# Kita Selangor Rail Line

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Kita_Selangor_Rail_Line
> Markdown URL: https://mediated.wiki/source/Kita_Selangor_Rail_Line.md
> Source: https://en.wikipedia.org/wiki/Kita_Selangor_Rail_Line
> Source revision: 1357061799
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

Rail line in Selangor , Negeri Sembilan

Kita Selangor Rail Line Overview Other name(s) Jajaran Rel Selangor, Selangor Rail Network[1] Native name Jajaran Rel Kita Selangor Status Proposed Locale Selangor Negeri Sembilan Service Type Commuter rail Rail freight transport Depot Unknown History Planned opening TBD Technical Line length 211 km (131 mi) Track gauge TBD Operating speed 160 km/h

**Kita Selangor Rail Line** (Malay: *Jajaran Rel Kita Selangor*[2]) is a proposed mixed-use rail network in the state of [Selangor](/source/Selangor), Malaysia.[3] The planned rail line aims to improve rail connectivity across the state, especially within the northern and western regions of Selangor, and to complement the existing rail transport network in [Greater Kuala Lumpur](/source/Transport_in_Greater_Kuala_Lumpur).[3][4][5] Construction is expected to be implemented in multiple phases over a ten-year span.[4][6]

## History

### Proposal

The proposal for the line was first outlined as part of the state government's long-term transport strategy and included in the Selangor [Pakatan Harapan](/source/Pakatan_Harapan)'s election manifesto before the [2023 Selangor state election](/source/2023_Selangor_state_election).[7] Early plans focused on providing a rail connection between [Klang](/source/Klang%2C_Selangor) and northern Selangor districts such as [Kuala Selangor](/source/Kuala_Selangor) and [Sabak Bernam](/source/Sabak_Bernam), areas which are not directly served by existing urban rail services.[3][8][9]

During the tabling of the 2024 Selangor State Budget, the project was formally announced under the name *Kita Selangor Rail*, with RM3 million allocated to conduct a feasibility study.[4][10]

### Review

In July 2025, the project was reported to be in the feasibility study stage. Tentatively, the project is to be divided into two phases; with the first spanning from [Labu](/source/Labu%2C_Negeri_Sembilan) in Negeri Sembilan to [Puncak Alam](/source/Puncak_Alam), while the second phase from Puncak Alam to Sabak Bernam.[7] The initial proposal had already been presented to the [Ministry of Transport](/source/Ministry_of_Transport_(Malaysia)) who welcomed the proposal.

[Prasarana](/source/Prasarana_Malaysia) expressed its readiness to provide technical expertise for the project, citing its extensive experience in rail operations domestically and abroad.[11]

## Overview

### Route

According to the feasibility studies, the proposed rail line would have a total length of approximately 211 kilometres. The main alignment is planned to span [Sabak Bernam](/source/Sabak_Bernam_District) in the northwest of Selangor, passing through [Sepang](/source/Sepang), and extending southwards towards [Negeri Sembilan](/source/Negeri_Sembilan).[10] Several spur lines have been proposed to connect strategic locations including Westport, [Klang](/source/Klang_(city)), [Putra Heights](/source/Putra_Heights), and Universiti Selangor (UNISEL) in [Bestari Jaya](/source/Bestari_Jaya).[10] The proposed rail line is expected to provide a direct connection to major industrial and transportation hubs such as the planned Selangor Aero Park, [Kuala Lumpur International Airport (KLIA)](/source/Kuala_Lumpur_International_Airport), [Subang Airport](/source/Sultan_Abdul_Aziz_Shah_Airport), [Port Klang](/source/Port_Klang) and [Carey Island](/source/Carey_Island).[4][5][12][13]

The project is also intended to integrate with existing and future rail infrastructure, including a potential connection with the [East Coast Rail Link](/source/East_Coast_Rail_Link) (ECRL), to enhance inter-regional connectivity within Peninsular Malaysia.[9][14][15][16]

### Service

The Kita Selangor Rail Line is envisioned as a mixed-use rail line capable of carrying both passengers and freight. The trains are expected to significantly shorten travel times compared to road transport. State officials have indicated that the line could support logistics movements between ports, airports and industrial zones, in addition to daily commuter travel.[5][14][15]

The trains are planned to reach up to 160 km/h, hence potentially shortening travel from northernmost end of the line Sabak Bernam to Kuala Lumpur International Airport (KLIA) from two hours and 41 minutes (by car) to one hour and 42 minutes (by rail).[17]

## See also

- [Transport in Selangor](/source/Transport_in_Greater_Kuala_Lumpur)

- [Rail transport in Malaysia](/source/Rail_transport_in_Malaysia)

- [East Coast Rail Link](/source/East_Coast_Rail_Link)

## References

1. **[^](#cite_ref-1)** Team, Media Selangor (2026-05-26). ["Selangor boosts rail industry with focus on infrastructure, local talent"](https://www.mediaselangor.com/en/2026/05/372386). *Media Selangor*. Retrieved 2026-05-31.

