# Interstate 189

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Interstate_189
> Markdown URL: https://mediated.wiki/source/Interstate_189.md
> Source: https://en.wikipedia.org/wiki/Interstate_189
> Source revision: 1304325631
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

Highway in Vermont

Interstate 189 I-189 highlighted in red Route information Auxiliary route of I-89 Maintained by VTrans Length 1.49 mi[1] (2.40 km) NHS Entire route Major junctions West end US 7 at the South Burlington–Burlington city line East end I-89 / Dorset Street / Kennedy Drive in South Burlington Location Country United States State Vermont Counties Chittenden Highway system Interstate Highway System Main Auxiliary Suffixed Business Future State highways in Vermont ← VT 155 → VT 191

**Interstate 189** (**I-189**) is an [auxiliary Interstate Highway](/source/Auxiliary_Interstate_Highway) in [Chittenden County, Vermont](/source/Chittenden_County%2C_Vermont). The spur extends for 1.49 miles (2.40 km) from [I-89](/source/Interstate_89_in_Vermont) exit 13 in [South Burlington](/source/South_Burlington%2C_Vermont) to [US Route 7](/source/U.S._Route_7_in_Vermont) (US 7) at the [Burlington](/source/Burlington%2C_Vermont) city limit. I-189 is the only auxiliary route of I-89 and the only auxiliary Interstate Highway in Vermont.

## Route description

I-189 serves as an Interstate-grade connector between I-89 and a commercial district along US 7 (Shelburne Road). It is signed as an east–west highway. Prior to 2010, only one directional sign had been posted on the highway, on the eastbound side after the on-ramp from US 7. Sign replacements and additions in late 2010 added directional signs on both the eastbound and westbound sides of the route.

## History

Unused section of the Champlain Parkway to the west of US 7; the current interchange is visible in the distance. Construction has begun on this segment since then.

The concept of I-189, known as the Southern Connector, and the Champlain Parkway into the city of Burlington along the waterfront and service an industrial area was first made in the mid-1960s. The construction of the C-1 Section (I-189/U.S. Route 7 interchange to Home Avenue), began construction sometime in the late 1980s, It was nearly completed in 1989, but the remediation plan development for the Pine Street Barge Canal Superfund Site delayed the construction of the C-2 Section (Home Avenue to Lakeside Avenue) and the C-8 Section (Lakeside Avenue to Battery Street through the Pine Street Barge Canal Superfund Site), and due to continued legal challenges. These challenges mostly came from the Pine Street Coalition, who argued the project was unnecessary and too costly as well as discriminatory due to the increased traffic in the low-income and minority residents of King and Maple streets neighborhood.[2] The original Southern Connector project was eventually canceled as the city largely left behind its industrial past in favor of tourism in the 1980s and the roadway was abandoned just beyond the US 7 interchange. As a result, [Jersey barriers](/source/Jersey_barrier) are in place on I-189 west directing traffic onto the US 7 offramp, orphaning approximately 0.65 miles (1.05 km) of road, along with a few ramps. More support of the project in recent years has led to a resumption of construction.[3]

## Future

The federal government previously gave the state a deadline to make a final decision on building the extension or they would lose matching funds. In early 2012[\[update\]](https://en.wikipedia.org/w/index.php?title=Interstate_189&action=edit), consensus settled on a two-lane parkway named the "Champlain Parkway" that will run northerly from Home Avenue for about 0.7 miles (1.1 km), then curve onto existing city streets in order to funnel traffic into downtown away from US 7.[4] I-189 will extend westward, then turn to the north, terminate at Home Avenue, and connect to the parkway. In August 2014, the parkway received its land use permit, clearing the way for the project to begin.[5] Opposition to the $30-million project and changes to its design led to delays in construction,[6][7] which finally began in June 2022.[8] The segment of the parkway between Home and Lakeside Avenues opened in August 2024, with the entire highway going into service in 2026.[9][10]

## Exit list

The entire route is in [South Burlington](/source/South_Burlington%2C_Vermont), [Chittenden County](/source/Chittenden_County%2C_Vermont). All exits are unnumbered.

mi[11] km Destinations Notes Champlain Parkway – Burlington Future continuation north 0.000 0.000 US 7 – Shelburne, Middlebury, Rutland, Burlington Current western terminus I-89 – Winooski, St. Albans, Williston, Montpelier Eastbound exit and westbound entrance; exit 13 (milepost exit 87) on I-89 1.488 2.395 Dorset Street / Kennedy Drive – Burlington International Airport Eastern terminus; at-grade intersection 1.000 mi = 1.609 km; 1.000 km = 0.621 mi Incomplete access Unopened

## Images

		- Eastern terminus (August 2014)

		- Western terminus (August 2014)

		- Looking east at a sign for I-189

		- Looking south at the abandoned section of the Champlain Parkway with a makeshift skate park and graffiti

		- Looking north at the abandoned section

## References

1. **[^](#cite_ref-1)** Starks, Edward (January 27, 2022). ["Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways"](https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table02.cfm). *FHWA Route Log and Finder List*. [Federal Highway Administration](/source/Federal_Highway_Administration). Retrieved September 10, 2022.

1. **[^](#cite_ref-2)** ["Pine Street Canal Superfund"](http://yosemite.epa.gov/r1/npl_pad.nsf/f52fa5c31fa8f5c885256adc0050b631/F8CFE11E53EFA23C8525691F0063F6E8?OpenDocument). Retrieved October 5, 2014.{{[cite web](https://en.wikipedia.org/wiki/Template:Cite_web)}}: CS1 maint: deprecated archival service ([link](https://en.wikipedia.org/wiki/Category:CS1_maint:_deprecated_archival_service))

1. **[^](#cite_ref-189+Parkway_3-0)** Crowley, Patrick (May 17, 2023). ["Federal judge rules in favor of Burlington in Champlain Parkway lawsuit"](https://vtdigger.org/2023/05/17/federal-judge-rules-in-favor-of-burlington-in-champlain-parkway-lawsuit/). *VTDigger*. Retrieved May 21, 2023.WCAX News (May 17, 2023). ["Ruling paves the way for part of Champlain Parkway to open next year"](https://www.wcax.com/2023/05/17/federal-judge-clears-champlain-parkway-construction/). Retrieved May 18, 2023.

