# Hackberry Wind Project

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Hackberry_Wind_Project
> Markdown URL: https://mediated.wiki/source/Hackberry_Wind_Project.md
> Source: https://en.wikipedia.org/wiki/Hackberry_Wind_Project
> Source revision: 1299015921
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

{{Short description|Wind-powered electricity generating facility in Texas, USA}}
{{Use American English|date=July 2025}}
{{Infobox power station
| name = Hackberry Wind Project
| name_official = 
| image = 
| image_size = 
| image_caption = 
| image_alt = 
| location_map_size = 
| location_map_caption = 
| coordinates = {{coord|32|49|27|N|99|16|42|W|type:landmark|display=inline,title}}
| coordinates_ref = 
| country = United States
| location = 177 Private Road Albany, TX 76430
| status = O
| construction_began = 
| commissioned = 2008
| decommissioned = 
| cost = 
| owner = 
| operator = 
| ps_units_operational = 72
| ps_units_manu_model = [Siemens Wind Power](/source/Siemens_Wind_Power)
| wind_hub_height = 
| wind_rotor_diameter = 
| wind_rated_speed = 
| wind_farm_type = 
| wind_site_elevation = 
| wind_site_usage = 
| wind_site_area = 
| wind_offshore_depth = 
| wind_offshore_distance = 
| ps_electrical_capacity = 166 [MW](/source/Megawatt)
| ps_electrical_cap_fac = 
| website = 
| extra = 
}}

The '''Hackberry Wind Project''' is a US $350 million [wind farm](/source/wind_farm) in [Shackelford County, Texas](/source/Shackelford_County%2C_Texas). The project consists of 72&nbsp;[Siemens](/source/Siemens_Wind_Power) [wind turbines](/source/wind_turbines) with a total capacity of 166 [megawatts](/source/megawatts).<ref name=":0" /> The energy is used by residents of the [City of Austin](/source/City_of_Austin) and surrounding communities, this usage is called a PPA or Power Purchase Agreement.<ref name=":1">{{Cite web |title=Skyline Renewables to acquire second wind farm in Texas |url=https://www.windpowerengineering.com/skyline-renewables-to-acquire-second-wind-farm-in-texas/ |access-date=2023-03-22 |website=Windpower Engineering & Development |language=en-US}}</ref>  Construction on the project began in January 2008 and was finished in December 2008, on-time and under budget.<ref name=":0">[http://www.renewableenergyworld.com/rea/news/article/2009/01/res-americas-completes-166-mw-hackberry-wind-project-54523 RES Americas Completes 166-MW Hackberry Wind Project]</ref><ref name=":1" />

==See also==
{{stack|{{Portal|Texas|Weather|Renewable energy}}}}
*[List of wind farms](/source/List_of_wind_farms)
*[Wind power in the United States](/source/Wind_power_in_the_United_States)
*[Wind power in Texas](/source/Wind_power_in_Texas)

==References==
{{Reflist}}

{{Wind power in the United States}}

Category:Energy infrastructure completed in 2008
Category:Wind farms in Texas
Category:Buildings and structures in Shackelford County, Texas

---
Adapted from the Wikipedia article [Hackberry Wind Project](https://en.wikipedia.org/wiki/Hackberry_Wind_Project) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Hackberry_Wind_Project?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