1. **[^](#cite_ref-2)** ["Pembangunan Jajaran Rel Kita Selangor Masuk Fasa Teroka Strategi Pembiayaan - Amirudin"](https://www.bernama.com/bm/news.php?id=2451285). *BERNAMA* (in Malay). 2025-07-30. Retrieved 2026-01-17.

1. ^ [***a***](#cite_ref-BusinessToday2023_3-0) [***b***](#cite_ref-BusinessToday2023_3-1) [***c***](#cite_ref-BusinessToday2023_3-2) ["Plans for rail line from Klang to Kuala Selangor to be proposed"](https://www.businesstoday.com.my/2023/08/05/plans-for-rail-line-from-klang-to-kuala-selangor-to-be-proposed/). *Business Today*. 2023-08-05. Retrieved 2026-01-18.

1. ^ [***a***](#cite_ref-Bernama2025_4-0) [***b***](#cite_ref-Bernama2025_4-1) [***c***](#cite_ref-Bernama2025_4-2) [***d***](#cite_ref-Bernama2025_4-3) ["Kita Selangor Rail Project Enters Strategic Financing And Investment Phase"](https://www.bernama.com/en/general/news.php?id=2451298). *Bernama*. 2025-07-30.

1. ^ [***a***](#cite_ref-NSTAero_5-0) [***b***](#cite_ref-NSTAero_5-1) [***c***](#cite_ref-NSTAero_5-2) ["Amirudin moots Selangor rail project to boost aerospace development"](https://www.nst.com.my/news/nation/2025/06/1226386/amirudin-moots-selangor-rail-project-boost-aerospace-development). *New Straits Times*. 2025.

1. **[^](#cite_ref-6)** Noh, Norzamira Che (2025-02-19). ["Jajaran Rel Selangor akan dibina secara berperingkat, dijangka ambil masa 10 tahun"](https://www.bharian.com.my/berita/nasional/2025/02/1363197/jajaran-rel-selangor-akan-dibina-secara-berperingkat-dijangka-ambil). *Berita Harian*. Retrieved 2026-01-17.

1. ^ [***a***](#cite_ref-:0_7-0) [***b***](#cite_ref-:0_7-1) ["Kita Selangor Rail feasibility study underway, state assembly hears"](https://mediaselangor.com/en/2025/07/293361). *Media Selangor*. 2025-07-10. Retrieved 2026-01-17.

1. **[^](#cite_ref-8)** ["Construction Of Rail Line Proposed For Klang – Sabak Bernam, Selangor Govt - BusinessToday"](https://www.businesstoday.com.my/2023/06/04/construction-of-rail-line-proposed-for-klang-sabak-bernam-selangor-govt/). *BusinessToday*. 2023-06-04. Retrieved 2026-01-17.

1. ^ [***a***](#cite_ref-BusinessTodayECRL_9-0) [***b***](#cite_ref-BusinessTodayECRL_9-1) ["Selangor plans to connect its proposed rail line with ECRL"](https://www.businesstoday.com.my/2024/10/29/selangor-plans-to-connect-its-own-proposed-rail-line-with-ecrl/). *Business Today*. 29 October 2024.

1. ^ [***a***](#cite_ref-:1_10-0) [***b***](#cite_ref-:1_10-1) [***c***](#cite_ref-:1_10-2) BERNAMA (2024-11-15). ["Budget: Selangor Identifies Main Alignment For Kita Selangor Rail Project"](https://www.bernama.com/en/news.php?id=2363744). *BERNAMA*. Retrieved 2026-01-17.

1. **[^](#cite_ref-11)** ["Perkembangan pengoperasian LRT3 dimaklumkan sekitar Januari 2026"](https://www.astroawani.com/berita-malaysia/perkembangan-pengoperasian-lrt3-dimaklumkan-sekitar-januari-2026-553478). *Astro Awani* (in Malay). 2025-12-29. Retrieved 2026-01-18.

1. **[^](#cite_ref-BernamaAlignment_12-0)** ["Kita Selangor Rail Project Enters Strategic Financing And investment Phase"](https://www.bernama.com/en/news.php?id=2451298). *Bernama*. 2025-07-30.

1. **[^](#cite_ref-13)** Keadilan, Suara (2025-07-02). ["MB: 'Kita Selangor Rail' bakal perkukuh jaringan rel Lembah Klang"](https://www.suarakeadilan.my/post/mb-kita-selangor-rail-bakal-perkukuh-jaringan-rel-lembah-klang). *Suara Keadilan*. Retrieved 2026-01-17.

1. ^ [***a***](#cite_ref-BusinessToday2024_14-0) [***b***](#cite_ref-BusinessToday2024_14-1) ["Proposed new rail line could transform northern Selangor towns"](https://www.businesstoday.com.my/2024/07/08/proposed-new-rail-line-could-transform-northern-selangor-towns/). *Business Today*. 8 July 2024.

