^](#cite_ref-7)** ["Maluri MRT Feeder Bus T352 | mrt.com.my"](http://mrt.com.my/feeder_bus/t352.htm). *mrt.com.my*. Retrieved 20 January 2021.

1. **[^](#cite_ref-8)** ["Cochrane MRT Feeder Bus T400 | mrt.com.my"](http://mrt.com.my/feeder_bus/t400.htm). *mrt.com.my*. Retrieved 20 January 2021.

1. **[^](#cite_ref-9)** ["Cochrane MRT Feeder Bus T401 | mrt.com.my"](http://mrt.com.my/feeder_bus/t401.htm). *mrt.com.my*. Retrieved 20 January 2021.

1. **[^](#cite_ref-10)** ["Line Route 450 - rapidKL Bus - Bus Schedules"](https://moovitapp.com//kuala_lumpur-1082/lines/450/26193842/en). *Moovit*. Retrieved 31 December 2020.

1. **[^](#cite_ref-11)** ["Line Route 400 - rapidKL Bus - Bus Schedules"](https://moovitapp.com//kuala_lumpur-1082/lines/400/26194010/en). *Moovit*. Retrieved 13 January 2021.

1. **[^](#cite_ref-12)** ["402 Route: Time Schedules, Stops & Maps - Hab Titiwangsa"](https://moovitapp.com/index/en/public_transit-line-402-Kuala_Lumpur-1082-1775731-26193916-0). *moovitapp.com*. Retrieved 20 January 2021.

## External links

- [Kuala Lumpur MRT Integration website](https://web.archive.org/web/20110309045909/http://www.mrt.com.my/)

- [Maluri MRT station at official website](https://www.mymrt.com.my/public/sg-buloh-kajang-sbk-line/stations/maluri/)

