# Conductor pipe

> Mediated Wiki article. Canonical URL: https://mediated.wiki/source/Conductor_pipe
> Markdown URL: https://mediated.wiki/source/Conductor_pipe.md
> Source: https://en.wikipedia.org/wiki/Conductor_pipe
> Source revision: 1304943877
> License: Creative Commons Attribution-ShareAlike 4.0 International (https://creativecommons.org/licenses/by-sa/4.0/)

Oil well and borehole component

A **conductor pipe** is a large diameter pipe that is set into the ground to provide the initial stable structural foundation for a [borehole](/source/Borehole) or [oil well](/source/Oil_well).[1] It is the first string of casing, and of the largest diameter installed into a well. It can also be referred to as a *drive pipe* because it is often *driven* into the ground with a [pile driver](/source/Pile_driver).

Conductor pipes are typically set into petroleum wells before any drilling operations are performed. It is usually set with special pile-driving or spudder rigs, though a [drilling rig](/source/Drilling_rig_(petroleum)) is sometimes used to save time and money. The pipe's purpose is to protect shallow sands from being contaminated by drilling fluids, and to prevent washouts, which occur near the surface due to loose and unconsolidated top soils and gravel beds.[2]

Conductor Casing

In the [offshore drilling](/source/Offshore_drilling) industry, the conductor pipe is set in the seabed, and is a key structural foundation for the subsea [wellhead](/source/Wellhead). When drilling an offshore well, a [marine riser](/source/Marine_riser) is connected to the well, and this is subjected to large environmental forces such as current and waves which are transferred to the conductor. The forces can be large and also cyclical which can potentially cause fatigue damage to the conductor, especially in harsh environmental conditions. A Conductor tensioner unit (CTU) can be used in shallow water on [jackup rig](/source/Jackup_rig) to withstand such damaging forces.

Conductors are sometimes driven into position in very soft formations with large hammers. Sometimes, they are jetted into position and at other times, a separate cheaper rig (even truck mounted) may be used to drill the hole for the conductor. Offshore, two conductors may be installed in a well. The first conductor might be driven into position and not reach a depth sufficient for installation of a BOP. Usually secondary conductors are cemented to surface.

WB Diagram Conductor Pipe location

## References

1. **[^](#cite_ref-1)** [Conductor Pipe - Schlumberger Oilfield Glossary](http://www.glossary.oilfield.slb.com/Terms/c/conductor_pipe.aspx)

1. **[^](#cite_ref-2)** ["conductor pipe - Schlumberger Oilfield Glossary"](https://www.glossary.oilfield.slb.com/en/Terms/c/conductor_pipe.aspx). *www.glossary.oilfield.slb.com*. Retrieved 2019-04-22.

This article related to natural gas, petroleum or the petroleum industry is a stub. You can help Wikipedia by adding missing information.

- [v](https://en.wikipedia.org/wiki/Template:Petroleum-stub)
- [t](/source/Template_talk%3APetroleum-stub)
- [e](https://en.wikipedia.org/wiki/Special:EditPage/Template:Petroleum-stub)

---
Adapted from the Wikipedia article [Conductor pipe](https://en.wikipedia.org/wiki/Conductor_pipe) by Wikipedia contributors ([contributor history](https://en.wikipedia.org/wiki/Conductor_pipe?action=history)). Available under [Creative Commons Attribution-ShareAlike 4.0 International](https://creativecommons.org/licenses/by-sa/4.0/). Changes may have been made.
