# Istrian Y

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Istrian_Y
> Markdown URL: https://mediated.wiki/source/Istrian_Y.md
> Source: https://en.wikipedia.org/wiki/Istrian_Y
> Source revision: 1336107289
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

{{Infobox road junction
|country=HRV
|road_type=A
|name=Istrian Y
|image=Istarski ipsilon.jpg
|image_caption=
|other_names={{langx|hr|Istarski ipsilon}}
|location=[Istria County](/source/Istria_County)
|coord= 
|roads= {{jct|country=HRV|E|751}}<br/>{{jct|country=HRV|A|8}}<br/>{{jct|country=HRV|A|9}}
|type=
|const=
|opened= 
|height=
|maint=[BINA Istra](/source/BINA_Istra)  
|tolls=Closed toll collection system
|map=
}}

The '''Istrian Y''' ({{langx|hr|Istarski ipsilon}}) is a [highway](/source/highway) network in the [Croatian highway network](/source/Highways_in_Croatia) & [TEN-T](/source/Trans-European_Transport_Network) network, maintained by [BINA Istra](/source/BINA_Istra) (from 1995 through at least 2027). It consists of two sections arranged in a shape similar to the letter ''Y'', located in [Istria County](/source/Istria_County):

*{{jct|A|8|country=HRV}} ([Matulji](/source/Matulji) – [Kanfanar](/source/Kanfanar_interchange))
*{{jct|A|9|country=HRV}} ([Plovanija](/source/Slovenia) – [Pula](/source/Pula) via Kanfanar)

== Eastern branch ==
{{main|A8 (Croatia)}}

The A8 is a {{convert|64.21|km|mi|abbr=on}} long branch which starts at [Matulji](/source/Matulji) in [Primorje-Gorski Kotar County](/source/Primorje-Gorski_Kotar_County) and finishes in [Kanfanar interchange](/source/Kanfanar_interchange), at the crossing with the A9. The branch was initially built as a single carriageway [limited-access road](/source/limited-access_road), but the part between Kanfanar and [Pazin](/source/Pazin) was projected as a [dual carriageway](/source/dual_carriageway), so all the objects on the road are already prepared for a conversion to a motorway.

The most prominent feature of this branch of Istrian Y is the {{convert|5.4|km|mi|abbr=on}} long [Učka Tunnel](/source/U%C4%8Dka_Tunnel), the third longest tunnel in Croatia. The tunnel was opened in 1981 and is the main road that connects the [Istrian peninsula](/source/Istria) with [Rijeka](/source/Rijeka) and the rest of Croatia (and the only road for vehicles over 5 tonnes<ref name=":0" />). The tunnel is tolled within a [closed toll collection system](/source/Closed_toll_collection) with the rest of the network.

The first part opened as full motorway, from Kanfanar to Rogovići, was opened for traffic in 2011. Then, sections between Rogovići - Cerovlje, Cerovlje - Lupoglav, and Lupoglav - Vranja, opened in consecutive years from 2020.

== Western branch ==
{{main|A9 (Croatia)}}

The A9 is a {{convert|76.79|km|mi|abbr=on}} long branch which connects the [Croatia](/source/Croatia)n-[Slovenia](/source/Slovenia)n border near [Sečovlje](/source/Se%C4%8Dovlje) with the city of [Pula](/source/Pula) and services the tourist industry on the western coast of Istria. Motorway was initially built as single carriageway [limited-access](/source/limited-access_road) road.

There are two prominent object on this branch of Istrian Y: the [viaduct](/source/viaduct) "Limska draga" and the [bridge](/source/bridge) "Mirna".  

The viaduct "Limska draga" was built between 1988 and 1991 and was the first part of the western branch of Istrian Y that was constructed. The bridge is 552 m long and the height of the highest pillon is 120 m.

The bridge "Mirna" was opened to traffic in 2005. The bridge represents the crossing over river [Mirna](/source/Mirna_River_(Croatia)) and was the most complicated object on the western branch of the Istrian Y because of the swampy terrain around the river. The bridge is 1355 m long and the height of the bridge at the highest point is 40 m. Currently the bridge is being tolled at the price of 14 [HRK](/source/Croatian_kuna) for passenger cars.