1. **[^](#cite_ref-4)** ["Champlain Parkway project map"](https://web.archive.org/web/20151128103512/http://www.champlainparkway.org/alignmentmap/index.cfm). Archived from [the original](http://www.champlainparkway.org/alignmentmap/index.cfm) on November 28, 2015. Retrieved December 7, 2015.

1. **[^](#cite_ref-5)** WCAX News (August 26, 2014). ["Champlain Parkway Wins Act 250 Permit"](http://www.wcax.com/story/26373175/champlain-parkway-wins-act-250-permit). Retrieved October 5, 2014.{{[cite web](https://en.wikipedia.org/wiki/Template:Cite_web)}}: CS1 maint: deprecated archival service ([link](https://en.wikipedia.org/wiki/Category:CS1_maint:_deprecated_archival_service))

1. **[^](#cite_ref-6)** Liguori, Priscilla (November 16, 2017). ["Will construction for the Champlain Parkway finally begin?"](http://www.wcax.com/content/news/Will-construction-for-the-Champlain-Parkway-finally-begin-458141643.html). WCAX. Retrieved July 16, 2018.

1. **[^](#cite_ref-7)** Battipaglia, Helena (May 21, 2018). ["Residents ask planners to reconsider long-delayed Champlain Parkway project"](http://www.mynbc5.com/article/woman-s-emotional-support-pig-facing-eviction/22184174). NBC5. Retrieved July 16, 2018.

1. **[^](#cite_ref-8)** WCAX News (June 21, 2022). ["Champlain Parkway Construction Resumes"](https://www.wcax.com/2022/06/21/construction-resumes-burlingtons-champlain-parkway-after-30-plus-years/). Retrieved June 25, 2022.

1. **[^](#cite_ref-9)** McDonald, Corey (August 20, 2024). ["Burlington cuts the ribbon on 'middle segment' of Champlain Parkway"](https://vtdigger.org/2024/08/20/burlington-cuts-the-ribbon-on-middle-segment-of-champlain-parkway/). *VTDigger*. Retrieved November 13, 2024.

1. **[^](#cite_ref-10)** Bewlay, Sid (August 20, 2024). ["Phase 1 of the Champlain Parkway Project opens, after more than 50 years of back and forth"](https://www.mynbc5.com/article/champlain-parkway-project-opening-burlington/61924106). *WPTZ*. Retrieved November 13, 2024.

1. **[^](#cite_ref-2006log_11-0)** ["2006 (Route Log) AADTs – State Highways"](https://web.archive.org/web/20090326060709/http://www.aot.state.vt.us/Planning/Documents/TrafResearch/Publications/2006%20Route%20Log%20AADTs%20State%20Highways-Final.pdf) (PDF). [Vermont Agency of Transportation](/source/Vermont_Agency_of_Transportation). June 2007. Archived from [the original](http://www.aot.state.vt.us/Planning/Documents/TrafResearch/Publications/2006%20Route%20Log%20AADTs%20State%20Highways-Final.pdf) (PDF) on March 26, 2009. Retrieved May 16, 2009.

## External links

Wikimedia Commons has media related to [Interstate 189](https://commons.wikimedia.org/wiki/Category:Interstate_189).

**[KML file](https://en.wikipedia.org/w/index.php?title=Template:Attached_KML/Interstate_189&action=raw)** ([edit](https://en.wikipedia.org/w/index.php?title=Template:Attached_KML/Interstate_189&action=edit) · [help](https://en.wikipedia.org/wiki/Help:Attached_KML))

[Template:Attached KML/Interstate 189](https://en.wikipedia.org/wiki/Template:Attached_KML/Interstate_189)

KML is from Wikidata

- [Champlain Parkway Project](http://champlainparkway.com/map/)

- [Champlain Parkway History](http://champlainparkway.com/history/)

v t e Auxiliary routes of Interstate 89 Vermont 189 2891 Business1 1Former

v t e City of Burlington Mayor (Emma Mulvaney-Stanak) Metropolitan area County Lake Champlain Champlain Valley General Buildings Climate Flag Government History (timeline) Mayors Media Notable people Transportation Economy Bruegger's Burlington International Airport Burton Snowboards Green Mountain Transit (GMT) Church Street Marketplace Burlington Town Center Creston Electric Instruments Dan's Chocolates Gardener's Supply Company Interstate highways I-89 I-189 Lake Champlain Transportation Company Rhino Foods Seventh Generation Inc. Education Burlington College Burlington High School Burlington School District Champlain College Rock Point School Trinity College (defunct) University of Vermont University of Vermont Medical Center Sports Green Mountain Roller Derby Vermont Catamounts Gutterson Fieldhouse Vermont City Marathon Vermont Lake Monsters Centennial Field Vermont Lumberjacks Culture Battery Park The BCA Center Burlington Memorial Auditorium Champ Champlain Valley National Heritage Area ECHO, Leahy Center for Lake Champlain House of LeMay Island Line Trail Little Jerusalem Maypo Phish Religion in Burlington Fleming Museum Vermont Mozart Festival

---
Adapted from the Wikipedia article [Interstate 189](https://en.wikipedia.org/wiki/Interstate_189) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Interstate_189?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