1. ^ [***a***](#cite_ref-:2_15-0) [***b***](#cite_ref-:2_15-1) Priya, Sheila Sri (2025-02-20). ["Selangor Kita Rail Line completion expected in 10 years"](https://www.thestar.com.my/metro/metro-news/2025/02/20/selangor-kita-rail-line-completion-expected-in-10-years). *The Star*. Retrieved 2026-01-17.

1. **[^](#cite_ref-16)** Clark, James (2025-02-20). ["Selangor Rail Line: proposed railway along the North Selangor coast"](https://futuresoutheastasia.com/selangor-rail-line/). *futuresoutheastasia.com*. Retrieved 2026-01-18.

1. **[^](#cite_ref-17)** ["Selangor Rail Line to roll out in phases over 10 years, state assembly told"](https://www.thestar.com.my/metro/metro-news/2025/02/19/selangor-rail-line-to-roll-out-in-phases-over-10-years-state-assembly-told). *The Star*. 2025-02-19. Retrieved 2026-01-18.

v t e Rail transport in Malaysia Overview Fares and ticketing Token Touch 'n Go card KTMB Mobile App Komuter Link Mastercard VISA MyDebit Card Statutory authority Land Public Transport Agency (APAD) Railway Assets Corporation (RAC) Malaysia Rapid Transit Corporation (MRT Corp) Major Operators Keretapi Tanah Melayu Rapid Rail Express Rail Link Sabah State Railway Inter-city rail Main Lines Current KTM West Coast Line KTM East Coast Line Western Sabah Railway Line Future MRL East Coast Rail Link Planned HSR Kuala Lumpur–Singapore high-speed rail Trans-Borneo Railway North Eastern Sabah Railway Line Sarawak Railway Line Services KTM ETS KTM Intercity Sabah State Railway International Express Eastern & Oriental Express Commuter rail Suburban Current KTM Komuter Central 1 Batu Caves–Pulau Sebang Line 2 Tanjung Malim–Port Klang Line Northern 1 Ipoh–Butterworth Line 2 Padang Besar–Butterworth Line Southern 1 Kulai–JB Sentral Line 2 Kempas Baru–Pasir Gudang Line Planned Kita Selangor Rail Line Airport Link Current ERL 6 KLIA Ekspres 7 KLIA Transit KTM Komuter 10 KL Sentral–Terminal Skypark Line Metro rail LRT Current Rapid KL 3 Ampang Line 4 Sri Petaling Line 5 Kelana Jaya Line 11 Shah Alam Line Future LRT Mutiara Line Planned LRT Kota Kinabalu Line MRT Current Rapid KL 9 Kajang Line 12 Putrajaya Line Planned 13 Circle Line Monorail Current 8 KL Monorail Melaka Monorail (suspended) Planned 14 Putrajaya Monorail Kota Kinabalu Monorail Border link Current KTM Intercity (Shuttle Tebrau) Future RTS Johor Bahru–Singapore Rapid Transit System Other rail People mover KLIA Aerotrain Funicular Penang Hill Railway Gondola lift Langkawi Cable Car Genting Skyway Awana Skyway Penang Hill Cable Car Rolling stock & manufacturers Inter-city KTM Class 23 KTM Class 24 KTM Class 25 YDM4 KTM Class 61 DMU KTM Class 91 EMU KTM Class 93 EMU KTM Class 94 EMU Kawasaki diesel locomotives DMU Commuter KTM Class 81 EMU KTM Class 82 EMU KTM Class 83 EMU KTM Class 92 EMU Airport link CNR Changchun ERL "Equator" EMU Siemens Desiro ET 425 M Hyundai Rotem KTM Class 83 EMU LRT CRRC Zhuzhou Articulated LRV "AMY" Bombardier Innovia ART 200/Metro 300 CRRC Zhuzhou LRV MRT Siemens Inspiro "The Guiding Light" Hyundai Rotem EMU Monorail Scomi SUTRA Others Bombardier CX-100 Doppelmayr Garaventa 100-FUL Lugano–Stazione Doppelmayr Garaventa 6-MGD Leitner Ropeways 8-MGD Depots Current KTM Batu Gajah Bukit Mertajam Bukit Tengah Gemas Kempas Baru Klang Padang Besar Port Klang Rawang Sentul Seremban Sabah State Railway Tanjung Aru ERL Salak Tinggi LRT Ampang Kuala Sungai Baru Subang MRT Serdang Sungai Buloh Kajang Monorail Brickfields Aerotrain KLIA MAHB Future Johan Setia (LRT) PSR-A (LRT) Sungai Dua (LRT) Ayer Panas (MRT) Taman Midah (MRT) Related articles 2021 Kelana Jaya LRT collision

---
Adapted from the Wikipedia article [Kita Selangor Rail Line](https://en.wikipedia.org/wiki/Kita_Selangor_Rail_Line) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Kita_Selangor_Rail_Line?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