The southern leg of A9 motorway, between Kanfanar and Pula was opened as motorway for traffic in 2010. The northern leg of the A9 motorway, 50 km from [Umag](/source/Umag) to [Kanfanar](/source/Kanfanar), was opened as motorway for traffic on 14 June 2011, eight months before the deadline.<ref>{{cite web|url=http://www.ezadar.hr/clanak/kosor-otvorila-puni-profil-autoceste-na-istarskom-ipsilonu-od-kanfanara-do-umaga|title=Kosor otvorila puni profil autoceste na Istarskom ipsilonu od Kanfanara do Umaga|date=14 June 2011|language=Croatian|accessdate=15 June 2011}}</ref><ref>{{cite web|url=http://regionalexpress.hr/site/more/sveano-otvorena-dionica-autoceste-umag-kanfanar/|title=Svečano otvorena dionica autoceste Umag – Kanfanar | work=Regional Express - online magazin|date=14 June 2011|language=Croatian|accessdate=15 June 2011}}</ref>

== Upgrade ==

The network is undergoing extensive upgrade & refurbishment works<ref name=":0">{{Cite web |title=State Aid SA.56832 (2020/N) – Croatia – Sixth amendment to the concession agreement relating to the Istrian Y Motorway (sub-phase 2B2-1: section Vranja Interchange to the Učka tunnel/Kvarner portal) |url=https://ec.europa.eu/competition/state_aid/cases1/202040/286936_2193817_132_2.pdf |url-status=live |archive-url=https://web.archive.org/web/20230809204509/https://ec.europa.eu/competition/state_aid/cases1/202040/286936_2193817_132_2.pdf |archive-date=2023-08-09 |access-date=2023-08-09}}</ref>. The works are split into 2 primary phases, then into sub-phases and parts.alt= Geographical illustration of the Bina-Istra Istrian-Y network, with the phases for upgrades overlaid|thumb|Bina-Istra upgrade phases for the Istrian-Y|291x291px

=== Completed phases ===
* Phase 1 + 2A
** Construction of a dual-carriageway highway for the following sections:
*** Umag - Kanfanar - Pula (except for the [Mirna Bridge](/source/Mirna_Bridge) & [Limska Draga Viaduct](/source/Limska_Draga_Viaduct))
*** Kanfanar - [Rogovići](/source/Rogovi%C4%87i%2C_Ka%C5%A1telir-Labinci)
** Construction of a single-carriageway highway for the following sections:
*** Mirna Bridge
*** Limska Draga Viaduct
*** Rogovići - [Matulji](/source/Matulji) (via Učka Tunnel)
*** Pula - [Pomer](/source/Pomer%2C_Croatia)
*** [Plovanija](/source/Plovanija%2C_Istria_County) - Umag
* Phase 2B1
** Construction of a {{Convert|28|km|mi|abbr=on}} second carriageway between Rogovići & [Vranja](/source/Vranja)
* Phase 2B2-1 All works in the 3 sub-parts are estimated to cost a total of [EUR](/source/Euro) 191 million, including the costs for the new Učka Tunnel tube.
** Part A{{Further|Učka Tunnel#Upgrade}}
*** Construction of a new {{Convert|5.63|km|mi|abbr=on}} tube for Učka Tunnel
*** Construction of a {{Convert|1.9|km|mi|abbr=on}} second carriageway between Vranja and Učka Tunnel's Istrian portal
*** Construction of a {{Convert|0.45|km|mi|abbr=on}} second carriageway on Učka Tunnel's Kvarner portal
*** Construction of a new {{Convert|268.6|m|ft|abbr=on}} [Zrinšćak](/source/Zrin%C5%A1%C4%87ak) viaduct
*** Construction of a new Vranja interchange, including new toll-booth
*** Construction of new overpasses & underpasses
*** Construction of a connection road between the carriageways over the Istrian portals
*** Construction of two new toll-booths on either side of the Učka Tunnel
*** Construction of a new building for the firefighting unit near the Istrian portal
*** Demolition of one existing toll-booth on the existing Vranja interchange
** Part B
*** Replacement of the existing rest area with a full service station at the Kvarner portal
** Completed other works
*** Construction of a service station at Rebri to replace the service station at the Istrian portal
*** Upgrades to the existing tube's emergency and signalization systems
*** Construction of new service buildings at the Kvarner portal
** Other works
*** Construction of a new Učka Tunnel control room