v t e Greater KL/Klang Valley Area rail transit stations 1 2 3 4 5 6 7 8 9 10 11 12 13 B1 1 Batu Caves–Pulau Sebang Line Batu Caves Taman Wahyu Kampung Batu Batu Kentonmen Sentul Putra Bank Negara Kuala Lumpur KL Sentral Mid Valley Seputeh Bandar Malaysia Selatan (planned) Salak Selatan Bandar Tasik Selatan Maju KL (planned) Serdang Kajang Kajang 2 UKM Bangi Batang Benar Nilai Labu Tiroi Seremban Senawang Sungai Gadut Rembau Pulau Sebang/Tampin 2 Tanjung Malim–Port Klang Line Tanjung Malim Kuala Kubu Bharu Rasa Batang Kali Serendah Rawang Kuang Sungai Buloh Kepong Sentral Kepong Segambut Utara Segambut Putra Bank Negara Kuala Lumpur KL Sentral Abdullah Hukum Angkasapuri Pantai Dalam Petaling Jalan Templer Kampung Dato Harun Seri Setia Setia Jaya Subang Jaya Batu Tiga Shah Alam Padang Jawa Bukit Badak Klang Teluk Pulai Teluk Gadong Kampung Raja Uda Jalan Kastam Port Klang 3 Ampang Line Sentul Timur Sentul Titiwangsa PWTC Sultan Ismail Bandaraya–UOB Masjid Jamek Plaza Rakyat BBCC–Hang Tuah Pudu Chan Sow Lin Miharja Maluri Pandan Jaya Pandan Indah Cempaka Cahaya Ampang 4 Sri Petaling Line Sentul Timur Sentul Titiwangsa PWTC Sultan Ismail Bandaraya–UOB Masjid Jamek Plaza Rakyat BBCC–Hang Tuah Pudu Chan Sow Lin Cheras Salak Selatan Bandar Tun Razak Bandar Tasik Selatan Sungai Besi Bukit Jalil Sri Petaling Awan Besar Muhibbah Alam Sutera Kinrara BK 5 Kinrara BK 3 (planned) IOI Puchong Jaya Pusat Bandar Puchong Taman Perindustrian Puchong Bandar Puteri Puchong Perdana Puchong Prima Kampung Sri Aman (planned) Putra Heights 5 Kelana Jaya Line Gombak Taman Melati Wangsa Maju Sri Rampai Setiawangsa Jelatek Dato' Keramat Damai Ampang Park KLCC Kampung Baru–Co-opbank Pertama Dang Wangi Masjid Jamek Pasar Seni KL Sentral–redONE Bank Rakyat–Bangsar Abdullah Hukum Kerinchi Universiti Taman Jaya Asia Jaya Taman Paramount Taman Bahagia Kelana Jaya Lembah Subang Ara Damansara Glenmarie Subang Jaya SS15 SS18 USJ 7 Taipan Wawasan USJ 21 Alam Megah Subang Alam Putra Heights 6 KLIA Ekspres KL Sentral KLIA T1 KLIA T2 7 KLIA Transit KL Sentral Bandar Malaysia Selatan Bandar Tasik Selatan Putrajaya & Cyberjaya Salak Tinggi KLIA T1 KLIA T2 8 KL Monorail KL Sentral (Monorail) Tun Sambanthan Maharajalela BBCC–Hang Tuah Imbi Bukit Bintang Raja Chulan Bukit Nanas Medan Tuanku Chow Kit Titiwangsa 9 Kajang Line Kwasa Damansara Kwasa Sentral Kota Damansara–Thomson Hospital Surian–IOI Mall Damasnara Mutiara Damansara Bandar Utama Taman Tun Dr Ismail–Deloitte (TTDI) Phileo Damansara Bukit Kiara Selatan (planned) Pavilion Damansara Heights–Pusat Bandar Damansara Semantan Muzium Negara Pasar Seni Merdeka Pavilion Kuala Lumpur–Bukit Bintang Tun Razak Exchange (TRX) Cochrane AEON–Maluri Taman Pertama Taman Midah Taman Mutiara Taman Connaught Taman Suntex Sri Raya Bandar Tun Hussein Onn Batu 11 Cheras Bukit Dukung Sungai Jernih Stadium Kajang Kajang 10 KL Sentral–Terminal Skypark Line KL Sentral Subang Jaya Glenmarie (planned) Sri Subang (planned) Terminal Skypark 11 Shah Alam Line Bandar Utama Kayu Ara BU 11 Tropicana (future) Damansara Idaman Subang Glenmarie 2 Temasya (future) Kerjaya Stadium Shah Alam Dato' Menteri Raja Muda (future) UiTM Shah Alam Seksyen 7 Shah Alam Bukit Raja Selatan (future) Bandar Baru Klang Pasar Klang Jalan Meru Jambatan Kota Taman Selatan Seri Andalas Klang Jaya Bandar Bukit Tinggi Bandar Botanik (future) Johan Setia 12 Putrajaya Line Kwasa Damansara Rubber Research Institute (planned) Kampung Selamat Sungai Buloh Damansara Damai Sri Damansara Barat Sri Damansara Sentral Sri Damansara Timur Metro Prima Kepong Baru Jinjang Sri Delima Kampung Batu Kentonmen Jalan Ipoh Sentul Barat Titiwangsa Hospital Kuala Lumpur Raja Uda Ampang Park Persiaran KLCC Conlay–Kompleks Kraf Tun Razak Exchange (TRX) Chan Sow Lin Bandar Malaysia Utara (planned) Bandar Malaysia Selatan (planned) Kuchai Taman Naga Emas Sungai Besi Taman Teknologi MRT (planned) Serdang Raya Utara Serdang Raya Selatan Serdang Jaya UPM Taman Universiti (planned) Taman Equine Putra Permai 16 Sierra Cyberjaya Utara–Finexus Cyberjaya City Centre Putrajaya Sentral 13 Circle Line Opening 2032 Bukit Kiara Selatan Bukit Kiara Sri Hartamas Bukit Segambut Taman Sri Sinar Dutamas Provisional Station 1 Provisional Station 2 Titiwangsa Kampung Puah Jalan Langkawi Danau Kota Setapak Rejang Setiawangsa AU2 Taman Hillview (provisional) Tasik Ampang Kampung Pandan Pandan Indah Taman Kencana Taman Midah Jalan Yaacob Latif Sri Permaisuri Salak Selatan Salak Jaya Kuchai Jalan Klang Lama Pantai Dalam Pantai Permai Universiti UM B1 BRT Sunway Line Sunway-Setia Jaya Mentari Sunway Lagoon SunMed SunU-Monash South Quay-USJ 1 USJ 7 Stations and services in italics are planned or under construction

---
Adapted from the Wikipedia article [Maluri station](https://en.wikipedia.org/wiki/Maluri_station) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Maluri_station?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