=== Phases under construction ===
These phases were not confirmed until 2023<ref name=":1">{{Cite web |title=PUNI PROFIL ISTARSKOG IPSILONA USKORO GOTOV: Dionicu Cerovlje - Vranja pustit će se u promet prije roka. Evo i detalja o drugoj cijevi tunela Učka |trans-title=FULL PROFILE OF ISTRIAN Y YEAR COMING SOON: The Cerovlje – Vranje section will be opened to traffic before the deadline. Here are the details of the second pipe of the Učka tunnel |url=https://www.glasistre.hr/istra/puni-profil-istarskog-ipsilona-uskoro-gotov-dionicu-cerovlje-vranja-pustit-ce-se-u-promet-prije-roka-evo-i-detalja-o-drugoj-cijevi-tunela-ucka-699076 |url-status=live |archive-url=https://web.archive.org/web/20211009210800/https://www.glasistre.hr/istra/puni-profil-istarskog-ipsilona-uskoro-gotov-dionicu-cerovlje-vranja-pustit-ce-se-u-promet-prije-roka-evo-i-detalja-o-drugoj-cijevi-tunela-ucka-699076 |archive-date=2021-10-09 |access-date=2023-08-10 |website=Glas Istre |language=hr}}</ref><ref>{{Cite web |last=Pajić |first=Darko |date=2021-07-26 |title=Otvorena dionica Istarskog ipsilona od Cerovlja do Lupoglava u punom profilu: Do Matulja najkasnije 2025. |trans-title=Open section of the Istrian Y from Cerovlje to Lupoglav in full profile: To Matulji no later than 2025. |url=https://www.novilist.hr/novosti/otvorena-dionica-istarskog-ipsilona-od-cerovlja-do-lupoglava-u-punom-profilu/ |url-status=live |archive-url=https://web.archive.org/web/20211009210754/https://www.novilist.hr/novosti/otvorena-dionica-istarskog-ipsilona-od-cerovlja-do-lupoglava-u-punom-profilu/?meta_refresh=true |archive-date=2021-10-09 |access-date=2023-08-10 |website=Novi list |language=hr}}</ref><ref>{{Cite web |last=Đečević |first=Jasmin |date=2023-07-16 |title=Još samo 500 metara do probijanja druge cijevi tunela Učka. Evo koliko će trajati putovanje od Zagreba do Pule |trans-title=Only 500 meters left until the second pipe of the Učka tunnel is broken through. Here is how long the journey from Zagreb to Pula will take |url=https://www.novilist.hr/novosti/hrvatska/jos-samo-500-metara-do-probijanja-druge-cijevi-tunela-ucka-evo-koliko-ce-trajati-putovanje-od-zagreba-do-pule/ |url-status=live |archive-url=https://web.archive.org/web/20230716170712/https://www.novilist.hr/novosti/hrvatska/jos-samo-500-metara-do-probijanja-druge-cijevi-tunela-ucka-evo-koliko-ce-trajati-putovanje-od-zagreba-do-pule/ |archive-date=2023-07-16 |access-date=2023-08-23 |website=Novi list |language=en}}</ref>. Works on these phases were started after the official breakthrough of the second Učka Tunnel tube on the 18th September 2023<ref name=":2" />. They are intended to be complete by late 2026.

The completion of both these phases will mean the entire network will be a dual carriageway profile.

* Phase 2B2-2 This phase is estimated to cost a total of EUR 200 million<ref name=":2">{{Cite web |last=Đečević |first=Jasmin |date=2023-09-18 |title=Probijena druga cijev tunela Učka! U prometu će biti do idućeg ljeta, počela izgradnja dionice do Matulja |trans-title=The second tube of the Učka tunnel has been breached! It will be in traffic until next summer, the construction of the section to Matulje has begun |url=https://www.novilist.hr/novosti/hrvatska/foto-video-probijena-druga-cijev-tunela-ucka-u-prometu-ce-biti-do-iduceg-ljeta-pocela-izgradnja-dionice-do-matulja/ |url-status=live |archive-url=https://web.archive.org/web/20230919172119/https://www.novilist.hr/novosti/hrvatska/foto-video-probijena-druga-cijev-tunela-ucka-u-prometu-ce-biti-do-iduceg-ljeta-pocela-izgradnja-dionice-do-matulja/ |archive-date=2023-09-19 |access-date=2023-09-19 |website=Novi list |language=hr}}</ref>. When complete, the journey time between [Pula](/source/Pula) and [Zagreb](/source/Zagreb) should be approximately 2 and a half hours.
** Construction of a ~{{Convert|10|km|mi|abbr=on}} second carriageway between Matulji & Učka Tunnel's Kvarner portal
** Construction of an improved junction at Anđeli
** Construction of drainage and management facilities to reduce the release of harmful liquids from vehicles into the environment<ref name=":1" />
* Phase 2B2-3
** Construction of a second carriageway for the Mirna Bridge & Limska Draga Viaduct

=== Remaining phases ===
* Phase 2B2-4
** Construction of emergency lanes for some unprotected sections
== See also ==
* [BINA Istra](/source/BINA_Istra)

== References ==
{{reflist}}

== External links ==
* [http://www.viadukt.hr/projekti/objekti/vijadukt-limska-draga Viadukt company web-page about the viaduct]
* [https://web.archive.org/web/20070606205815/http://www.istra-istria.hr/ The web page of Istria county, containing regulatory plans]

{{CroatianMotorways}}

Y
Category:Motorways in Croatia

---
Adapted from the Wikipedia article [Istrian Y](https://en.wikipedia.org/wiki/Istrian_Y) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Istrian_Y?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
